ML20154N378
| ML20154N378 | |
| Person / Time | |
|---|---|
| Site: | Byron, Braidwood, 05000000 |
| Issue date: | 03/11/1986 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20154N382 | List: |
| References | |
| NUDOCS 8603170308 | |
| Download: ML20154N378 (2) | |
See also: IR 05000454/1986009
Text
py
(
-
4
MAR 111986
-
Docket No. 50-454
Docket No. 50-455
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the special safety inspection conducted by Messrs. J. Muffett
and J. Gavula of this office on February 25 and 26,1986, at Sargent and Lundy
offices in Chicago, of activities at Byron Station, Units 1 and 2 and Braidwood
Station, Units 1 and 2, authorized by NRC Operating License No. NPF-37 and NRC
Construction Permits No. CPPR-131, No. CPPR-132, No. CPPR-133 and to the discussion
of. our findings with Mr. A. Dermenjian and others of Sargent and Lundy's staff
at the conclusior, cf the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
C.1*351[S'3iifbyTJ.'!btrhen
J. J. Harrison, Chief
Engineering Branch
Enclosures:
Inspection
Report No. 50-454/86009(DRS);
Report No. 50-455/86008(DRS);
Report No. 50-456/86011(DRS); and
Report No. 50-457/86009(DRS)
l
See Attached Distribution
III
RIII
RIII
RIII
RII
R
RI
'
d @avula/jlk Ju.)(4
l
Muffett
Dan el on
y
11
ardper
HrrlK
ison
3/ojg(s
3lIO
]{v h
3/ttll0
3lnMb
'b
e60317030s 860
54
<
.
ADOCK O
G
l
[
Z40/
-
..;
,
G'
Commonwealth Edison Company
2
g4pyz 1 1 Iggg
Distribution
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
V. I. Schlosser, Project Manager
Gunner Sorensen, Site Project
Superintendent
R. E. Querio, Plant Manager
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
E. E. Fitzpatrick, Station
Superintendent
P. L. Barnes, Regulatory
Assurance Supervisor
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr., Esq.
Diane Chavez, Da.ARE/ SAFE
Steve Lewis, ELD
L. 01shan, NRR LPM
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, ELD
J. Moore, ELD
G. Berry, ELD
J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
- - -
-
-
-