- ML20154M872 + (ML20154M872)
- 05000295/LER-1988-009-01, :on 880422,discovered That Logic Circuit Not Rigorously Tested Since Initial Preoperational Testing,Per Tech Specs.Caused by Failure to Add Relays to Calibr List When Relay Mod Complete.Logic Tested + (ML20154M873)
- RBG-23-309, Forwards Description of Changes ST-05 & ST-10 to Initial Test Program.Justification Provided for Rescheduling Timing Test of Four Slowest Control Rods in CRD Sys & Addition of Note 4 to Figure 14.2-5 + (ML20154M875)
- ML20154M877 + (ML20154M877)
- ML20154M880 + (ML20154M880)
- ML20154M884 + (ML20154M884)
- ML20154M885 + (ML20154M885)
- ML20154M886 + (ML20154M886)
- ML20154M887 + (ML20154M887)
- PNO-IV-88-046, on 880525,steam-driven Main Feedwater Pump Failed.Licensee Preparing to Inspect Main Condenser for Damage.Repairs Should Take Several Days.No One Injured from Flying Debris.Facility Will Remain Shutdown + (ML20154M888)
- 05000277/LER-1998-006-02, :on 980915,automatic RWCU Isolation Occurred While Placing RWCU Sys in Svc.Caused by Unexpected Surge of Water.Procedure Change Was Initiated to Open MO-2-12-74 & RWCU Sys Was Successfully Returned to Svc.With + (ML20154M889)
- ML20154M891 + (ML20154M891)
- ML20154M895 + (ML20154M895)
- ML20154M897 + (ML20154M897)
- ML20154M899 + (ML20154M899)
- ML20154M901 + (ML20154M901)
- ML20154M903 + (ML20154M903)
- ML20154M904 + (ML20154M904)
- L-98-191, Confirms Completion of Requested Actions of GL 96-01 for BVPS Unit 2.Appropriate Testing Was Conducted to Address Deficiencies Identified During Review to Ensure Compliance with Requirements of TSs + (ML20154M905)
- IR 05000083/1988001 + (ML20154M907)
- ML20154M908 + (ML20154M908)
- ML20154M909 + (ML20154M909)
- 05000277/LER-1988-001-06, :on 880428,blown Fuses Rendered One Independent Train of Several Engineering Safety Features Inoperable. Cause Unknown.Fuses Replaced & Physical Insp of Fuses Initiated to Determine Failure Mode + (ML20154M910)
- ML20154M912 + (ML20154M912)
- ML20154M913 + (ML20154M913)
- ML20154M914 + (ML20154M914)
- ML20154M916 + (ML20154M916)
- ML20154M920 + (ML20154M920)
- ML20154M921 + (ML20154M921)
- ML20154M923 + (ML20154M923)
- RBG-24-000, Ro:On 860301,Div III ECCS Initiation & Injection Occurred. Caused When Transformer INJS-X2F Faulted on All Three Phases.Reactor Water Level Stabilized & MSIVs Closed to Limit Reactor Cooldown Rate.Investigation Ongoing + (ML20154M924)
- ML20154M925 + (ML20154M925)
- ML20154M926 + (ML20154M926)
- ML20154M928 + (ML20154M928)
- ML20154M929 + (ML20154M929)
- ML20154M930 + (ML20154M930)
- 05000321/LER-1988-012-01, :on 880826,HPCI Sys Declared Inoperable Due to Malfunctioning Sys Flow Controller.Caused by Loose Fastener on Intermediate Gear in Gearing Mechanism of Controller. Gear Placed in Gear Train + (ML20154M932)
- ML20154M933 + (ML20154M933)
- ML20154M934 + (ML20154M934)
- NL-88-606, Forwards Endorsement 77 to Maelu Policy MF-75 & Endorsement 89 to Nelia Policy NF-212 + (ML20154M935)
- ML20154M937 + (ML20154M937)
- 05000302/LER-1988-012, :on 880428,10CFR50,App R Electrical Isolation Requirements for Trains of RCS Hot Leg Temp Instrumentation in Remote Shutdown Panel & Control Room Compromised.Caused by Design Error.Design Changed on 880527 + (ML20154M938)
- ML20154M943 + (ML20154M943)
- ML20154M944 + (ML20154M944)
- ML20154M947 + (ML20154M947)
- ML20154M948 + (ML20154M948)
- ML20154M950 + (ML20154M950)
- ML20154M951 + (ML20154M951)
- ML20154M952 + (ML20154M952)
- ML20154M953 + (ML20154M953)
- ML20154M954 + (ML20154M954)