Summary of 860331 Meeting W/Util & BNL in Bethesda,Md Re 10CFR50,App R Issues.List of Attendees Encl
ML20141G610
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 04/16/1986
From: Rotella T
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8604230461
Download: ML20141G610 (4)


Text

_ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ - _

  1. ~%, UNITED STATES 8 c NUCLEAR REGULATORY COMMISSION r, <j W ASHWGTON, D. C. 20555

...../ April 16,1986 Docket No. 50-155 LICENSEE: Consumers Power Company (CPC)

FACILITY: Bio Rock Point Plant St& LECT: SilMMARY OF MEETING HELD ON MARCH 31, 1986 The NRC held a meetino with CPC representatives in Bethesda, Maryland on March 31, 1986. The purpose of the meetina was to discuss 10 CFR Part 50, Appendix R issues for the Rio Rock Point Plant (the facilitv). A list of attendees has been provided as Enclosure 1.

The meetino at NRC headouarters was promoted as a result of concerns expressed by inspectors from tha NDC Decion III nffice and representatives in NRR with regard to compliance to 10 CFR Part 50, Appendix R. Durinn December 1985, NRC Region III inspectors conducted an Appendix R audit at the facilitv. The results of the inspection have not vet baen docketed, however, several issues were identified as open items durinq the exit meeting with CPC. A second visit to the facility was made in March 1086, by Reaion 111 to obtain clarification for certain Annandix R issuas includina availability of analyses for fires in the control room, containment, and screen house. Other fire protection issues were also discussed. Details of '

both audits will be documented in the Recion III Inspection Deport.

Durino a conference call between NRR, Reaion 111, CPC, and representatives of Prookhaven National Laboratories, it became apparent that the most efficient way to resolve the remainina open Appendix R issues was to meet. Therefore, at the request of NRR, representatives from Regio 1 III, CPC, and Brookhaven National Laboratories came to Rethesda to exchange as much information as was necessary to resolve the remaining facility Appendix R open issues.

As NRR understands CPC, there appears to be a lack of an easily presentable anal.ysis for certain Appendix R issues. This is a potential findin9, the sionificance of which, if any, will be documented in the Renion 111 Inspection Report.

Other discussions centered on an exemption which CPC reauested by submittal dated Seotember ?8, 198? which was granted by the NRC on March 8, 1983.

Specifically, the technical basis for aranting oart of the March 8, 1983 exemption is at issue and the validity of which is now in cuastion. NRR has found the exemption misleading in the area of separation for equipment required for safe shutdown in the control room in the event of a worse case spurious actuation and damane to equipment / systems reauired for safe shutdown in the event of a fire.

NRR will forward to CPC a letter of interpretation of the exemption issued on March 8, 1983 for the facility.

8604230461 860416

{DR ADOCK 05000155 PDR

2_

As a result of concerns expressed by both CPC and the NRC with respect to the information presented above, includino the March 8,1983 exemption for III.G of Appendix R, CPC has agreed to the followino action:

CPC will submit a letter to the NRC within 14 days from the date of this meetino which will provide the following:

1. Identification of all areas of the facility where the rule (Appendix R) is not met or an exemption has not been oranted,
2. A description of the compensatory measures taken for all of the areas identified in (1) above, and
3. A date for submittal of a total package or " Fire Plan" which would include an updated Fire Hazards Analysis incorporating all of the appropriate information related to safe shutdown and a list of exemptions granted for the facility. CPC should use the format identified in Section 2R of Annendix R to 10 CFP Part 50 when preparino the " Fire Plan".

l During the meeting CPC committed to provide the " Fire Plan" to the NRC hv restart from the facility 1985 refuelina outage. NRP has reserved final i comment on this proposed date until CPC's letter of compensatory measures l has been received.

If there are anv cuestions or comments with renard to the information presented above, please direct then to me.

Original signed by Thomas S. Rotella, Pro.icct Manacer RWR Pro,iect Directorate di Division of RWR Licensinq j cc: See next page

Enclosure:

DISTPIRtlTI0ft As stated Docket l Ciamt son NRC POR OELD Local PDR EJordan PD*1 PDG BGrimes J7wolinski ACRS (10)

TRotella NRC Participants

.1Stano Service list DRL:PD#1 DRL: PDd CJamerson DRL:PD#1 TPotella:.iq , [DAL:

( APD81 Stano i7wolinski l

}/if/86 +/ 4/86 () f /6/86 Il /i9 /86 l

r Consumers Power Company Big Rock Point Plant cc:

Mr. Thomas A. McNish, Secretary Consumers Power Company 212 West Michican Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Dower Company 212 West Michican Avenue 1 Jackson, Michigan 49201 Big Rock Point Plant l ATTN: Mr. David P. Hoffman Plant Superintendent Route 3 Post Office Box 591 Charlevoix, Michigan 497?0 ]

Mr. I. Lee Moerland

, Chairman, Board of Commissioners P. O. Box 218 Charlevoix, Michigan 49720 i

Office of the Governor Room 1 - Capitol Building Lansing, Michigan 48913 i Regional Administrator Nuclear Regulatory Commission, Reoion 111 799 Roosevelt Road Glen Ellyn, Illinois 60137 Nuclear Facilities and Environmental l

Monitoring Section Office l Division of Radiological Health P. O. Box 30035 Lansing, Michioan 48909 Resident Inspector Big Rock Point Plant c/o U.S. NRC RR #3, Rox 600 Charlevoix, Michigan 49720 Kenneth W. Berry Director, Nuclear Licensing Consumers Power Company 1945 W. Parnall Road

, Jackson, Michigan 49201 1 _

J ENCLOSURE 1 LIST OF ATTENDESS FOR MEETING ON PARCH 31, 1986 CPC AT NRC FOR APPENDIX "R" Name Affiliation Thomas S. Rotella USNRC - Proiect Manacer Anthonv N. Fresco Brookhaven National Lab Jeff Holmes ifSNRC - Region III Harvey Thomas Brookhaven National Lab John A. Zwolinski USNRC - Director Rod M. Krich Consumers Power Company William J. Trubilowicz Consumers Dower Company P. W. Smediev Consumers Power Company Joseoh M. Ulfe USNRC - Peoion !!!

Renee M. Perfetti ilSNRC Jack Kudrick USNRC Dennis Kubicki USNPC i