Revised Monthly Operating Rept for May 1985
ML20135B674
Person / Time
Site: Limerick Constellation icon.png
Issue date: 05/31/1985
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20135B440 List:
References
NUDOCS 8509110144
Download: ML20135B674 (1)


Text

~ ~ -

@@@@A91NG DATA REPORT

DOCKET NO. 50 - 352 DATE JUNE 14.1985 REVISED COMPLETED BY PHILADELPHIA ELECTRIC COMPANY 7/}g/gg W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIv!SION-NUCLEAR TELEPHONE (215) 841-5022 OPERAT!hG STATUS

1. UNIT NAME: LIMERICK UNIT 1 l NOTES: UNIT 1 IS IN STARTUP TESTING. l g

i

2. REPORTING PERIOD:

MAY. 1985 l

FACILITY OPERATING LICENSE l

g.

g

3. LICENSED THERMAL POWER (MWT):

165 l

N PF -2 7. ISSUED 10/26/84 RE-l g

l 4 NAMEPLATE RATING (GROSS MWE):

1092 l

STRICTS POWER LEVELS NOT 70 l

g l

5. DESIGN ELECTRICAL RATING (NET MWE):

1055 1

EXCEED 55 0F THE RATED POWER. l 3

i

6. HAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

1 I

l l

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1 i

8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REP 3RT. GIVE REASONS
9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
10. RE ASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 0

0 0

12. NUMBER OF HOURS REACTCR WAS CRITICAL 0

1.413.8 1.451.5

13. REACTOR RESERVE SHUTDCh4 HOURS 0.0 0.0 00
14. HOURS GENERATOR DN-LINE 0.0 25.3 25.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 131.922 131.922
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 310 310 nr 18. NET ELECTRICAL ENERGY GENERATED (MWH)

-7.226

-9.400

+9.400 c,p3m Q-4 S

19. UNIT SERVICE FACTOR 0.0 0.7 0.6 h!
20. UNIT AVAILABILITY FACTOR 00 07 06 g;gg g
21. UNIT CAPACITY FACTOR (USING MDC MET) 0.0 0.0 0.0
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 0.0 0.0 C

[I

23. UNIT FORCED OUTAGE RATE 0.0 0.0 0.0 o,

0 0:

24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE. DATE, AND DURATION OF EACH)8

(}@gg UNIT #1 IN SHUTDOWN M00E. UNIT PENDING FULL POWER LICENSE.

i

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/B4 INITIAL ELECTRICITY MID APRIL 85 4/13/85 COMMERCIAL OPERATION 4TH QTR 85 0 - NEGAT!vE VALUE REPORTED FOR CONSISTENCY WITH FEDERAL ENERGY REGULATORY COMMISSION REPORTS.

L m