, j. , t

{ ,

/ 'o g UNITED STATES

. [ g NUCLEAR REGULATORY COMMISSION r, a WASHINGTON, D C. 20555

  • s.,...../

April 15, 1988 Docket No. 99900735/88-01 fir. Thomas A. Goin, Vice President Quality Assurance Southern Bolt & Fastener Corporation Post Office Box 7196 Shreveport, Louisiana 71137-7196

Dear Mr. Goin:

This letter addresses the inspection of your facility in Shreveport, Louisiana r.onducted by Ms. C. Abbate and Mr. C. Czajkowski of this office on March 7-11, 1988, and the discussions of their findings with you and other members of your staff at the conclusion of the inspection.

The purpose of the inspection was to review Southern Bolt & Fastener's (SBF)

Quality Assurance (QA) program and its implementation. Areas examined during the NRC inspection ar.d our findings are discussed in the enclosed report. This inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspectors.

During this inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. Those items identified include four instances of inadequate control of nonconfoming material, two instances of improper upgrading of stock material to ASME Boiler and Pressure Vessel (BPV)

Code, Section Ill material per NCA-3867.4(e), and two instances of unevaluated vendors supplying material for ASME BPV Code Section 111 work. We feel that the lack of control over nonconfoming material and the improper upgrading of material indicates a quality assurance breakdown in these two areas. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

Please provide us within 30 days from the date of this letter a written statement containing:

(1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed. We will consider extending the response time if you can show good cause for us to do so.

} b i'i ,

G804190024 880415 PDR OA999 CMVSOUDF 99900735 DCD i l /

, Mr. Thomas A. Goin April 15, 1988 L

The responses requested by this letter are not subject to the clearance procedures of the Office of Management and Budget as required by the Papenvork Reduction Act of 1980, PL 96-S11.

In accordance with 10 CFR 2.790 of the Coi:nission's regulations, a copy of this letter and the enclosed inspaction report will be placed in the NRC's Public Document Room.

Should you have any questions concerning 1his inspection, we will be pleased to discuss ti.em with you.

Sincerely,

> & An-James C. Stone, Acting Chief Vendor Inspection Branch Division of Reactor Inspection ar.d Safeguards Office of Nuclear Reacter Regulation

Enclosures:

1. Appendix A-Notice of Nonconfonnance
2. Appendix B-Inspection Report No. 99900735/88-01

Mr. Thorras A. Goin April 15, 1988 The responses requested by this letter are not subject to the clearance procedures of the Office of Nanagement and Budget as required by the Paperwork Reduction Act of 1980. PL 96-511.

In accordance with 10 CFR 2.790 of the Connission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/5/

James C. Stone, Acting Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation

Enclosures:

1. Appentiix A-Notice of Nonconformance
2. Appendix B-Inspection Report No. 99900735/88-01 i

l DISTRIBUTION:

l Mbs Code IE:09 gg '

l- VIB Reading l DRIS Reading i JPartlow BGrimes i JStonc

! EBaker CAbbate(2)

LParker CCzajkowski,BNL ZLan MGreen, ASME 2'D VIB:DRlkM ASC[VIB:DRIS V AC/VIB:DRIS f

CAbbate:tt EJaker JStone '

4 /l)/88 7 / ///88 /g/88 l

l

i

. Mr. Thomas A. Goin April 15, 1988 The responses requested by this letter are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/5/

James C. Stone, Acting Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation

Enclosures:

1. Appendix A-Notice of Nonconformance
2. Appendix B-Inspection Report No. 99900735/88-01 DISTRIBUTION:

RICS Code IE:09 VIB Reading DRIS Reading JPartlow BGrimes JStone EBaker

CAbbate (2)

LParker CCzajkowski,Bhl ZLan MCreen, ASME VIB:DR h kA DRIS C/VlB:DRIS CAbbate:tt EJaker JStone i /l)/88 7/ ///88 g/g/83

(

!