Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20141G575 + (ML20141G575)
- PNO-III-97-058, on 970708,two Packages Exceeding DOT & NRC Radiation Limits Received by Mallinckrodt Nuclear Pharmacies at Two Different Locations.Readings Taken by Licensee Upon Receipt of Packages + (ML20141G576)
- ML20141G577 + (ML20141G577)
- ML20141G579 + (ML20141G579)
- ML20141G580 + (ML20141G580)
- 05000414/LER-1997-004-03, :on 970424,inadequate Test of Containment Isolation Valve Identified.Caused by Inadequate Work Practices.Personnel Involved Counseled Re Improved Performance + (ML20141G581)
- ML20141G582 + (ML20141G582)
- ML20141G583 + (ML20141G583)
- ML20141G584 + (ML20141G584)
- IR 05000458/1997007 + (ML20141G586)
- ML20141G587 + (ML20141G587)
- 05000482/LER-1997-012, :on 970605,section 6.2.2 TS Violation Re Shift Compliment Was Noted.Caused by Lack of Administrative Controls to Ensure SCBA Corrective Lenses Were Available for Licensed Operators.Purchased Corrective Lenses + (ML20141G588)
- ML20141G589 + (ML20141G589)
- ML20141G590 + (ML20141G590)
- ML20141G591 + (ML20141G591)
- ML20141G592 + (ML20141G592)
- ML20141G593 + (ML20141G593)
- ML20141G595 + (ML20141G595)
- LIC-97-0103, Responds to NRC Re Violations Noted in Insp Rept 50-285/97-11 on 970519-23.Corrective Actions:Revised Procedure OP-2A to Address Procedural Deficiency & Informed Plant Personnel of Event on 970611 + (ML20141G596)
- 05000370/LER-1986-003-03, :on 860313,excessive RCS Leakage Discovered When Water Found Spraying from Valve 2NV-801.Valve 2NV-322 Also Found Leaking.Caused by Failed Valves 2NV-322,2NV-801, 2WL-1B & 2WL-2A + (ML20141G597)
- ML20141G598 + (ML20141G598)
- 05000278/LER-1997-003-01, :on 970404,TS Noncompliance Due to Loss of 3C RFP High Water Level Trip,Occurred.Caused by Failure to Correlate Turbine/Reset Light Problem to Inoperability. Operating Shift Procedures Revised + (ML20141G600)
- ML20141G601 + (ML20141G601)
- ML20141G606 + (ML20141G606)
- 05000341/LER-1997-012, :on 970603,voluntary Rept Re Surveillance Testing of Recirculation Sys Overspeed Stops Was Performed. Caused by Conflict Re TS SR 4.4.1.1.2.MG Set Mechanical & Electric Stops Adjusted Downward within 4.4.1.1.2 Limits + (ML20141G608)
- ML20141G610 + (ML20141G610)
- ML20141G611 + (ML20141G611)
- ML20141G612 + (ML20141G612)
- ML20141G613 + (ML20141G613)
- ML20141G614 + (ML20141G614)
- ML20141G616 + (ML20141G616)
- ML20141G617 + (ML20141G617)
- ML20141G619 + (ML20141G619)
- ML20141G620 + (ML20141G620)
- IR 05000305/1985018 + (ML20141G622)
- ML20141G623 + (ML20141G623)
- ML20141G624 + (ML20141G624)
- ML20141G625 + (ML20141G625)
- ML20141G628 + (ML20141G628)
- ML20141G630 + (ML20141G630)
- 05000369/LER-1985-034-01, :on 851102,reactor/turbine Trip on Steam Generator 1A lo-lo Level Occurred.Caused by Loss of Instrument Air Due to Rupture of Welded Seam on Flexible Pipe on Discharge Air Compressor B + (ML20141G631)
- ML20141G634 + (ML20141G634)
- ML20141G635 + (ML20141G635)
- ML20141G636 + (ML20141G636)
- ML20141G639 + (ML20141G639)
- RC-97-0131, Forwards Response to Violations Noted in Insp Rept 50-395/97-03.Corrective Actions:Slow Decrease in Reactor Bldg Pressure Was Observed by CR Operator Approx 25 Minutes After Alignment Error + (ML20141G640)
- ML20141G641 + (ML20141G641)
- ML20141G643 + (ML20141G643)
- ML20141G644 + (ML20141G644)
- ML20141G647 + (ML20141G647)
- ML20141G648 + (ML20141G648)