Forwards Insp Rept 50-298/85-24 on 850801-0930 & Notice of Violation
ML20137B050
Person / Time
Site: Cooper Entergy icon.png
Issue date: 11/14/1985
From: Martin L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20137B054 List:
References
NUDOCS 8511260168
Download: ML20137B050 (2)


See also: IR 05000298/1985024

Text

1

'

.

.

NOV 141985

In Reply Refer To:

Docket 50-298/85-24

Nebraska Public Power District

ATTN:

J. M. Pilant, Manager, Technical

Staff-Nuclear Power Group

P. O. Box 499

Columbus, Nebraska

68601

Gentlemen:

This refers to the inspection conducted by Mr. D. DuBois of this office during

the period August 1-September 30, 1985, of activities authorized by NRC

Operating License DPR-46 for Cooper Nuclear Station, and to the discussion of

our findings with Mr. P. Thomason and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included operational safety verification,

monthly surveillance and maintenance observations, licensee action on previous

inspection findings, complex surveillance, inservice inspection, primary

containment integrated leak rate test, reactor coolant system hydrostatic test,

plant startup from refueling, startup testing, security activities, emergency

preparedness drills, notification of an unusual event, and followup of licensee

event reports.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the inspector.

These findings are documented in the enclosed

inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

RPBMh

RIV: SRI

RP

bois/sn:de

JPJ don

LEMartm

y/G85

\\l /Q/85

llllAl/85

\\

8511260168 851114

/0

PDR

ADOCK 05000298

y

G

PDR

,

l

.

..

. . - . .

.

--

.-

.

. - .

- -

.r-

.

,

Nebraska Public Power District

-2-

Should you have any questions concerning this inspection ~, we will be. pleased to

,

discuss them with you.

Sincerely,

Or:3n.( si ned

Ly:

i

$

[). D4. flunnitKYf

I*}f

L. E. Martin, Acting Chief

,

Reactor Projects Branch

Enclosures:

1.

Appendix.A - Notice of Violation

~2.

Appendix B - NRC Inspection Report

50-298/85-24

l

cc w/ enclosures:

Paul V. Thomason, Division Manager

of_ Nuclear Operations

Cooper Nuclear. Station -

.

.

P. O. Box 98:

i

Brownville, Nebraska

68321

~

Kansas Radiation Control Program Director

f

,3 Nebraska Radiation Control Program Director

bec to DMB (IE01)

'

,-

bec distrib. by RIV:

~*RPB

R. P. Denise, DRSP

  • Resident Inspector

R. D. Martin, RA

  • Section Chief'(RPB/A)
  • D. Weiss, LFMB (AR-2015)
  • EP&RPB
  • RSB

MIS System

!

  • RIV File

)

'*RSTS Operator

<

  • w/766

f

l

I

..

. .

. . - . .

.

_ . . _ . . . . . . - . _ . _ _ _ _ . . _ . . _ . ~ . - . _ . . - . , . . -

. _ .

.__.,

.-_..._ _.

_-._.

--