Advises of Planned Insp Effort Resulting from Licensee Sppr Review.Details of Insp Plan for Next 8 Months Encl
ML20135B633
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/29/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
References
NUDOCS 9612050082
Download: ML20135B633 (7)


Text

=- _- - ~ - . _ . .-~ _ - - ~ . -

. _ - ~ - , . - - . . . - . - - - - - ~ . _ ~ ~ . - -

s UNITED STATES l

[g* "' %g.; ,. ?'

s NUCLEAR REGULATORY COMMISSION l k 'k $ REGloN IV  ;

S "#

611 RYAN PLAZA DRIVE, SulTE 400

  • 1 9...../ AR LINGToN, TE XAS 76011 8064 .

NOV 291996  !

l Harold B. Ray, Executive Vice President Southern California Edison Co.

San Onofre Nuclear Generating Station l P.O. Box 128 San Clemente, California 92674-0128  !

SUBJECT:

SEMIANNUAL PLANT PERFORMANCE REVIEW - SAN ONOFRE NUCLEAR .

l GENERATING STATION  !

1 i On October 29,1996, the NRC staff completed the Semiannual Plant Performance Review (SPPR) of San Onofre Nuclear Generating Station. The staff conducts these  ;

reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and i allocation of inspection resources. The SPPR for San Onofre involved the participation of i all technical divisions in evaluating inspection results and safety performance information for the period March 1996 to October 1996. SPPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.

1 This letter advises you of our planned inspection effort resulting from the San Onofre SPPR review. It is provided to minimize the resource impact on your staff and to allow for

scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next 8 months. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.

l We willinform you of any changes to the inspection plan. If you have any questions,

! please contact D. Kirsch at (510) 975-0290. j i

i Sincerely, l 1

l k [ J. E. Dyer, Director i Division of Reactor Projects  !

i Docket Nos: 50-361 50-362 a

License Nos: NPF-10 i NPF-15 9612050082 961129 PDR ADOCK 05000361 G PDR

l

. t Southern California Edison Co. .

Enclosure:

Inspection Plan  !

cc w/ enclosure:

Chairman, Board of Supervisors j County of San Diego -

1600 Pacific Highway, Room 335 San Diego, California 92101 l l

Alan R. Watts, Esq.

Rourke & Woodruff ,

701 S. Parker St. No. 7000 1 Orange, California 92668-4702 Sherwin Harris, Resource Project Manager Public Utilities Department City of Riverside 3900 Main Street Riverside, California 92522 R. W. Krieger, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128 Dr. Harvey Collins, Chief Division of Drinking Water and Environmental Management California Department of Health Services P.O. Box 942732 Sacramento, California 94234-7320 Terry Winter, Manager  !

Power Operations  !

San Diego Gas & Electric Company P.O. Box 1831 San Diego, California 92112 Mr. Steve Hsu Radiological Health Branch State Department of Health Services i P.O. Box 942732 Sacramento, California 94234 t l

{

1 l

~ -. - . - - - __ - - .- . - . - - -

1 1

Southern California Edison Co.  !

Mayor City of San Clemente i

100 Avenida Presidio l San Clemente, California 92672 I l

Mr. Truman Burns \Mr. Robert Kinosian California Public Utilities Commission i 505 Van Ness, Rm. 4102 San Francisco, California 94102 i

i i

i I

1 m

Southern California Edison Co. -4 NOV 291996 tisocito DMB llEOTSi/ M bec distrib. by RIV:  ;

L. J. Callan Resident inspector DRP Director DRS-PSB Branch Chief (DRP/F, WCFO) MIS System .

Senior Project inspector (DRP/F, WCFO) RIV File -

Branch Chief (DRP/TSS) M. Hammond (PAO, WCFO) i Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

I DOCUMENT NAME: G:\DRPDIR\SPPR\SO.LTR To receive copy of document, indicate in t,ox: "C" = Copy wthout enclosures "E" = Copy with enclosures "N" = No copy PE:DRP/F C:DRP/F D:DRS Q D:DRP grf)

BJOlson (gl DFKirsch TPGwynn @ JEDye W 11/ 'j /96 11/ / /96 11/'fy96 'V 11/g 9 /96 OFFICIAL RECORD COPY

\

050024

t e

Southern California Edison Co. O bec to DMB (IE01) bec distrib. by RIV:

L. J. Callan Resident inspector 3

DRP Director DRS-PSB

Branch Chief (DRP/F, WCFO). MIS System i Senior Project Inspector (DRP/F, WCFO) RIV File Branch Chief (DRP/TSS) M. Hammond (PAO, WCFO) l Leah Tremper (OC/LFDCB, MS: TWFN 9E10)  ;

l

+ l I

! I i

k l

1 i DOCUMENT NAME: G:\DRPDIR\SPPR\SO.LTR To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy PE:DRP/F C:DRP/F D:DRS p D:DRP g/)

BJOlson (g ) DFKirsch TPGwynn @ JEDye W 11/7 /96 11/ <7 /96 11/'f)/96 "V 11/f 9 /96 OFFICIAL RECORD COPY I

ENCLOSURE SAN ONOFRE NUCLEAR GENERATING STATION INSPECTION PLAN IP - Inspection Procedure Tl - Temporary instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION TITLE / NUMBER OF PLANNED TYPE OF PROGRAM AREA INSPECTORS INSPECTION INSPECTION COMMENTS DATES Tl109 Motor Operated Valve Program 2 11/04-08/96 Temporary Instruction - Closeout of the Tl IP 37001 10 CFR 50.59 Safety 1 11/18-22/96 Regional Initiative - To be performed by the Evaluation Program NRR Project Manager

~

IP 40501 Licensee Self-Assessment 2 12/09-13/96 Core Inspection in lieu of IP 37550 and IP 64704 IP 83750 Occupational Radiation 2 12/16-20/96 Core inspection Exposure IP 71715 Sustained Control Room and 3 12/16-20/96 Regional Initiative - Based on past problems Plant Observations during refueling outages IP 84750 Radioactive Waste Treatment 2 01/13-17/97 Core inspection and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste 2 02/10-14/97 Core Inspection and Temporary Instruction Management and Tl133 Transportation of Radioactive Materials, and implementation of Revised 49 CFR

IP 84750 Radioactive Waste Treatment 1 02/24-28/97 Core Inspection and Effluent and Environmental Monitoring IP 81700 Physical Security Prograrn for 1 02/24-28/97 Core Inspection Power Reactors IP 40500 Effectiveness of Licensee 3 03/17-21/97 Core inspection Controls in 03/31- 04/04/97 Identifying, Resolving, and Preventing Problems IP 73753 Inservice inspection 3 04/07-11/97 Core inspection and Regional Initiatives -

IP 55050 Nuclear Welding Initiatives are a followup from a previous IP 62001 Boric Acid Corrosion Prevention maintenance reliability team inspection Program Tl130 Implementation of improved 3 06/02-06/97 Safety Issue Technical Specification

_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ . - - _ - _ _ - _ _ _ _ - _ _ _ - _ . _ - _ _ _ _ _ . __ - - _ _ - - _ _ - . _ _ _ . _ _ _ - _ _ _ _ _ _ - _ - _ _