Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- W3P88-1244, Responds to Violations Noted in Insp Rept 50-382/88-17. Corrective Actions:Test Procedure NE-02-060 Will Be Revised to Clarify Inconsistencies Between Steps 6.2 & 6.3 + (ML20151E942)
- ML20151E945 + (ML20151E945)
- 05000289/LER-1988-002-02, :on 880619,pressurizer Level & Cooldown Rate Exceeded Due to Inadequate Test Procedure.Caused by Procedural Inadequacies.Test Procedure Will Be Revised to Prevent Recurrence of Event + (ML20151E948)
- ML20151E949 + (ML20151E949)
- ML20151E952 + (ML20151E952)
- ML20151E953 + (ML20151E953)
- ML20151E954 + (ML20151E954)
- ML20151E956 + (ML20151E956)
- ML20151E959 + (ML20151E959)
- ML20151E960 + (ML20151E960)
- ML20151E961 + (ML20151E961)
- ML20151E970 + (ML20151E970)
- ML20151E971 + (ML20151E971)
- ML20151E972 + (ML20151E972)
- ML20151E977 + (ML20151E977)
- IR 05000282/1988010 + (ML20151E980)
- ML20151E983 + (ML20151E983)
- NLS8800373, Responds to NRC Re Violations Noted in Insp Rept 50-298/88-14.Corrective actions:as-built Interim Drawing for Standby Liquid Control Sys Identified as Unreadable by NRC Replaced W/Fully Legible Drawing + (ML20151E988)
- ML20151E989 + (ML20151E989)
- ML20151E998 + (ML20151E998)
- ML20151F000 + (ML20151F000)
- ML20151F003 + (ML20151F003)
- ML20151F005 + (ML20151F005)
- ML20151F008 + (ML20151F008)
- ML20151F009 + (ML20151F009)
- ML20151F012 + (ML20151F012)
- 3F0788-13, Forwards Rev 4 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR73.21) + (ML20151F013)
- ML20151F016 + (ML20151F016)
- ST-HL-AE-2725, Monthly Operating Rept for June 1988 for South Texas Project Unit 1 + (ML20151F018)
- ML20151F020 + (ML20151F020)
- ML20151F023 + (ML20151F023)
- ML20151F027 + (ML20151F027)
- ML20151F029 + (ML20151F029)
- ML20151F033 + (ML20151F033)
- ML20151F034 + (ML20151F034)
- CEO-88-112, Forwards Preliminary Test Outline Re Emergency Feedwater Initiation & Control Sys Testing Scheduled for 80% Power Trip.Test Procedure Will Be Written & Forwarded by 880728 + (ML20151F036)
- ML20151F038 + (ML20151F038)
- ML20151F041 + (ML20151F041)
- ML20151F043 + (ML20151F043)
- ML20151F045 + (ML20151F045)
- ML20151F047 + (ML20151F047)
- CEO-88-102, Expresses Appreciation for Meeting W/Nrc Re Facility Restart Program.Program Has Provided Safe & Effective Startup, Allowing Personnel to Gain Confidence in Operating Plant at Power.Util Will Add Addl Power Plateaus to Restart Schedule + (ML20151F054)
- ML20151F060 + (ML20151F060)
- ML20151F064 + (ML20151F064)
- ML20151F067 + (ML20151F067)
- ML20151F069 + (ML20151F069)
- ML20151F076 + (ML20151F076)
- ML20151F078 + (ML20151F078)
- ML20151F081 + (ML20151F081)
- ML20151F083 + (ML20151F083)
- ML20151F090 + (ML20151F090)