Forwards Insp Rept 50-458/85-41 on 850522-0712.No Violation or Deviation Noted
ML20135A429
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/05/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20135A433 List:
References
NUDOCS 8509100157
Download: ML20135A429 (2)


See also: IR 05000458/1985041

Text

_. _ . . _

--

. _ . _ _ .

.

_ _ _ . _

_

.

"'*.#

'I

F-

'

, ,J

,

O

.,7

%

< SE' . 0 51985

P

'

?

I

.In Reply Refer To:

~s

-Docket:

50-458/85-41'

Gulf' States Utilities

ATTN: William J. Cahill,-Jr.

.

Senior Vice President

River Bend Nuclear Group

'

P. O. Box 2951

y

Beaumont, Texas 77704

,

'

Gentlemen:

This refers to the inspection conducted by Messrs. J. E. Bess, R. F. Mullikin,

i

-

and W. M. McNeill of this' office during the period May 22-July 12,1985, of'

!

activities authorized by NRC Construction Permit CPPR-145 for River Bend,' .

i

Unit 1, and to the discussion of our findings with you and other members of

your staff at the ' conclusion of the inspection.

' Areas examined during the inspection included followup on previous inspection

' findings,-comparison of as-built plant to FSAR description, verification of

as-built electrical routing and terminations, raceway support welding and

.

Within these areas,

as-built verification of electrical raceway'and conduits.

'

the inspection consisted of selective examination of procedures and representative

.

,

records, interviews with persorinel, and observations by the inspectors. These

'

,

l

findings are documented in the enclosed inspection report.

1

Within the scope of the. inspection, no violations or deviations were

identified.

i

\\

'

We have als~o examined actions you have taken with regard to previously

!

identified inspection; findings. 'The status.of these items-is identified in

paragraph 2 of the enclosed report.-

'

!

,

i

.-

,

,

'

f

1

L. _

f

h

C\\CB

.c-

RIV: RP8/C

MB/ES

RSB/05

RPB/A

RPB

RMullikin;1w

JEBess

WMMcNeil

JPJa

EHJohnson

f/l9/85

t' /M /85

% N1/85

/85

@/{/85

~

.

..

.

.-

_

8509100157 850905

'

'

PDR

ADOCK 05000458

.

-

G

PDR

s.

. ,, ~

-

-

>

,

-r2

-, . .

. q

,

~).

.

. ., A

r_.,* ., *

-.4,.

c,

,

r-

.

Gulf States Utilities

-2-

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

Od?"' *~' 'd U'l

E. H. 'Oh * "

E. H. Johnson, Chief

Reactor Project Branch

Enclosure:

Appendix - NRC Inspection Report

50-458/85-41

cc w/ enclosure:

Gulf States Utilities

ATTN:

J. E. Booker, Manager-

Engineering, Nuclear

Fuels & Licensing

P. O. Box 2951

Beaumont, Texas 77704

Louisiana State University,

Government Documents Department

Louisiana Radiation Control Program Director

bcc to DMB (IE01)

bec distrib. by RIV:

  • RPB

R. P.'Denise, DRSP'

  • Resident Inspector

R. D. Martin, RA

  • Section Chief (RPB/A)
  • D. Weiss, LFMB (AR-2015)
  • MIS System
  • R. Mullikin, RPB/B
  • J. Bess, RSB/ES

.)