ML20149D911
| ML20149D911 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/05/1988 |
| From: | Beck J, Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| TXX-88204, NUDOCS 8802100092 | |
| Download: ML20149D911 (2) | |
Text
-_
t O-o M
- " " E Lo
~
T C
Fi e # 10110
=
=
Ref. # 10CFR50.55(e)
NELECTRIC February 5,1988 w im. c. co.ai lieriano lar frasaJret U. 5. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555 i
SUBJECT:
C0HANCHEPEAKSTEAMELECTRICSTATION(CPSES)
DOCKET N05. 50-445 AND 50-446 10CFR50.55(e) POTENTIALLY REPORTABLE ITEMS DEEMED NOT REPORTABLE Gentlemen:
Attached please find a list of deficiencies previously reported as potentially I
reportable under the provisions of 10CFR50.55(e). We have completed our evaluation and concluded in the event these issues had remained uncorrected, no condition adverse to the safety of plant operations would exist.
Documentation to support our conclusions is available at the CPSES site for your Inspector's review.
very truly yours, l
W. G. Counsil By t 0&-
Jdn W. Beck Vice President, Nuclear Engineering JCil/grr Attachment c - Mr. R. D. Martin, Region lY Resident inspectors, CPSES (3) 2%h G
tonwh cuaw surare tan tww. raw n.m J
Attachment to TXX-88204 February 5, 1988 Page 1 of 1 10CFR50.55(e) ISSUES DEEMED NOT REPORTABLE SDAR Title Last Interim Report CP-86-08 Installation of Super Hilti Kwik Bolts TXX-7072 12-09-87 CP-86-12 Commodity Installations at Secondary Wall TXX-7112 12-18-87 Design Gaps CP-87-83 Seismic Analysis of Service Water TXX-7008 11-30-87 Discharge Structure CP-87-125 Service Water Piping Supports TXX-08002 01-04-88 i
e i
i
,