ML20151F834
Jump to navigation
Jump to search
| ML20151F834 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 07/31/1988 |
| From: | CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20150E068 | List: |
| References | |
| NUDOCS 8807270281 | |
| Download: ML20151F834 (1) | |
Text
.
4 I
DOCKET NO.:
050-0325 UNIT:
Brunswick 1 DATE: July 1988 COMPIITED BY: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT 1 Brunswick Unit I had a 93.07% capacity f actor and a 100% availability f actor
)
for the month of June 1988. There were eight power reductions.
There are 1016 BWR and 160 PVR spent fuel bundles in the Brunswick Unit I fuel pool.
NOTE:
In May, Unit 1 shutdown event number 88038 included ramp losses to shutdown.
Attached is a corrected shutdown and power reduction form.
8807270201$$0 24 PDR ADOCK PDR R
.