OPERATING DATA REPORT

~

DOCKET NO. 50 - 352 RE3/ISED.

ATE MAY 1? 198{_

COMPLETED BY PHILADELPHIA ELECTRIC CDMPANY 7/18/85 W.M.ALDEN ENGINEEt-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 i

OPERATING STATUS

1. UNIT NAME: LIMERICK UNIT 1 l NOTES: UNIT 1 15 IN STARTUP TESTING. l 4
2. REPORTING PERIOD:

APRIL, 1985 i

FACILITY OPERATING LICENSE l

l l

I

3. LICENSED THERM AL POWER (MWT ):

165 i

NPF-27, ISSUED 10/26/84 RE-I l

l

4. NAMEPLATE RATING (GROSS MWE):

1092 l

STRICTS POWER LEVELS NOT TD l

l l

5. DESIGN ELECTRICAL RATING (NET MWE):

1055 l

EXCEED 55 0F THE RATED POWER. l l

l l

l

6. MAXIMUM DEPENDABLE CAPACITY (CROSS MWEls l

l l

l

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

l

9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):

3

10. RE ASONS FOR RE STRICTIONS, IF ANY:

THIS MONTH YR-TD-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD D

0 0

12. NUMBER OF HOURS RE ACTOR W AS CRITICAL 371.7 1.413.8 1,451.5
13. REACTOR RESERVE SHUTDChN HOURS 0.0 0.0 0.0
14. HOURS GENER ATOR ON-LINE 25.3 25.3 25.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 l_
16. GROSS THERMAL ENERGY GENERATED (MWH) 36,254 131,922 131.922
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 310 310 310
18. NET ELECTRICAL ENERGY GENERATED (MWH)

-2,174

~2.174

-2 174

19. UNIT SERVICE FACTOR 3.5 0.9 0.7 0d
t h,$ 20. UNIT AVAILABILITY FACTOR 3.5 0.9 0.7 b
21. UNIT CAPACITY FACTOR (USING MDC, NET) 0.0 0.0

. 0.0

,g

- =:

LX3

22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 0.0 0.0

, lf f

23. UNIT FORCEO QUTAGE RATE 0.0 0.0 0.0

!C g 24.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

  • C

, p.

25. IF SHUTDOWN AT END OF REPORT FERIOD ESTIMATED DATE OF ST ARTUP:

, (Do.a:

I

26. UNITS IN TEST STATUS (PRIOR 10 COMMERCIAL OPERATION):

FOREC A ST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 i

INITIAL ELECTRICITY MID APRIL 85 4/13/85 i

COMMERCIAL OPERATIDN 4 TB GTR 85 k

[._

0 - NEGATIVE VALUE REPORTED FOR CONSISTENCY WITH FEDERAL ENERGY REGULAT3RY COMMISSION REPORTS.

,