Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138A502 + (ML20138A502)
- ML20138A505 + (ML20138A505)
- 05000458/LER-1985-001, :on 850831,reactor Protection Sys Actuated on High Source Range Monitor Counts.Caused by Core Geometry Change When Fuel Initial Bundle Placed in Core.Four Fuel Loading Chambers Relocated to Eliminate High Count + (ML20138A506)
- ML20138A508 + (ML20138A508)
- 05000327/LER-1997-006-01, :on 970322,failed to Perform Surveillance Requirement During Containment Entry Due to Personnel Error. RWP Was Closed to Prevent Further Use + (ML20138A509)
- 05000458/LER-1985-002, :on 850904,reactor Protection Sys Actuated on High Main Steam Line Radiation & High Scram Discharge Vol Level.Caused by Reactor Protection Sys Channel a Manual Trip During Calibr Coupled W/Inadvertent Noise Spikes + (ML20138A510)
- ML20138A511 + (ML20138A511)
- ML20138A512 + (ML20138A512)
- ML20138A513 + (ML20138A513)
- ML20138A514 + (ML20138A514)
- ML20138A516 + (ML20138A516)
- ML20138A520 + (ML20138A520)
- 05000458/LER-1985-003, :on 850904,full Reactor Protection Sys Actuation Occurred.Caused by Unintentional Shorting of Contact While Attempting to Install Jumper.Fuse C71-F7A Replaced & Jumpers Moved to Terminal Blocks + (ML20138A524)
- IR 05000155/1986005 + (ML20138A526)
- ML20138A527 + (ML20138A527)
- ML20138A533 + (ML20138A533)
- ML20138A534 + (ML20138A534)
- IR 05000458/1985031 + (ML20138A535)
- ML20138A535 + (ML20138A535)
- ML20138A538 + (ML20138A538)
- ML20138A540 + (ML20138A540)
- ML20138A545 + (ML20138A545)
- ML20138A546 + (ML20138A546)
- ML20138A549 + (ML20138A549)
- U-600458, Forwards Responses to Four of Five Open Generic Items & Specific Concerns Re Component 1E22-F010,per NRC Pump & Valve Operability Review Team 860128 Draft SER + (ML20138A552)
- ML20138A554 + (ML20138A554)
- ML20138A555 + (ML20138A555)
- ML20138A556 + (ML20138A556)
- ML20138A558 + (ML20138A558)
- ML20138A561 + (ML20138A561)
- ML20138A562 + (ML20138A562)
- 05000458/LER-1985-004, :on 850906,discovered That APRM Weekly Reactor Protection Sys Tests for Channels B,D,E,G & H Unsatisfactory Per Requirements for Setdown Neutron Trip.Caused by Exclusion of Steps to Verify Half Scram + (ML20138A563)
- RBG-22-000, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-31.Corrective Actions:Valve Lineup Delineated in Procedure 1-PT-57-1 Reverified + (ML20138A567)
- ML20138A569 + (ML20138A569)
- ML20138A570 + (ML20138A570)
- ML20138A574 + (ML20138A574)
- ML20138A576 + (ML20138A576)
- ML20138A580 + (ML20138A580)
- ML20138A581 + (ML20138A581)
- 05000458/LER-1985-005, :on 850913,reactor Protection Sys Actuation Occurred.Caused by Operator Error When Intermediate Range Monitor Channel E Mode Switch Inadvertently Moved from Operate to Standby.Switch Placed in Operate Position + (ML20138A583)
- ML20138A584 + (ML20138A584)
- ML20138A585 + (ML20138A585)
- ML20138A587 + (ML20138A587)
- ML20138A589 + (ML20138A589)
- ML20138A591 + (ML20138A591)
- ML20138A593 + (ML20138A593)
- IR 05000498/1985007 + (ML20138A594)
- ML20138A595 + (ML20138A595)
- ML20138A597 + (ML20138A597)
- ML20138A598 + (ML20138A598)
- ML20138A599 + (ML20138A599)