Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- SVP-98-315, Responds to NRC Re Violations Noted in Insp Repts 50-254/97-23,50-265/97-23,50-254/98-11 & 50-265/98-11. Corrective Actions:Extended Shutdown for Both Units Was Conducted for Approx One Reactor Year + (ML20154N370)
- IR 05000412/1986004 + (ML20154N371)
- RA-98-065, Application Requesting Termination of QA Program Approval 0891 for Shipment of 239 Plutonium-Beryllium Neutron Sources + (ML20154N373)
- IR 05000483/1998020 + (ML20154N375)
- ML20154N376 + (ML20154N376)
- ML20154N377 + (ML20154N377)
- ML20154N378 + (ML20154N378)
- ML20154N383 + (ML20154N383)
- ML20154N385 + (ML20154N385)
- ML20154N386 + (ML20154N386)
- ML20154N387 + (ML20154N387)
- IR 05000454/1986009 + (ML20154N388)
- RBG-28874, NPDES Noncompliance Notification:On 880917,sample from Outfall 001,cooling Tower Blowdown,Indicated Ph of 3.1 Su. Caused by Pumping of Sulfuric acid-contaminated Rainwater Into Circulating Water Flume.More Stringent Controls Added + (ML20154N389)
- ML20154N393 + (ML20154N393)
- ML20154N394 + (ML20154N394)
- ML20154N396 + (ML20154N396)
- IR 05000312/1988024 + (ML20154N397)
- 05000271/LER-1988-005, :on 880417,replacement Tygon Tubing Increased Vertical Height of Drain Loop Seals for Both Standby Gas Treatment Trains.Cause Undetermined.Tubing Repaired to Return Subj Loop to Original Height + (ML20154N400)
- ML20154N401 + (ML20154N401)
- ML20154N402 + (ML20154N402)
- ML20154N405 + (ML20154N405)
- ML20154N409 + (ML20154N409)
- ML20154N410 + (ML20154N410)
- ML20154N411 + (ML20154N411)
- NLS8600113, Application for Amend to License DPR-46,changing Main Steam Line High Flow Setpoint for Primary Containment Isolation from 140% to 150% of Rated Steam Flow.Ge MDE-43-0386 Safety Evaluation... Also Encl + (ML20154N412)
- ML20154N413 + (ML20154N413)
- ML20154N414 + (ML20154N414)
- PNO-IV-88-078, on 880923,util Plans to Begin Scheduled Outage to Inspect Bottom Mounted Instrument (Bmi) Tubes.On 880506, Util Reported That Review of Eddy Current Test Data on 58 Bmi Thimble Tubes Revealed Wear on 19 Thimble Tubes + (ML20154N415)
- ML20154N419 + (ML20154N419)
- ML20154N420 + (ML20154N420)
- ML20154N421 + (ML20154N421)
- 05000293/LER-1988-013, :on 880425,inadvertent Manual Start of Emergency Diesel Generator (EDG) B Occurred.Caused by Personnel Error.Improvements to Local Control Panel to EDG Identified & Tracked + (ML20154N422)
- ML20154N423 + (ML20154N423)
- ML20154N424 + (ML20154N424)
- ML20154N425 + (ML20154N425)
- ML20154N426 + (ML20154N426)
- ML20154N427 + (ML20154N427)
- ML20154N428 + (ML20154N428)
- ML20154N430 + (ML20154N430)
- ML20154N433 + (ML20154N433)
- ML20154N436 + (ML20154N436)
- ML20154N437 + (ML20154N437)
- LD-88-088, Provides Proposed Resolution for Single Issue of Advanced Reactor Severe Accident Program Topic Paper Set 4, Essential Equipment Performance + (ML20154N440)
- ML20154N442 + (ML20154N442)
- ML20154N443 + (ML20154N443)
- ML20154N444 + (ML20154N444)
- ML20154N445 + (ML20154N445)
- ML20154N446 + (ML20154N446)
- ML20154N447 + (ML20154N447)
- ML20154N450 + (ML20154N450)
- ML20154N453 + (ML20154N453)