Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000334/1985027 + (ML20140D000)
- ML20140D001 + (ML20140D001)
- 05000254/LER-1997-005, Forwards LER 97-005-00 IAW Requirements of 10CFR50.73(a)(2)(v)(D) W/Listed Commitments + (ML20140D002)
- ML20140D004 + (ML20140D004)
- ML20140D005 + (ML20140D005)
- ML20140D006 + (ML20140D006)
- ML20140D007 + (ML20140D007)
- ML20140D008 + (ML20140D008)
- 05000254/LER-1997-005-03, :on 970319,HPCI Subsystem Was Made Inoperable to Protect Equipment Due to Uncertainties Re Abandoned Power Feed Cable,Which Had Been Inappropriately Abandoned. Plant Design Documents Have Been Updated + (ML20140D010)
- 05000316/LER-1985-043-01, :on 851227,auxiliary Bldg Ventilation Grab Sample Not Obtained within Time Restraints in Tech Spec 3.3.3.10,Table 3.3-13 Action Item 28.Caused by Personnel Error.Administrative Action Taken + (ML20140D011)
- ML20140D015 + (ML20140D015)
- ML20140D016 + (ML20140D016)
- 05000323/LER-1985-024-01, :on 851225,automatic Reactor & Turbine Trips Occurred During Full Load Rejection Test.Caused by Slow Response of Steam Dump Control Sys.Sys Modified to Improve Steam Dump Valve Response Time + (ML20140D021)
- ML20140D024 + (ML20140D024)
- 05000455/LER-1997-001-08, :on 970315,Unit 2 Containment Drain Sys Was Clogged Due to Debris.Water Hose Used to clean-out Connection to Blast Blockage Clear & Floor Drain Oil Separator & Weir Box Was Checked & Cleaned + (ML20140D027)
- ML20140D028 + (ML20140D028)
- 05000374/LER-1985-048-02, :on 851224,RCIC Water Leg Pump Tripped on Breaker Thermal Overload & Could Not Be Restarted.Work Requests Initiated to Replace Water Leg Pump & Identify Cause of Failure.Supplemental Rept Expected + (ML20140D029)
- 05000277/LER-1996-009, :on 961001,declared High Pressure Coolant Injection (HPCI) Sys Inoperable Due to Bearing Misalignment. Realigned Bearing Housing,Performed ST-O-023-200-2 Satisfactorily & Declared HPCI Sys Operable + (ML20140D030)
- ML20140D032 + (ML20140D032)
- 05000265/LER-1997-004, Forwards LER 97-004-00,IAW 10CFR50.73(a)(2)(ii)(B).Unit 1 DWEDS & DWFDS Will Be Examined to Verify Video Tape Determination During Next Refueling Shutdown to Ensure Covers on Unit Installed Per Applicable Design Drawings + (ML20140D033)
- 05000369/LER-1985-038-01, :on 851222,reactor Tripped Due to Turbine Trip from 93% Power.Caused by Ground Fault within Motor Operated Disconnect (MOD) on Main Power Busline 1B.Unit Stabilized & MOD Repaired + (ML20140D034)
- LR-N970247, Special Rept 97-01:on 970317,test Failure of 1D-G-400, D Edg.Caused by Failed Emergency Start Preset Relay. Relay Was Immediately Replaced & Retest of D EDG Was Satisfactory + (ML20140D035)
- ML20140D037 + (ML20140D037)
- ML20140D038 + (ML20140D038)
- NPL-97-0177, Forwards Rept 97318-2, Suppl to Evaluation of EQ Impact of Wepc TS Change Request 192, Which Is Needed to Address Four Items + (ML20140D039)
- ML20140D040 + (ML20140D040)
- NSD-NRC-97-5163, Forwards Proprietary & non-proprietary Responses to NRC RAI 440.584,rev 1 on Osu Test SB05 & Affidavit.Proprietary Info Withheld,Per 10CFR2.790 + (ML20140D041)
- ML20140D042 + (ML20140D042)
- ML20140D043 + (ML20140D043)
- 05000416/LER-1997-001-02, :on 970312, a Subsystem Was Declared Inoperable.Caused by Inappropriate Action. a Subsystem Was Retested W/No Malfuntions Identified + (ML20140D044)
- ML20140D046 + (ML20140D046)
- ML20140D048 + (ML20140D048)
- TXX-4672, Interim Deficiency Rept CP-85-31 Re Possible Impact of Addl Weight on Electrical Raceway Support Sys.Initially Reported on 850827.Analysis Required to Resolve Issue Scheduled for Completion by 860615.Final Rept Will Be Submitted by 860707 + (ML20140D049)
- ML20140D050 + (ML20140D050)
- ML20140D052 + (ML20140D052)
- TXX-4671, Interim Deficiency Rept CP-85-26 Re Steam Generator Upper Lateral Restraint Embedment Design.Initially Reported on 850719.Concern Being Evaluated & Scheduled for Resolution by 860502.Final Rept Will Be Submitted by 860523 + (ML20140D053)
- ST-HL-AE-1585, Forwards Response to Draft SER Item 10 Re Reactor Coolant Pump Protective Relaying.Capability of Pump Protective Relaying to Perform Function in Turbine Generator Bldg for Expected Temp Extremes Reconfirmed + (ML20140D055)
- ML20140D056 + (ML20140D056)
- TXX-4674, Interim Deficiency Rept CP-85-36 Re Installation of nonsafety-related Conduit on nonsafety-related Dead Weight Supports Not in Compliance W/Reg Guide 1.29.Initially Reported on 850906.Final Rept Submitted by 860703 + (ML20140D058)
- ML20140D059 + (ML20140D059)
- ML20140D060 + (ML20140D060)
- ML20140D061 + (ML20140D061)
- TXX-4675, Interim Deficiency Rept CP-85-42 Re Possible Adverse Effects of Substituting pre-formed Sections of Thermolag on Conduit & Conduit Support Installations.Initially Reported on 850920.Final Rept Will Be Submitted by 860516 + (ML20140D062)
- NSD-NRC-97-5062, Forwards Rev 0 to WCAP-14837, AP600 Shutdown Evaluation Rept, Which Provides Evaluation Consistent W/Outline Defined in for Inclusion in SSAR + (ML20140D063)
- ML20140D065 + (ML20140D065)
- ML20140D066 + (ML20140D066)
- ML20140D067 + (ML20140D067)
- ML20140D069 + (ML20140D069)
- ML20140D071 + (ML20140D071)
- ML20140D072 + (ML20140D072)
- 05000265/LER-1997-004-06, :on 970509,drywell Equipment Drain Sump & Floor Drain Sump Covers Were Not Constructed IAW Design Drawings, Due to Original Construction Error.Design Change Package Has Been Completed + (ML20140D073)