Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137B013 + (ML20137B013)
- ML20137B014 + (ML20137B014)
- ML20137B017 + (ML20137B017)
- ML20137B018 + (ML20137B018)
- ML20137B019 + (ML20137B019)
- ML20137B025 + (ML20137B025)
- ML20137B026 + (ML20137B026)
- 1CAN118504, Discusses Installation of Hydrogen Recombiners in Combustible Gas Control Sys.Benefits of Installation Listed. Meeting to Discuss Sys Upgrades & to Seek NRC Approval Requested + (ML20137B029)
- ML20137B030 + (ML20137B030)
- TXX-4533, Final Deficiency Rept SDAR-185 Re Installation of Various Terminal Connectors in Fire Detection Sys Contrary to Manufacturer Acceptance Criteria.Initially Reported on 850708.Item Not Reportable Per 10CFR50.55(e) + (ML20137B035)
- PY-CEI-NRR-0428, Forwards Fee for 851227 Application for Amend to CPPR-148 to Extend Const Completion Date + (ML20137B036)
- ML20137B041 + (ML20137B041)
- ML20137B042 + (ML20137B042)
- ML20137B044 + (ML20137B044)
- ML20137B046 + (ML20137B046)
- ML20137B047 + (ML20137B047)
- ML20137B049 + (ML20137B049)
- ML20137B050 + (ML20137B050)
- ML20137B054 + (ML20137B054)
- ML20137B056 + (ML20137B056)
- ML20137B057 + (ML20137B057)
- ML20137B060 + (ML20137B060)
- ML20137B063 + (ML20137B063)
- IR 05000271/1985036 + (ML20137B068)
- ML20137B069 + (ML20137B069)
- 05000346/LER-1985-013, :on 850609,main Feedwater Pump 1 Tripped on Overspeed Due to Control Problem.Reactor Also Tripped on High RCS Pressure Because of Inadequate Feedwater.Corrective Actions Not Yet Determined + (ML20137B072)
- ML20137B076 + (ML20137B076)
- ML20137B077 + (ML20137B077)
- ML20137B078 + (ML20137B078)
- IA-96-492, Forwards Proposed Notice of Violation & Proposed Imposition of Civil Penalities Based on Six Violations of Security Program at Mentioned Plants + (ML20137B078)
- ML20137B079 + (ML20137B079)
- ML20137B080 + (ML20137B080)
- 05000352/LER-1985-092, :on 851205,main Control Room Chlorine Isolation & Emergency Fresh Air Sys Actuation Occurred. Caused by Tape Breakage in Analyzer D.Analyzer Tape Repaired.New Sys Temporarily Installed + (ML20137B082)
- ML20137B083 + (ML20137B083)
- TXX-4530, Interim Deficiency Rept SDAR-186 Re Apparent Conflict Between Sequence of Operation of CCW Pump & Associated HVAC Sys.Initially Reported on 850716.Evaluation Continuing. Completion Expected by 851004 + (ML20137B086)
- TXX-4661, Interim Deficiency Rept SDAR:CP-85-47 Re Use of Amptector Iia Relays in 480 Switchgear Instead of Specified Relays. Initially Reported on 851202.Evaluation of Relays in safety- Related Switchgears to Be Completed by 860131 + (ML20137B090)
- ML20137B092 + (ML20137B092)
- ML20137B093 + (ML20137B093)
- ML20137B096 + (ML20137B096)
- ML20137B097 + (ML20137B097)
- 05000352/LER-1985-094, :on 851207,main Control Room Chlorine Isolation & Emergency Fresh Air Sys Initiation Occurred.Caused by Failure of Toxic Chemical Analyzer Servo Mechanism. Isolation Reset.New Detector Installed + (ML20137B099)
- ML20137B100 + (ML20137B100)
- ML20137B101 + (ML20137B101)
- ML20137B102 + (ML20137B102)
- ML20137B105 + (ML20137B105)
- 05000275/LER-1985-037, :on 851030 & 1101,missed Surveillances of Containment Spray Pumps Occurred.Caused by Engineer Failing to Increase Surveillance Test Frequency When Pumps Reached Alert Range + (ML20137B106)
- 05000295/LER-1985-041-03, :on 851022, 1 H Outside Delta I Band in Last 24 H Annunciators Found Inoperable.Caused by Error in Computer Program.Error Corrected & Program Tested. Administrative Procedure Implemented + (ML20137B110)
- ST-HL-AE-1525, Forwards Addl Info Re Containment Subcompartment Analysis, Including Comparison Study of Mass & Energy Release Rates Calculated by RELAP-4 & RELAP-5 & Summary of Blowdown Calculations for Chemical & Vol Control Sys + (ML20137B113)
- ML20137B115 + (ML20137B115)
- ML20137B116 + (ML20137B116)
- ML20137B118 + (ML20137B118)