Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137G064 + (ML20137G064)
- ML20137G066 + (ML20137G066)
- ML20137G067 + (ML20137G067)
- ML20137G073 + (ML20137G073)
- ML20137G075 + (ML20137G075)
- ML20137G077 + (ML20137G077)
- IR 05000483/1996004 + (ML20137G078)
- ML20137G081 + (ML20137G081)
- IR 05000498/1996022 + (ML20137G082)
- ML20137G085 + (ML20137G085)
- ML20137G089 + (ML20137G089)
- PNO-II-85-078, crack Identified on Weld of 3/4-inch Sample Line Running Off RCS Letdown Line.Weld Crack in Identical Location to One Found on 850729.Weld Repaired.Pipe Supports Being Installed + (ML20137G093)
- AECM-85-0242, Responds to Violations Noted in Insp Rept 50-416/85-20. Corrective Actions:Plant Administrative Procedure 01-S-06-24, Safety & Environ Evaluations, Revised + (ML20137G097)
- ML20137G099 + (ML20137G099)
- ML20137G100 + (ML20137G100)
- ML20137G102 + (ML20137G102)
- ML20137G103 + (ML20137G103)
- PNO-IV-85-042, on 850819,manual Reactor Trip Occurred When Main Feedwater Pump B Turbine Speed Governor Failed, Causing Transient.Repairs Underway on Leaking Secondary Handhole of Steam generator.One-wk Outage to End 850726 + (ML20137G105)
- ML20137G107 + (ML20137G107)
- ML20137G108 + (ML20137G108)
- ML20137G112 + (ML20137G112)
- ML20137G114 + (ML20137G114)
- ML20137G116 + (ML20137G116)
- ML20137G120 + (ML20137G120)
- ML20137G122 + (ML20137G122)
- ML20137G124 + (ML20137G124)
- ML20137G126 + (ML20137G126)
- ML20137G128 + (ML20137G128)
- ML20137G131 + (ML20137G131)
- ML20137G133 + (ML20137G133)
- IR 05000483/1997001 + (ML20137G136)
- ML20137G137 + (ML20137G137)
- ML20137G139 + (ML20137G139)
- IR 05000440/1985051 + (ML20137G140)
- ML20137G148 + (ML20137G148)
- ML20137G149 + (ML20137G149)
- VPN-026-97, Submits Trojan ISFSI Radiation Protection Program to Be Implemented IAW Proposed TS (Pge 1071),Section 5.7.2.1.Info Provided to Facilitate NRC Review of 960326 License Application + (ML20137G152)
- ML20137G154 + (ML20137G154)
- ML20137G158 + (ML20137G158)
- DCL-85-275, Provides Supplemental Response to IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Full Load Test of 24 H Duration Performed on Generators 2-1 & 2-2 + (ML20137G160)
- 3F0397-28, Forwards Request for Addl Info Re Resolution of Unresolved Safety Issue A-46, Verification of Seismic Adequacy of Equipment in Operating Reactors USI A-46 + (ML20137G161)
- IR 05000348/1985030 + (ML20137G163)
- ML20137G166 + (ML20137G166)
- ML20137G168 + (ML20137G168)
- BSEP-85-1461, Responds to Violations Noted in Insp Repts 50-325/85-19 & 50-324/85-19.Corrective Actions:Field Rev 42 Issued to Plant Mod 82-219P to Correct Installation on Support 1SW-142PG409 & Spec 248-107 Revised + (ML20137G172)
- ML20137G173 + (ML20137G173)
- U-600237, Forwards marked-up FSAR Page B-3,providing Clarifications Requested by Adoption of Rev 2 to Visual Weld Acceptance Criteria.... Info Will Be Included in Amend 35 to FSAR + (ML20137G175)
- ML20137G176 + (ML20137G176)
- ML20137G178 + (ML20137G178)
- ML20137G179 + (ML20137G179)
- ML20137G182 + (ML20137G182)