ML20154N426

From kanterella
Jump to navigation Jump to search
Amend 38 to License NPF-38,changing App a Tech Specs by Revising Tech Specs Table 3.6-2 Re Containment Isolation Valves & Table 3.6-1 Re Containment Leakage Paths
ML20154N426
Person / Time
Site: Waterford 
(NPF-38-A-038, NPF-38-A-38)
Issue date: 05/25/1988
From: Calvo J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20154N431 List:
References
NUDOCS 8806020300
Download: ML20154N426 (9)


Text

'f* %'o UNITED STATES 8

g NUCLEAR REGULATORY COMMISSION o

5 t E WASHINGTON, D. C. 20655 l

.....p

~

LOUISIANA POWER AND LIGHT COMPANY DOCKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION, UNIT 3 AMENOMENT TO FACILITY OPERATING LICENSE Amendment No. 38 License No. NPF-38 1.

The Nuclear Regulatory Commission (the Comission) has found that:

A.

The application for amendment by Louisiana Power and Light Company (the licensee) dated January 13, 1988 as supplemented by letter dated May 6,1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amencment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

8806020300 800525 PDR ADOCK 05000302 P

PDR

. 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No.

NPF-38 is hereby amended to read as follows:

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Ar.endment No. 38, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

,z '

(h. b bl.w Jose A. Calvo, Director Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: flay 25,1988 J

'a ATTACHMENT TO LICENSE AMENDMENT NO. 38 TO FACILITY OPERATING LICENSE NO. NPF-38 DOCKET NO. 50-382

+

Replace the following pages of the Appendix A Technical Specifications with-the attached pages. The revised pages are identified by Amendment number and contain vertical lines indicating the areas of change. The corresponding overleaf pages are also provided to maintain document completeness.

Remove Insert 3/4 6-6 3/4 6-6 3/4 6-24 3/4 6-24 3/4 6-28 3/4 6-28 i

5E TABLE 3.6-1

--e m

1 CONTAINMENT LEAKAGE PATHS l

ES

]'

PENETRATION NO.

SYSTEM NAME VALVE TAG NO.

TEST TYPE Ei 7

Demineralized Water 2DW-V609A/B (PMU 151)

Bypass / Type C 2DW-V610 (PMU 152) u, 8

Station Air 2SA-V610A/B (SA 908)

Bypass / Type C 2SA-V602A/B (SA 909)

I 9

Instrument Air 2IA-F601A/B (IA 909)

Bypass / Type C 2IA-V602A/B (IA 910) i 10 Containment Purge 2HV-B151A (CAP 103)

Type C j

Inlet 2HV-B152A (CAP 104) 4 u,

3:

11 Containment Purge 2HV-B154B (CAP 204)

Type C j

os Exhaust 2HV-B1538 (CAP 203) i o

12 Containment Vacuum 2HV-8157B (CVR 101)

Type C

}

Relief 2HV-B1818 (CVR 102 I

i l

13 Containment Vacuum 2HV-B156A (CVR 201)

Type C l

Relief 2HV-V181B (CVR 202)

{

14 Nitrogen Systems

'2NG-F604 (NG 157)

Bypass / Type C Supply to Reactor Bldg 2NG-V666 (NG 158) 1 l

Type C j

Cooler 2CC-V242A/B (CC-644) i'

Type C

]

Cooler 2CC-F243A/B (CC-710) 4 25 Fuel Transfer Containment Bypass / Type B 1

& Fuel Handling Building i

I l

  • Thest penetrations shall be tested prior to STARTUP following first refueling outage.

i

TABLE 3.6-1 (Continued)

E$

CONTAINMENT LEAKAGE PATHS 9g PENETRATION NO.

SYSTEM NAME VALVE TAG NO.

TEST TYPE B

26 Chemical & Volume Control 2CH-F1518A/B (CVC 109)

Bypass / Type C Letdown Line ICH-F2501A/B (CVC 103) ci'i H

28 Sampling Line from Reactor 2SL-F1504A/B (PSL 107)

Bypass / Type C w

Coolant Line 2SL-F1501A/B (PSL 105) 29 Sampling Line from 2SL-F1505A/B (PSL 204)

Bypass / Type C Pressurizer Surge Line 2SL-F1502A/B (PSL 203) 30 Sampling Line from 2SL-F1506A/B (PSL 304)

Bypass / Type C Pressurizer Steam Space 2SL-F1503A/B (PSL 303) 31 Waste Management from 2WM-F158A/B (GWM 105)

Bypass / Type C Containment Vent Header 2WM-F157A/B (GWM 104)

R 42 Containment Sump Pump 2WM-F105A/B (SP 106)

Bypass Type C

]l T

Discharge / Post Accident 2WM-F104A/B (SP 105) m Sample Return 43 Boron Management Reactor 2BM-F109A/B (BM 110)

Bypass / Type C j

Drain Tank Outlet 2BM-F108A/B (BM 109) 44 Chemical & Volume Control 2CH-F1512A/B (CVC 401)

Bypass / Type C from Reactor Pump 2CH-F1513A/B (RC 606)

Controlled Bleedoff i

45 CARS Makeup to 2HV-B1878 (CAR 101B)

Bypass / Type C Containment 2HV-V185B (CAR 1028) k 46 CARS Makeup to 2HV-B188A (CAR 101A)

Bypass / Type C g

Containment 2HV-V184A (CAR 102A) 47 CARS Exhaust from 2HV-F2298 (CAR 2028)

Bypass / Type C l'

Containment 2HV-F254B (CAR 201B) o

{

Containment Pressure Exhaust 2HV-F228A (CAR 200B) l i

TABLE 3.6-2 (Continued)

A

}

CONTAINMENT ISOLATION VALVES **

PENETRATION VALVE MAXIMUM i

NUMBER NUMBER FUNCTION ISOLATION TIME (Seconds) 2 E

1.

Containment Isolation (Continued) 49 2CA-E604B (ARM 109)

Containment Atmosphere Monitor 5

I 49 2CA-E606E (ARM 103)

Containment Atmosphere Monitor 5

52 2SL-F602 (PSL406A)

Steam Generator Blowdown Sample 10 52 2SL-F601 (PSL404A)

Steam Generator Blowdown Sample 10 53 2HV-E634A (CVR401A)

Containment Vacuum Relief Instrument Line 5

w1 m

59 2SI-F1561A/B (SI343)

SIT Drain to RWSP 10 E

i 60 2FP-F127 (FP601A)

Containment Fire Water Header 10 61 2FP-F129 (FP6018)

Containment Fire Water Header 10 65 2HV-E633B (CVR401B)

Containment Vacuum Relief Instrument Line 5

j 66 2HA-E609A (HRA110A)

Hydrogen Analyzer 5

66 2HA-E608A (HRA109A)

Hydrogen Analyzer 5

l 66 2HA-E610A (HRA126A)

Hydrogen Analyzer 5

67 2HA-E6298 (HRA1108)

Hydrogen Analyzer 5

67 2HA-E6288 (HRA109B)

Hydrogen Analyzer 5

67 2HA-E630B (HRA126B)

Hydrogen Analyzer 5

i

TABLE 3.6-2 (Continued) k CONTAINMENT ISOLATION VALVES **

Eg PENETRATION VALVE MAXIMUM g

NUMBER NUMBER FUNCTION ISOLATION TIME (Seconds) 1.

Containment Isolation (Continued) 68 2SL-F604 (PSL406B)

Steam Generator Blowdown Sample 10 68 2SL-F603 (PSL404B)

Steam Generator Blowdown Sample 10 2.

Containment Purge (CIAS/CPIS) 10 2HV-B151A (CAP 103)

Containment Purge Inlet 5

10 2HV-B152A (CAP 104)

Containment Purge Inlet 5

11 2HV-B154B (CAP 204)

Containment Purge Outlet 5

11 2HV-8153B (CAP 203)

Containment Purge Outlet 5

47 2HV-F228A (CAR 200B)

Containment Pressure Exhaust 5

- )

47 2HV-F229B (CAR 2028)

CARS Exhaust 5

4 3.

Safety Injection Actuation Signal (SIAS) 26 1CH-F2501A/B(CVC103)

CVCS Letdown 10 1

32 2SI-L101A (SI 602A)

SI from SIS St.mo N.A.

[

33 2SI-L1028 (SI 6028)

SI from SIS Sump N.A.

i E

4.

Main Steam Isolation Signal (MSIS) o

[

1 2MS-V602A (MS 124A)

Main Steam N.A.

?

1 2MS-F714 (SSL 301A)

Main Steam Sample N.A.

g 2

2MS-V6048 (MS 1248)

Main Steam N.A.

  • e

_ - - - -. ~ - -.. - - _ - _

-_.-_a--a__--__.__._--__--a

jE TABLE 3.6-2 (Continued)

M CONTAINMENT ISOLATION VALVES **

O PENETRATION VALVE MAXIMUM NUMBER NUMBER FUNCTION ISOLATION TIME (Seconds) i E

6.

Manual / Remote Manual (Continued)

]

16 2CC-F16182 (CC 823B)*

CCW from Containment N.A.

j Fan Cooler Units l

17 2CC-F158A1 (CC 823A)*

CCW from Containment N.A.

Fan Cooler Units 18 2CC-F154A1 (CC 807A)*

CCW to Containment N.A.

Fan Cooler Units h

19 2CC-F159A2 (CC 822A)*

CCW from Containment N.A.

Fan Cooler Units e

)

E

'd 20 2CC-F155A2 (CC 808A)*

CCW to Containment N.A.

Fan Cooler Units 21 2CC-F156B1 (CC 8088)*

CCW to Containment N.A.

Fan Cooler Units 22 2CC-F160B1 (CC 822B)*

CCW from Containment N.A.

Fan Cooler Units 27 2CH-F1529A/B (CVC 209)*

CVCS Charging Line N.A.

27 1CH-F2505A (CVC 216A)*

CVCS Auxiliary Spray N.A.

27 1CH-F2505B (CVC 216B)*

CVCS Auxiliary Spray N.A.

27 1CH-F2504B (CVC 2188)*

CVCS Charging Line N.A.

27 1CH-F2503A (CVC 218A)*

CVCS Charging Line N.A.

I

TABLE 3.6-2 (Centinued)

CONTAINMENT ISOLATION VALVES **

PENETRATION VALVE MAXIMUM g

NUMBER NUMBER FUNCTION ISOLATION TIME (Seconds)-

6.

Manual / Remote Manual (Continued) 34A&B 2CS-F305A (CS 125A)*

Containment Spray N.A.

34A&B 2CS-E608A (CS 129A)*

Containment Spray M.A.

35A&B 2CS-F306B (CS 125B)*

Containment Spray N.A.

35A&B 2CS-E609B (CS 129B)*

Containment Spray N.A.

I 36 2SI-V1549Al (SI 1398)*

SI from LPSI Pumps N.A.

37 2SI-V1539B1 (SI 1388)*

SI from LPSI Pumps N.A.

38 2SI-V1541A2 (SI 139A)*

SI from LPSI Pumps N.A.

39 2SI-V154382 (SI 138A)*

SI from LPSI Pumps N.A.

40 2SI-V326B (SI407B)*

Shutdown Cooling N.A.

j 40 1SI-V1501B (SI405B)*

Shutdown Cooling N.A.

l 41 2SI-V327A (SI407A)*

Shutdown Cooling N.A.

41 ISI-V1503A (SI405A)*

Shutdown Cooling N.A.

l l

[

45 2HV-8187B (CAR 101B)*

CARS Makeup N.A.

l E

46 2HV-B188A (CAR 101A)*

CARS Makeup N.A.

i a

I

=

1 I

.