Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137A685 + (ML20137A685)
- ML20137A686 + (ML20137A686)
- ML20137A687 + (ML20137A687)
- ML20137A689 + (ML20137A689)
- 05000413/LER-1985-045-01, :on 850710,during 18-month Surveillance Calibrs,Reactor Trip Occurred on lo-lo Steam Generator. Caused by Personnel Error.Technician in Field Will Be Provided Documentation + (ML20137A690)
- ML20137A691 + (ML20137A691)
- ML20137A692 + (ML20137A692)
- ML20137A694 + (ML20137A694)
- ML20137A698 + (ML20137A698)
- IA-85-689, Responds to FOIA Request for SECY-85-150 Final Policy Statement on Engineering Expertise on Shift & Suppls. SECY-85-150 Available in Pdr.No Suppls Exist + (ML20137A698)
- ML20137A699 + (ML20137A699)
- 05000302/LER-1985-030, :on 851207,reactor Trip Occurred During Switchover of Pumps.Caused by Reactor Coolant Pump Power Monitors Not Bypassed Before Performing Switchover.Procedure Revised & Operator Counseled + (ML20137A701)
- ML20137A703 + (ML20137A703)
- IA-85-547, Slide Presentation from 840507 Meeting in Bethesda,Md to Discuss Facility.Ten Oversize Pages of bar-chart Plot Based on Schedule Dates Encl + (ML20137A703)
- ML20137A706 + (ML20137A706)
- ML20137A707 + (ML20137A707)
- ML20137A708 + (ML20137A708)
- ML20137A709 + (ML20137A709)
- IR 05000333/1985019 + (ML20137A710)
- ML20137A712 + (ML20137A712)
- ML20137A713 + (ML20137A713)
- IA-96-480, Second Final Response to FOIA Request for Records.Forwards Documents Listed in App B.Documents Being Made Available in PDR + (ML20137A717)
- ML20137A717 + (ML20137A717)
- ML20137A718 + (ML20137A718)
- ML20137A719 + (ML20137A719)
- ML20137A720 + (ML20137A720)
- ML20137A722 + (ML20137A722)
- ML20137A723 + (ML20137A723)
- ML20137A725 + (ML20137A725)
- ML20137A727 + (ML20137A727)
- IR 05000445/1985006 + (ML20137A729)
- ML20137A732 + (ML20137A732)
- ML20137A733 + (ML20137A733)
- ML20137A734 + (ML20137A734)
- ML20137A740 + (ML20137A740)
- ML20137A741 + (ML20137A741)
- ML20137A742 + (ML20137A742)
- ML20137A743 + (ML20137A743)
- ML20137A745 + (ML20137A745)
- ML20137A746 + (ML20137A746)
- ML20137A747 + (ML20137A747)
- ML20137A749 + (ML20137A749)
- ML20137A750 + (ML20137A750)
- CY-97-005, Submits Closeout of Commitment from 961115 Response to GL 96-05, Periodic Verification of Design Basis Capability of Motor Operated Valves + (ML20137A751)
- ML20137A753 + (ML20137A753)
- TXX-4585, Responds to NRC Re Violations Noted in Insp Rept 50-445/85-06.Corrective Actions:Maint Administrative Procedure MDA-201 Being Revised,Deficiency Rept DR-85-078 Processed & Rev 2 to Procedure STA-404 Issued + (ML20137A755)
- ML20137A756 + (ML20137A756)
- ML20137A757 + (ML20137A757)
- ML20137A758 + (ML20137A758)
- ML20137A759 + (ML20137A759)
- ML20137A762 + (ML20137A762)