NRC INSPECTION REPORT 50-445/96-11: 50-446/96-11
!
Dear Mr. Terry:
Thank you for your letter of November 8,1996,in response to our letter and Notice
of Violation dated October 28,1996. We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of l
your corrective actic is during a future inspection to determine that full compliance has
,
been achieved and will be maintained.
!
l
Sincerely,
'
h J. E. Dyer, Director Division of Reactor Projects v
Docket Nos.: 50-445 50-446 License Nos.: NPF-87 NPF-89 cc:
Mr. Roger D. Walker TU Electric Regulatory Affairs Manager p
' P.O. Box 1002 l
' Glen Rose, Texas 76043
!
>
9612030205 961127 PDR ADOCK 05000445 g
PDR o
._
.
_
..
.
TU Electric-2-Juanita Ellis President - CASE 1426 South Polk Street i
Dallas, Texas 75224 TU Electric Bethesda Licensing 3 Metro Center, Suite 610 Bethesda, Maryland 20814 George L. Edgar, Esq.
Morgan, Lewis & Bockius 1800 M. Street, NW Washington, D.C. 20026 G. R. Bynog, Program Mariager/
Chief Inspector Texas Department of Licensing & Regulation i
Boiler Division P.O. Box 12157, Capitol Station Austin, Texas 78711 Honorable Dale McPherson County Judge P.O. Box 851 Glen Rose, Texas 76043
Texas Radiation Control Program Director 1100 West 491.h Street Austin, Texas 78756 Susan Rieff, Director Environmental Policy
,
Office of the Governor P.O. Box 12428 Austin, Texas 78711
. -.
h
g
.
TU Electric '
-3-NOV 2 71996 gp6iiTsousleoiP
.
bec distrib, by RIV:
l L. J. Callan Resident inspector (2)
DRS-PSB
Branch Chief (DRP/A)
MIS System
~
Project Engineer (DRP/A)
RIV File Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
'
i
'
)
I
l
,
-;
l
,
i i
l DOCUMENT NAME: R:\\ CPSES\\CP611 AK.ATG i
- To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:DRP/A C:DRP/A, D:DRP.
j
,,
RAKopriva:dffj)f,) JITapia y[. j JEDyerEp j
j 11gy96
'
'
11@96 T'
11&1/96
({
OFFICIAL RECORD COPY j
030042
)
f
'
.
,
TU Electric-3-NOV 2 71996 bec to DMB (IE01)
bec distrib. by RIV:
L. J. Callan Resident inspector (2)
DRS-PSB Branch Chief (DRP/A)
MIS System Project Engineer (DRP/A)
RIV File Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
l l
DOCUMENT NAME: R:\\_CPSES\\CP611 AK.ATG To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy l
RIV:DRP/A L
C:DRP/A,
D:DRP.
l
,,
RAKopriva;dfg ) JITapia g( f JEDyerEp
11g5f96
'
11/Jg96 y'
1141/96 OFFICIAL RECORD COPY
,
.
-
i
_q Log # TXX-96502
,
File # 10130
--
"""
""l IR 96-11
"
Ref. # 10CFR2.201
"
-
-
7UELECTRIC November 8, 1996 C. Lance Terry x
Group Vke trendent U. S. Nuclear Regulatory Commission
"We
# d l
Attn:
Document Control Desk i
>
Washington D.C.
20555 SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
j i
DOCKET NO. 50-445 and 50-446 NRC INSPECTION REPORT NOS. 50-445/96-11 and 50-446/96-11 RESPON5E TO NOTICE OF VIOLATION Gentlemen:
j TV Electric has reviewed the NRC's letter dated October 28. 1996.
l pertaining to the inspections conducted by Messrs. A. Gody, Jr.
P. Gage.
and H. A. Freeman on August 18 through September 28, 1996.
Attached to the j
report was a Notice of Violation.
Via Attachment 1 TV Electric hereby responds to the Notice of Violation (446/9611-01).
Should you have any comments or require additional information, please do not hesitate to contact Obaid Bhatty at (817)-897-i 5839 to coordinate this effort.
Sincerely, i
C. )
By:
J. J. Kelley, Jr.
,
Vice President. Nuclear Engineering and Support
..
08:ob
'
Attachment cc: Mr. L. J. Callan Region IV Mr. J. I. Tapia. Region IV Resident Inspectors-Ab4Wi 0i50 37-o z o 6 P. O. Box 1002 Glen Rose. Texas 76643
.
.
4n.
- -
.
.
Attachment 1 to TXX-96502 Page 1 of 2 REPLY TO THE NOTICE OF VIOLATION RESTATEMENT OF THE VIOLATION (446/9611 01)
Technical Specification 6.8.1 requires the licensee to establish.
implement, and maintain procedures covering the activities recommended in Appendix A of Regulatory Guide 1.33. Revision 2. February 1 978. Appendix A recommend.c administrative procedures for component configuration control.
Station Administrative Procedure-STA-605. " Clearance and Safety Tagging."
Revision 1 3. provided the methodology for equipment status and configuration control and defined a danger tag as a device used to prohibit changing the designated position or condition of the component on which they are attached.
Danger Tag 2-96-02507-0036 designated that the Unit 2 Feedwater Pump 2A Seal Injection Filter 2-02 inlet isolation valve (Va 2FW-0509) be in the
"close" position.
Contrary to the above, on September 23. 1 996. Valve 2FW-0509 was found in the open position with Danger Tag 2-96-02507-0036 attached to it.
!
%
RESPONSE TO THE VIOLATION (446/9611-01)
TV Electric accepts the violation and the requested information follows:
1.
Reason for Violation The following event description was gathered via interviews with cognizant personnel involved with subject violation event.
?
On September 23. 1996. Control Room personnel received a call from a maintenance mechanic. The mechanic indicated that the Seal Injection
,
'
Filter 2-02 Isolation valve 2FW-0509 had been found mispositioned in the open position. The Control Room Staff immediately dispatched an Auxiliary Operator (AO) to verify proper alignment.
The A0 reported to the Control Room that the valve was partially open. Control room directed the A0 to manipulate the valve to a fully open position and than close.it, as required by the clearance.
Operation's management interviewed the operators who initially were involved with the lineup of the system. The independent verifier who verified the final lineup was also interviewed. The results of these interviews concluded that the initial valve lineu) was proper.
Based on.this conclusion it was deemed that incidental aumping or
-
.
.
_ -.. -
.
- -. -
-.
, f *..
'
.
Attachment 1 to TXX-96502
'
Page 2 of 2 inadvertent action by some unrelated maintenance activity being performed in close proximity to this valve was the most probable cause for the mispositioning of this valve.
2.
Corrective Steos Taken and Results Achieved
.
Immediate corrective action was to align the mispositioned valve properly 1.e., in its required ' closed' position. A Operation Notification and Evaluation Form (0NE Form) was initiated to document the erroneous valve position.
3.
Corrective Actions Taken to Preclude Recurrence Management's expectation with respect to self verification was reemphasized to cognizant operators. Maintenance management l
repeatedly promulgates to maintenance personnel, the need to protect equipment and notify operation's department when a specific issue (such as this) is discovered for immediate resolution. TV Electric believes that existing practices should minimize recurrence.
4.
Date of Full como11ance TV Electric is in full compliance.
s 5.
Additional Information Based on the interviews with the operators and the immediate causal determination. TV Electric believes that the initial dispositioned category for the ONE Form as " Manager's Trend System" was appropriate. Additionally, we believe a STA-605 violation did not result in a mispositioned valve. This belief is based on the conclusion of additional root cause evalu.ation which yielded similar results, that incidental bumping or inadvertent action on or around the valve most likely caused the partial mispositioning of the valve, and that the initial valve position was correct. With respect to incidental damage or mispositioning of equipment, a review of ONE Form trending data did not reveal any significant matters of concerns i.e., not pervasive. The event was deemed to be an isolated event.
e As stated in Section 3 above. TV Electric management regularly promulgates to its personnel the need to protect equipment and
notify operation's department when a specific issue (such as this) is discovered for immediate resolution.
Regarding the significance of this event: the subject valve is one of two energy isolation points in series isolated for the work in progress.