Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135A390 + (ML20135A390)
- ML20135A391 + (ML20135A391)
- ML20135A392 + (ML20135A392)
- ML20135A393 + (ML20135A393)
- ML20135A394 + (ML20135A394)
- ML20135A396 + (ML20135A396)
- IR 05000395/1996011 + (ML20135A397)
- 05000388/LER-1985-024-01, :on 850807,reactor Water Cleanup Containment (RWCU) Inboard Isolation Valve Closed on High Sys Flow Signal.Caused by Fast Opening of Filter/Demineralizer Inlet Valve.Rwcu Operating Procedure Revised + (ML20135A399)
- ML20135A401 + (ML20135A401)
- IR 05000440/1985027 + (ML20135A402)
- ML20135A403 + (ML20135A403)
- 05000219/LER-1996-008, :on 961025,manual Scram Occurred Due to Main Generator Runback.Brought Plant to Hot Shutdown Condition, Troubleshooting Runback Circuit & Generator Runback Circuit Instrumented Down to Individual Switch Status + (ML20135A404)
- IR 05000445/1996011 + (ML20135A405)
- 05000373/LER-1996-011-02, :on 960928,less than Adequate Pneumatic Valves Resulted in Inadequate Valve Closing Forces Which May Affect Containment Isolation.Lasalle Is Implementing Design Change Packages to Compensate for Reduced EDA + (ML20135A407)
- 05000275/LER-1985-026, :on 850710 & 21,nonlicensed Operators Performing Surveillance Test Procedure M-9A-3 Failed to Perform Surveillance Check.Caused by Operator Failing to Understand Requirement.Procedure Revised + (ML20135A408)
- PY-CEI-NRR-0331, Responds to NRC Re Conformance to Reg Guide 1.114,Section C.3 on Operator at Controls.Operator May Enter Expanded Area Depicted on Encl Figure 13.5-1 During Emergency.Info Will Be Submitted in FSAR Amend + (ML20135A409)
- 05000331/LER-1996-006, :on 961026,non-conservative APRM 15% Scram Setpoint Occurred Due to Inadequate Procedures.Oss Immediately Halted Core Alterations & Verified That All CR Were Fully Inserted + (ML20135A410)
- SNRC-1203, Responds to NRC Transmitting Clarifications of & Insp Rept 50-322/85-04 Re post-accident Sampling.Scheduled Completion Date for Several Items Not Met Due to Recent Startup Test Program Activity + (ML20135A411)
- 05000271/LER-1996-006, :on 960214,potentially Inoperable RHR Svc Water Valves Noted.Caused by mfg-fabrication Deficiency.Priority Work Orders Written to Inspect & Torque Bolts on Valves.W/ + (ML20135A412)
- ML20135A413 + (ML20135A413)
- ML20135A415 + (ML20135A415)
- ML20135A416 + (ML20135A416)
- 05000317/LER-1985-008, :on 850806,main Turbine Tripped on High Moisture Separator Reheater Level.Caused by High Level Dump Manual Isolation Valve Being Left in Shut Position After Maint Performed.Work Forms Modified + (ML20135A418)
- ML20135A419 + (ML20135A419)
- ML20135A420 + (ML20135A420)
- ML20135A422 + (ML20135A422)
- ML20135A423 + (ML20135A423)
- ML20135A425 + (ML20135A425)
- ML20135A426 + (ML20135A426)
- ML20135A427 + (ML20135A427)
- ML20135A428 + (ML20135A428)
- ML20135A429 + (ML20135A429)
- ML20135A430 + (ML20135A430)
- ML20135A431 + (ML20135A431)
- ML20135A432 + (ML20135A432)
- ML20135A433 + (ML20135A433)
- ML20135A434 + (ML20135A434)
- ML20135A436 + (ML20135A436)
- IR 05000458/1985041 + (ML20135A438)
- ML20135A439 + (ML20135A439)
- ML20135A440 + (ML20135A440)
- ML20135A441 + (ML20135A441)
- IR 05000423/1985034 + (ML20135A442)
- ML20135A443 + (ML20135A443)
- IR 05000282/1996013 + (ML20135A444)
- ML20135A445 + (ML20135A445)
- IR 05000440/1985057 + (ML20135A446)
- ML20135A447 + (ML20135A447)
- BVY-96-151, Informs That Installation of Improved Fire Protection Sys Will Be Completed by 961231 Instead of 961130 + (ML20135A448)
- ML20135A449 + (ML20135A449)
- ML20135A450 + (ML20135A450)