- ML20138B739 + (ML20138B739)
- ML20138B742 + (ML20138B742)
- ML20138B744 + (ML20138B744)
- ML20138B745 + (ML20138B745)
- ML20138B746 + (ML20138B746)
- IR 05000440/1985064 + (ML20138B747)
- IR 05000254/1985001 + (ML20138B749)
- ML20138B750 + (ML20138B750)
- ML20138B752 + (ML20138B752)
- ML20138B753 + (ML20138B753)
- 2CAN038607, Forwards Revised Schedule for Completion of Inadequate Core Cooling Sys Milestones (NUREG-0737,Item II.F.2). Qualification Program for in-containment Cabling & Connectors for Core Exit Thermocouples Currently Underway + (ML20138B755)
- ML20138B756 + (ML20138B756)
- ML20138B757 + (ML20138B757)
- ML20138B760 + (ML20138B760)
- ML20138B761 + (ML20138B761)
- PNO-III-86-025A, ultrasonic Testing Identified Cracks in Shafts of Two Pumps.Cracks Suspected in Two Other Pump Shafts.Replacement of Four Reactor Coolant Pump Shafts Will Delay Startup Until mid-Oct 1986 + (ML20138B762)
- 05000245/LER-1997-015-01, :on 970321,inadvertent Actuation of Group Six Containment Isolation Identified Due to Noise Spike Generated from Maint Activities.Bypass Containment Hrrm to Preclude Inadvertent High Radiation Alarms & Actuations + (ML20138B764)
- ML20138B766 + (ML20138B766)
- ML20138B767 + (ML20138B767)
- ML20138B769 + (ML20138B769)
- ML20138B771 + (ML20138B771)
- ML20138B772 + (ML20138B772)
- ML20138B774 + (ML20138B774)
- IR 05000298/1985023 + (ML20138B775)
- ML20138B777 + (ML20138B777)
- IR 05000352/1985035 + (ML20138B778)
- ML20138B779 + (ML20138B779)
- ML20138B783 + (ML20138B783)
- ML20138B784 + (ML20138B784)
- ML20138B786 + (ML20138B786)
- ML20138B787 + (ML20138B787)
- ML20138B790 + (ML20138B790)
- ML20138B791 + (ML20138B791)
- ML20138B792 + (ML20138B792)
- ML20138B793 + (ML20138B793)
- ML20138B795 + (ML20138B795)
- ML20138B798 + (ML20138B798)
- 05000293/LER-1997-008, :on 970312,setpoint of Target Rock Relief Valve Pilot Assembly Was Out of Tolerance During Testing,Due to Setpoint Drift.Valve Was Disassembled,Inspected & Reworked by Target Rock Corp Personnel + (ML20138B800)
- ML20138B801 + (ML20138B801)
- ML20138B803 + (ML20138B803)
- HL-5355, Informs That Review of Mods to Logic Circuits for Rps,Dg Loading Shedding & Load Sequencing & Actuation Logic for ECCS Was Completed on 970331,per GL 96-01 + (ML20138B804)
- ML20138B805 + (ML20138B805)
- ML20138B806 + (ML20138B806)
- 05000369/LER-1997-003-02, :on 970326,both Trains of Control Room Ventilation Sys Inoperable Due to Isolated Air Intake Valves.Radiation Monitor Will Be Evaluated to Determine If Changes Are Needed in Design or Maint + (ML20138B807)
- ML20138B809 + (ML20138B809)
- NSD-NRC-97-5085, Submits Westinghouse Responses to NRC Questions & Comments Re AP600 Ts,For SSAR + (ML20138B811)
- ML20138B813 + (ML20138B813)
- ML20138B814 + (ML20138B814)
- ML20138B817 + (ML20138B817)
- ML20138B818 + (ML20138B818)
- AECM-86-0078, Withdraws 851011 Application for Amend to License NPF-29 Re Installation of Air Receiver Pressure Indication. Requirements of License Condition 2.c.(33)g Will Be Fulfilled Prior to Startup from First Refueling + (ML20138B819)