- 05000263/LER-1992-010, :on 920725,discovered That Four Valves Used to Mitigate Consequences of HELB Not Included in ASME Section XI Testing Program.Caused by Failure to Include Emergency Svc Water Valves in Aop.Aops Revised + (ML20141M444)
- 05000277/LER-1992-013-01, :on 920727,RWCU Sys Isolation Occurred & Recirculating Water Pump 2A Tripped.Caused by Failure to Follow Established RWCU Sys Operating Procedures.Bottom Head Drain Piping Will Be Cleaned During Outage + (ML20141M447)
- ML20141M448 + (ML20141M448)
- ML20141M450 + (ML20141M450)
- ML20141M451 + (ML20141M451)
- 05000285/LER-1992-026, :on 920723,discovered That in-core Neutron Flux Monitoring Sys Alarm Limit Set Nonconservatively.Caused by Contractor Failing to Detect Error & Inadequate Verification Procedure.Recalculated Alarm Limits Installed + (ML20141M453)
- ML20141M454 + (ML20141M454)
- ML20141M456 + (ML20141M456)
- A10521, Responds to NRC Re Violations Noted in Insp Rept 50-336/92-14 on 920503-0613.Corrective Actions:Change to Operations Dept Instruction on Sys Draining Will Be Initiated + (ML20141M457)
- 0CAN089209, Responds to NRC Re Weaknesses Noted in Radiological Emergency Preparedness Exercise Insp Repts 50-313/92-19 & 50-368/92-19.Corrective Actions:Eof Procedure Will Be Revised to Provide Guidelines for Offsite Briefings + (ML20141M458)
- JAFP-92-0612, Ja Fitzpatrick Nuclear Power Plant Effluent & Waste Disposal Semi-Annual Rept,For Jan-June 1992, Including as Addendum to Jan-June 1992 Rept,Tables 3A & 3B of Jul-Dec 1991 Rept + (ML20141M459)
- ML20141M461 + (ML20141M461)
- 05000416/LER-1992-009, :on 920509,determined That Fuel Assemblies Exhibited Greater than Expected Closure of Compression Springs.Cause Unknown & Investigation by Siemens Nuclear Power Corp Underway + (ML20141M462)
- L-92-234, Forwards Rev 35 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3)) + (ML20141M468)
- ML20141M469 + (ML20141M469)
- ML20141M473 + (ML20141M473)
- ML20141M474 + (ML20141M474)
- ML20141M476 + (ML20141M476)
- ML20141M482 + (ML20141M482)
- ML20141M484 + (ML20141M484)
- ML20141M485 + (ML20141M485)
- L-92-229, Forwards Rev 14 to Training & Qualification Plan, Per 10CFR50.54(p) + (ML20141M488)
- ML20141M489 + (ML20141M489)
- ML20141M490 + (ML20141M490)
- ML20141M492 + (ML20141M492)
- ML20141M494 + (ML20141M494)
- NRC-92-0083, Forwards Semiannual fitness-for-duty Rept for Jan-June 1992. One Rept,Per 10CFR26.73 Made During Reporting Period + (ML20141M495)
- ML20141M496 + (ML20141M496)
- ML20141M498 + (ML20141M498)
- ML20141M499 + (ML20141M499)
- ML20141M500 + (ML20141M500)
- ML20141M502 + (ML20141M502)
- ML20141M503 + (ML20141M503)
- IA-91-503, Package Consisting of Purchase Orders DR-91-0178 for Afga Compugraphic Div,DR-91-0355 for Interleaf,Inc,DR-91-1287 for Sun Microsystems & DR-92-0134 for Hewlett Packard + (ML20141M503)
- 3F0892-06, Suppls 890711 & 1101 Responses to NRC Bulletin 88-004 Re Potential safety-related Pump Loss Covering DHR Pump Mission Time.Results of Simulator Evaluation Concluded That Adequate Assurance Exists That Decay Heat Pumps Can Perform Function + (ML20141M505)
- 05000370/LER-1991-010, :on 910925,reactor Trip Manually Initiated Upon Receipt of Alarm Panel 2AD-4,annunicator C-4.Caused by Damaged Insulation on Trip Solenoid Coil.Maint Procedure Reviewed to Ensure Precautions Incorporated + (ML20141M506)
- ML20141M507 + (ML20141M507)
- 05000425/LER-1992-011-02, :on 920726,control Room Personnel Observed Trouble Alarm Annunicate for Containment Area Radiation Monitor Via Containment Ventilatiom Isolation Signal.Caused by Failed Circuit Board.Board Replaced + (ML20141M508)
- ML20141M510 + (ML20141M510)
- ML20141M512 + (ML20141M512)
- ML20141M514 + (ML20141M514)
- ML20141M515 + (ML20141M515)
- 05000328/LER-1992-007-01, :on 920508,discovered That CS Pump Suction Valves Closed,Rendering Both Trains of CS Inoperable.Caused by Inadequate Configuration Control.Operators Shift Turnover Periodic Instructions Revised + (ML20141M519)
- 05000369/LER-1992-008-03, :on 920726,reactor Trip/Turbine Trip Experience as Result of Defective Procedure Due to Technical Deficiency.Changes to Valve 1RC-43 Will Be Evaluated.W/ Undated Ltr + (ML20141M521)
- 05000454/LER-1992-006-07, :on 920728,discovered That Pump Discharge Check Valves in Component Cooling & RHR Sys Not Being Tested,As Required by GL 89-04.Caused by Personnel Error.Affected Valves Backflow Tested W/No Problems Noted + (ML20141M522)
- 05000282/LER-1992-009-01, :on 920727,inadequate Testing of 4 Kv Safeguards Bus Automatic Source Breaker Trip Feature Identified.Caused by Personnel Error.Verbal Temporary Waiver of Compliance to TS SR 4.6.A.3.b.1 Obtained + (ML20141M523)
- ML20141M525 + (ML20141M525)
- ML20141M526 + (ML20141M526)
- ML20141M527 + (ML20141M527)
- ML20141M528 + (ML20141M528)
- ML20141M530 + (ML20141M530)