Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138B016 + (ML20138B016)
- ML20138B019 + (ML20138B019)
- ML20138B021 + (ML20138B021)
- ML20138B025 + (ML20138B025)
- ST-HL-AE-5627, Responds to NRC Re Violations Noted in Insp Rept 50-499/97-01.Corrective Actions:Rv Vacuum Fill Procedure Was Revised Prior to 1RE07 or Next Entry Into Reduced Inventory Operations & Vent Valves on Temporary Manifold Evaluated + (ML20138B026)
- ML20138B028 + (ML20138B028)
- U-602730, Informs NRC That Wd Romberg Has Become Assistant Vice President of Illinois Power + (ML20138B029)
- ML20138B032 + (ML20138B032)
- ML20138B033 + (ML20138B033)
- ML20138B034 + (ML20138B034)
- ML20138B036 + (ML20138B036)
- 05000321/LER-1997-003-01, :on 970325,RBM Operability Requirements Did Not Match Rod Withdrawal Error Analysis Assumptions Resulting in Disparity Between Core Analysis Design Procedure Assumptions & TS Requirements.Changes to TS Prepared + (ML20138B038)
- ML20138B041 + (ML20138B041)
- ML20138B042 + (ML20138B042)
- ML20138B043 + (ML20138B043)
- ML20138B044 + (ML20138B044)
- ML20138B046 + (ML20138B046)
- ML20138B048 + (ML20138B048)
- ML20138B049 + (ML20138B049)
- ML20138B050 + (ML20138B050)
- ML20138B051 + (ML20138B051)
- AECM-85-0326, Application for Amend to License NPF-29,supplementing 850823 Request.Amend Supports Design Change Scheduled During Planned Outage in Oct 1985 + (ML20138B052)
- PNO-IV-86-009A, on 860313,10-ton UF6 Cylinder Overfilled. Caused by Improperly Positioned Lever on Scale at Filling Station.Scale Repaired & Recertified by Mcelheny Scale Co. Personnel Interviews Expected to Be Completed on 860317 + (ML20138B053)
- ML20138B056 + (ML20138B056)
- ML20138B057 + (ML20138B057)
- ML20138B058 + (ML20138B058)
- ML20138B059 + (ML20138B059)
- U-600347, Requests Exemption for Two Postulated Pipe Breaks in RHR HX Cubicles from SRP Section 3.6.1 to Resolve Flooding Issue. FSAR Will Be Revised to Reflect Change + (ML20138B060)
- ML20138B061 + (ML20138B061)
- ML20138B062 + (ML20138B062)
- ML20138B064 + (ML20138B064)
- ML20138B065 + (ML20138B065)
- ML20138B066 + (ML20138B066)
- ML20138B068 + (ML20138B068)
- ML20138B070 + (ML20138B070)
- AECM-86-0065, Corrected Special Rept 84-028/0 Re Div I Generator Trip Caused by Overheating of Linear Reactor.Statement in Paragraph 4 Should Read Reactors Are Rated for an Inlet Air Temp of Approx 120 F + (ML20138B071)
- ML20138B074 + (ML20138B074)
- ML20138B075 + (ML20138B075)
- B11785, Forwards Addl Info Re Proof & Review Tech Specs,In Response to Listed Requests.Tech Specs Include Items 3/4.6.1.7 Re Containment Ventilation Sys & 3/4.3.2 Re ESFAS Instrumentation + (ML20138B076)
- ML20138B078 + (ML20138B078)
- ML20138B079 + (ML20138B079)
- ML20138B080 + (ML20138B080)
- B11726, Forwards Comments on Draft SER for Conversion of Provisional OL (Pol) to full-term OL & Comments on Existing Pol,In Response to Transmitting Draft SER + (ML20138B081)
- ML20138B082 + (ML20138B082)
- ML20138B083 + (ML20138B083)
- ML20138B084 + (ML20138B084)
- ML20138B085 + (ML20138B085)
- IR 05000027/1985002 + (ML20138B087)
- U-600358, Requests Approval of Fire Doors Installed W/Strips of Polystyrene or Polyethylene Foam Per Factory Mutual Research Review.Rating of Doors Not Decreased.Factory Mutual Research Re Door Exam Encl + (ML20138B088)
- IR 05000498/1985024 + (ML20138B089)
- 05000341/LER-1997-007, :on 970325,condition Prohibited by TS Due to Failure of Reactor Building Hvac.East RBHVAC Exhaust & Supply Fans Were Started in Order to Reestablish Secondary Containment Integrity & Failed Solenoid Valve Replaced + (ML20138B090)