Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000213/LER-1994-010, :on 940420,nonconservative Assumption Was Used in Reactor Coolant System Boron Dilution Analysis.Caused by Failure to Verify Detector Response to Inadvertent Event. Corrective Action:Revised Alarm Setpoint + (ML20149D879)
- 3F0797-01, Monthly Operating Rept for June 1997 for Crystal River Unit 3 + (ML20149D880)
- ML20149D881 + (ML20149D881)
- 05000354/LER-1994-004-02, :on 940419,inboard MSIV Closure Occurred. Caused by Procedural Deficiency.Corrective Action:I&C Procedures Will Be Revised & Steps Will Be Added to Ensure Proper Valve Lineup & Switch Positions + (ML20149D882)
- 05000298/LER-1997-008, :on 970614,TS 3.7.A.5.d Time Limit Was Exceeded.Caused by Procedural Inadequacy.Revised Operating Procedures 2.2.60 + (ML20149D884)
- ML20149D885 + (ML20149D885)
- ML20149D886 + (ML20149D886)
- 05000213/LER-1994-011, :on 940423,unplanned Loss of Spent Fuel Cooling Occurred.Caused by Failed Seal on Spent Fuel Cooling Pump B. Corrective Actions:Pump Rebuilt + (ML20149D887)
- ML20149D888 + (ML20149D888)
- ML20149D889 + (ML20149D889)
- ST-HL-AE-2497, Forwards Proposed,Annotated Revs to FSAR Section 17.2, QA During Operations Phase. Changes Do Not Reduce Effectiveness of QA Program Previously Described in Fsar. Revised Pages Will Be Incorporated in Future FSAR Amend + (ML20149D890)
- ML20149D891 + (ML20149D891)
- ML20149D893 + (ML20149D893)
- ML20149D897 + (ML20149D897)
- ML20149D898 + (ML20149D898)
- ML20149D899 + (ML20149D899)
- ML20149D900 + (ML20149D900)
- IR 05000298/1987023 + (ML20149D901)
- ML20149D902 + (ML20149D902)
- 05000354/LER-1988-001-01, :on 880106 & 28,liguid & Gaseous Radwaste Discharge Monitors Failed to Pass Functional Tests.Caused by Design & Procedure Deficiencies.Gaseous Radwaste Monitor Surveillance Procedures Revised + (ML20149D903)
- ML20149D905 + (ML20149D905)
- IR 05000353/1997001 + (ML20149D906)
- 05000302/LER-1997-014, :on 970611,discovered That Reactor Bldg Penetrations Were Outside Design Bases.Caused by Engineering Design Errors.Will Review Other Reactor Bldg Penetrations & Will Implement Modifications to Penetrations + (ML20149D909)
- ML20149D911 + (ML20149D911)
- ML20149D914 + (ML20149D914)
- ML20149D916 + (ML20149D916)
- ML20149D917 + (ML20149D917)
- ML20149D919 + (ML20149D919)
- ML20149D920 + (ML20149D920)
- ML20149D921 + (ML20149D921)
- ML20149D924 + (ML20149D924)
- ML20149D926 + (ML20149D926)
- ML20149D928 + (ML20149D928)
- ML20149D929 + (ML20149D929)
- ML20149D931 + (ML20149D931)
- ML20149D932 + (ML20149D932)
- ML20149D933 + (ML20149D933)
- ML20149D935 + (ML20149D935)
- ML20149D938 + (ML20149D938)
- ML20149D939 + (ML20149D939)
- ML20149D942 + (ML20149D942)
- ML20149D944 + (ML20149D944)
- ML20149D946 + (ML20149D946)
- ML20149D948 + (ML20149D948)
- ML20149D950 + (ML20149D950)
- 05000354/LER-1997-012, :on 970613,engineered Safety Feature Actuation: Single Rod Scram Occurred.Caused by Failed Open a RPS Fuse Located in HCU Which Supplies RPS Power to a Side Scram Solenoid for Control Rod 26-27.Fuse Replaced + (ML20149D952)
- ML20149D955 + (ML20149D955)
- PNO-IV-88-007A, on 880128,Region IV Notified of Po-210 Contamination at Kti Chemicals,Inc from Use of 3M Co Model 908 Static Eliminator Devices.Devices Returned to Vendor. Eight People Will Receive Bioassay Analysis + (ML20149D960)
- ML20149D962 + (ML20149D962)
- ML20149D968 + (ML20149D968)
- ML20149D969 + (ML20149D969)