Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135B633 + (ML20135B633)
- ML20135B635 + (ML20135B635)
- ML20135B636 + (ML20135B636)
- ML20135B639 + (ML20135B639)
- ML20135B640 + (ML20135B640)
- L-85-270, Monthly Operating Repts for June 1985 + (ML20135B642)
- IR 05000254/1996015 + (ML20135B643)
- ML20135B645 + (ML20135B645)
- 05000255/LER-1985-012, :on 850807,determined That Quarterly Tests of Five Containment Isolation Valves Not Performed Per Tech Spec 4.5.2.d.2.Caused by Personnel Error.Administrative Controls for Surveillance Program Corrected + (ML20135B648)
- ML20135B650 + (ML20135B650)
- PY-CEI-NRR-0337, Responds to NRC 850715 Request for Addl Info Re ASME Code Class 1 Pipe Break Locations.Branch Connection to Feedwater Line Outside Containment Up to Reactor Water Cleanup Line Evaluated for Pipe Whip & Jet Impingement.Break Unlikely + (ML20135B651)
- ML20135B652 + (ML20135B652)
- PY-CEI-NRR-0333, Forwards Proposed FSAR App 1B, License Commitments, Including Shift Operating Experience,Tmi Item I.G.1, Inservice Insp Program Reg Guide 1.97,per SER Commitments. Generic Conditions Not Included + (ML20135B653)
- ML20135B654 + (ML20135B654)
- 05000213/LER-1985-021, :on 850805,open Fire Barrier Discovered Between Cable Spreading Area & Maint Hot Shop.Caused by Exclusion of Sheet Metal Wall Section from Fire Barrier Penetration Program.Program Reviewed & Will Be Revised + (ML20135B655)
- ML20135B656 + (ML20135B656)
- ML20135B661 + (ML20135B661)
- ML20135B662 + (ML20135B662)
- ML20135B664 + (ML20135B664)
- ML20135B665 + (ML20135B665)
- ML20135B667 + (ML20135B667)
- ML20135B668 + (ML20135B668)
- 05000354/LER-1996-024-01, :on 961029,two Redundant Vacuum Breakers on a Station Svc Water Sys Loop Were Tested & Found Inoperable Due to Accumulation of Deposits on Internal Moving Parts. Both Vacuum Breakers on a Station,Repaired + (ML20135B670)
- ML20135B671 + (ML20135B671)
- 2CAN119604, Forwards Response to RAI Dtd 960520,re ANO-2 SG Tube Sleeves + (ML20135B673)
- ML20135B674 + (ML20135B674)
- IR 05000263/1996008 + (ML20135B675)
- ML20135B676 + (ML20135B676)
- ML20135B677 + (ML20135B677)
- ML20135B678 + (ML20135B678)
- ML20135B679 + (ML20135B679)
- ML20135B681 + (ML20135B681)
- ML20135B682 + (ML20135B682)
- ML20135B683 + (ML20135B683)
- ML20135B685 + (ML20135B685)
- ML20135B686 + (ML20135B686)
- ML20135B688 + (ML20135B688)
- ML20135B689 + (ML20135B689)
- 05000336/LER-1985-004, :on 850314,sufficient Tubes in Each Steam Generator Had Flaws Greater than 40% through-wall to Place Steam Generators in Category C.3 of Tech Spec Table 4.4-6. Sludge Lancing & Chemical Cleaning Initiated + (ML20135B690)
- ST-HL-AE-0055, Submits Revs to Valve Relief Requests RR-55,RR-53 Rev 1 & RR-34 Rev 1 for Unit 1 & RR-51,RR-49 Rev 1 & RR-31 Rev 1 for Unit 2 to Use Alternate Testing Frequency in Assessing Operational Readiness.W/Three Oversize Drawings + (ML20135B691)
- ML20135B692 + (ML20135B692)
- ML20135B694 + (ML20135B694)
- B16044, Submits Change in Schedule for Completion of GL 96-01 Actions as Commited to by Util for Plant,Unit 2 in Ltr + (ML20135B699)
- ML20135B701 + (ML20135B701)
- ML20135B702 + (ML20135B702)
- ML20135B703 + (ML20135B703)
- ML20135B704 + (ML20135B704)
- ML20135B705 + (ML20135B705)
- 05000414/LER-1996-005-06, :on 961028,determined That Plant May Have Operated in Standby Shutdown Sys Potentially Outside of Design Basis.Caused by Inadequate Sys Design Bases.Placed Vent Valves in Planned Maint Schedule + (ML20135B706)
- ML20135B707 + (ML20135B707)
- ML20135B709 + (ML20135B709)