Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151F658 + (ML20151F658)
- ML20151F661 + (ML20151F661)
- ML20151F667 + (ML20151F667)
- ML20151F674 + (ML20151F674)
- ML20151F700 + (ML20151F700)
- ML20151F716 + (ML20151F716)
- ML20151F722 + (ML20151F722)
- ML20151F734 + (ML20151F734)
- 05000414/LER-1988-011-01, :on 871229,incoming Breaker to 4,160 Volt Essential Switchgear 2ETB Failed to Trip During ESF Actuation Periodic Testing.Caused by Open Sliding Link in Breaker Control Circuit.Sliding Link Closed + (ML20151F736)
- ML20151F743 + (ML20151F743)
- 05000413/LER-1988-014, :on 880113,electricians Improperly Installed Telephone in Auxiliary Feedwater Pump Turbine Control Panel Room Rendering Firewall Inoperable.Caused by Mgt Deficiency. Penetration Properly Sealed + (ML20151F758)
- ML20151F760 + (ML20151F760)
- ML20151F766 + (ML20151F766)
- 05000346/LER-1988-008, :on 880312,discovered That Nuclear safety- Related (NSR) Equipment Located within Falling Arc Distance of Nonseismic Electrical Panel.Potential for Panels to Fall & Impact NSR Equipment Overlooked + (ML20151F770)
- BSEP-88-0384, Forwards Rev 25 to Emergency Response Plan & Revised Emergency Plan Implementing Procedures,Including Rev 8 to PEP-02.6.12, Operational Support Ctr Leader & Rev 8 to PEP-04.3, Performance of Training,Exercise & Drills + (ML20151F779)
- ML20151F788 + (ML20151F788)
- ML20151F805 + (ML20151F805)
- IR 05000445/1988018 + (ML20151F807)
- ML20151F809 + (ML20151F809)
- ML20151F813 + (ML20151F813)
- ML20151F816 + (ML20151F816)
- ML20151F821 + (ML20151F821)
- ML20151F826 + (ML20151F826)
- ML20151F827 + (ML20151F827)
- ML20151F828 + (ML20151F828)
- ML20151F834 + (ML20151F834)
- 3F0788-11, Forwards Three Relief Requests Re Pump & Valve Requirements in 1983 Edition of ASME Code,Section Xi.Relief Request V-115 Which Has Been Corrected Also Encl.Fee Paid + (ML20151F835)
- IR 05000254/1988004 + (ML20151F836)
- ML20151F838 + (ML20151F838)
- 05000298/LER-1988-004, :on 880305,actuation of ESF Group Isolations Occurred Subsequent to Planned Manual Scram.Caused by Plant Design.Reactor Vessel Water Level Immediately Recovered & Plant Sys Restored to Normal Condition + (ML20151F841)
- ML20151F842 + (ML20151F842)
- 05000245/LER-1988-004-02, :on 880318,discovered Potential for ECCS Pump Suction Strainers to Foul W/Fibrous Insulation Debris.Caused by Insufficient Area of Existing Strainers.Strainers Replaced + (ML20151F844)
- ML20151F853 + (ML20151F853)
- ML20151F859 + (ML20151F859)
- ML20151F861 + (ML20151F861)
- ML20151F863 + (ML20151F863)
- ML20151F864 + (ML20151F864)
- ML20151F866 + (ML20151F866)
- ML20151F872 + (ML20151F872)
- ML20151F873 + (ML20151F873)
- ML20151F876 + (ML20151F876)
- ML20151F878 + (ML20151F878)
- ML20151F880 + (ML20151F880)
- IA-88-350, Informs of Gao Audit Team 880607 Visit to NMSS for Audit of Matl Program.Gao Team Will Return in 2 Wks to Discuss Draft Rept on Subj Audit.Lists Topics Discussed W/Auditors + (ML20151F882)
- ML20151F882 + (ML20151F882)
- ML20151F885 + (ML20151F885)
- ML20151F886 + (ML20151F886)
- ML20151F888 + (ML20151F888)
- B12878, Withdraws 880301 Request for Changes to Tech Spec 6.2.3.4 Re Plant Records.Tech Spec 6.2.3, Independent Safety Engineering Group (Iseg), Encl + (ML20151F889)
- ML20151F890 + (ML20151F890)
- IA-88-360, Final Response to FOIA Request for Documents.App a Documents Available in PDR + (ML20151F894)