OPERATING DATA REPORT
~
DOCKET NO. 50 - 352 RE3/ISED.
ATE MAY 1? 198{_
COMPLETED BY PHILADELPHIA ELECTRIC CDMPANY 7/18/85 W.M.ALDEN ENGINEEt-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 i
OPERATING STATUS
- 1. UNIT NAME: LIMERICK UNIT 1 l NOTES: UNIT 1 15 IN STARTUP TESTING. l 4
- 2. REPORTING PERIOD:
APRIL, 1985 i
FACILITY OPERATING LICENSE l
l l
I
- 3. LICENSED THERM AL POWER (MWT ):
165 i
NPF-27, ISSUED 10/26/84 RE-I l
l
- 4. NAMEPLATE RATING (GROSS MWE):
1092 l
STRICTS POWER LEVELS NOT TD l
l l
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1055 l
EXCEED 55 0F THE RATED POWER. l l
l l
l
- 6. MAXIMUM DEPENDABLE CAPACITY (CROSS MWEls l
l l
l
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
- 8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
l
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
3
- 10. RE ASONS FOR RE STRICTIONS, IF ANY:
THIS MONTH YR-TD-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD D
0 0
- 12. NUMBER OF HOURS RE ACTOR W AS CRITICAL 371.7 1.413.8 1,451.5
- 13. REACTOR RESERVE SHUTDChN HOURS 0.0 0.0 0.0
- 14. HOURS GENER ATOR ON-LINE 25.3 25.3 25.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 l_
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 36,254 131,922 131.922
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 310 310 310
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
-2,174
~2.174
-2 174
- 19. UNIT SERVICE FACTOR 3.5 0.9 0.7 0d
- t h,$ 20. UNIT AVAILABILITY FACTOR 3.5 0.9 0.7 b
- 21. UNIT CAPACITY FACTOR (USING MDC, NET) 0.0 0.0
. 0.0
,g
- =:
LX3
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 0.0 0.0
, lf f
- 23. UNIT FORCEO QUTAGE RATE 0.0 0.0 0.0
!C g 24.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- C
, p.
- 25. IF SHUTDOWN AT END OF REPORT FERIOD ESTIMATED DATE OF ST ARTUP:
, (Do.a:
I
- 26. UNITS IN TEST STATUS (PRIOR 10 COMMERCIAL OPERATION):
FOREC A ST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 i
INITIAL ELECTRICITY MID APRIL 85 4/13/85 i
COMMERCIAL OPERATIDN 4 TB GTR 85 k
[._
0 - NEGATIVE VALUE REPORTED FOR CONSISTENCY WITH FEDERAL ENERGY REGULAT3RY COMMISSION REPORTS.
,