ML20137B093
| ML20137B093 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 01/06/1986 |
| From: | La'Toya Cooper NEBRASKA PUBLIC POWER DISTRICT |
| To: | Varner D NEBRASKA, STATE OF |
| References | |
| NUDOCS 8601150078 | |
| Download: ML20137B093 (2) | |
Text
,../
O 4
GENERAL OFFICE Nebraska Public Power District
- ""EsYo"~"e"<S4"f"^!s% *** """
January 6, 1986 Dick Varner Nebraska Department of Environmental Control Permits and Enforcement Section P. O. Box 94877 301 Centennial Mall 8
Lincoln, Nebraska 68509-4877
Subject:
Nebraska Public Power District Cooper Nuclear Station NPDES Permit No. NE 0001244 Noncompliance Report
Dear Mr. Varner:
On January 2, 1986, you were. notified by telephone that a total i
suspended solid noncompliance had occurred at Cooper Nuclear Station's 005 discharge. Enclosed is the noncompliance report submitted in accordance with requireuents of the Station's NPDES permit.
If you have any questions, please contact me.
Sincerely, L. John Cooper
-l Environmental Manager EYC/cl Enclosure cc:
R. D. Martin w/ enclosure
- 4. B. Vassallo P. V. Thomason R. L. Bulke File CB175 8601150078 860106 4[
PDR ADOCK 05000298 S
PDR h
\\
3
f p
q scenasica eter.arut:r er c vin:wntura controt.
l PERillTEE HA!!E:
c:21i:na rai.urcur ciscw::ct ti. : etariin sysitu
$3 N braska Public Power District vnri COMPLIANCE' REPORT 4
Cooper Nuclear Station j'
NE Quarter, NW Quarter, Section 32 Township SN, Range 16E, Nemaha County
- tIIIS REPORT MUST DE FILED WIIEN 'IllE LABORNIORY B
Pipe 005 TEST RESULT!!. FROM ANY EFPLUENT SAMPLE EXCEEDS
.-e TIIE LIMITS IN YOUR NPDES DISCllARGE PERMIT.
o 00 NE0001244 8p J 2_ pl E)g 8'"'"'
- ^'
rtRnti nunsrR Taken luSTRUCTroNS FOR COMPLETION ARE on DACK.
=o ronCCtrTRAf tut;- (fin /L)
FRmtfTNCT y,,,,g QUANTIIT (RG/MT)
UI FARAMETTR MC AttRACE PMX tt1Utt Utt t T1 AVERAct IfAXIttJH tlMITS Apattggs I
2 98 2
1/30 24 Hr. Com ).
prt0RitD 1*85 Total Suspended kg/ day mg/l
\\f Solids tra"If 1.14 1.71 30 45 1/90 24 Hr. Com ).
l CON 0titelf s
9 EPOILTED n
e FFRMIT CONDiflDN RIFCRTED FFRMIT CotwITI018 RETURTfD 3
X X
COnettION FLOW RorORrrO O_00sn MGD Description and Variable flows to the treatment plant and lack of proper attention by the operators.
cause of b
tion Cor7pliance.
A A
r.srit es rRtt:CitAt. EXECUTIVE OITICt3 f TILE OF OFFICFR MTC t CFRitFT 1 HAT I Art TANtt TAR Wi1M filt fl4UR-I rtAttf 40 tnHfAltittp til T1183 RFitikT Afr5 TitAt TO TIIE Cooper L.
John Environmental Manager 8l6 0l1 0l6 arar er'ar etRutics ann nti.itr soCn tureRiattOn '(4curne effRttr4Al. nicur Ve 131 RUE, (StftLETE Atlp AtttlRAtte DFrtcrR OR Aut1toRl1F.tl ACFNT a
IAtf FIRST Mt TITI g ftAt instrtit BAT e