Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000382/LER-1996-013, Advises That LER 96-013-00 Cancelled Based on Root Cause Analysis Results Concluding That Facility Did Not Operate in Excess of 100% Licensed Reactor Power + (ML20134M716)
- ML20134M717 + (ML20134M717)
- 05000382/LER-1996-009, :on 960726,valves Failed to Pass Leakage Test. Caused by Excessive Roughness in Valve Body Core.Replaced Valves CVR-402A & CVR-402B & Retested Both Valves Successfully + (ML20134M718)
- 2CAN088507, Requests Extension Until 850930 to Respond to 850620 SER Re Inservice Testing Program,Due to Level of Review Necessary for Thorough & Adequate Response + (ML20134M720)
- ML20134M722 + (ML20134M722)
- ML20134M724 + (ML20134M724)
- ML20134M726 + (ML20134M726)
- 3F1196-03, Submits Response to Request for Addl Info on Exemptions from 10CFR50 App R,Sections Iii.G & Iii.J + (ML20134M727)
- IR 05000413/1985027 + (ML20134M729)
- U-602693, Monthly Operating Rept for Jan 1997 for Clinton Power Station,Unit 1 + (ML20134M731)
- ML20134M732 + (ML20134M732)
- PY-CEI-NRR-2136, Forwards Detailed Response to RAI Re Inservice Insp Program & Revised Relief Requests + (ML20134M734)
- ML20134M735 + (ML20134M735)
- ML20134M737 + (ML20134M737)
- ML20134M738 + (ML20134M738)
- 05000373/LER-1996-021, :on 961217,inadequate Review of Mod of Main Control Room Atmospheric Control Sys Radiation Monitoring Logic Resulted in Unreviewed Safety Question.Se for Mod Was Performed in Sept 1992 + (ML20134M739)
- ML20134M740 + (ML20134M740)
- ML20134M741 + (ML20134M741)
- ML20134M742 + (ML20134M742)
- ML20134M743 + (ML20134M743)
- ML20134M744 + (ML20134M744)
- ML20134M745 + (ML20134M745)
- IR 05000317/1996006 + (ML20134M746)
- ML20134M747 + (ML20134M747)
- ML20134M748 + (ML20134M748)
- ML20134M750 + (ML20134M750)
- B130179, Rev 0 to Perry Unit 1 RPV Surveillance Matls Testing & Analysis + (ML20134M751)
- ML20134M752 + (ML20134M752)
- U-602662, Provides Response to follow-up Questions Re Proposed Amend to Change TSs to Incorporate Revised SLMCPR Calculated by GE for Cycle 7,per 961108 Telcon Re Difference in Uncertainties Used in Analyzing Dual & Single Loop Operation + (ML20134M753)
- ML20134M754 + (ML20134M754)
- 05000285/LER-1996-010, :on 961018,loss of Containment Closure Noted Due to Maint Activity During Refueling.Station Procedures Including OI-CO-4,will Be Reviewed & Revised as Necessary to Ensure Adequate Controls Exist + (ML20134M756)
- ML20134M757 + (ML20134M757)
- ML20134M759 + (ML20134M759)
- ML20134M760 + (ML20134M760)
- ML20134M763 + (ML20134M763)
- ML20134M765 + (ML20134M765)
- ML20134M767 + (ML20134M767)
- IR 05000309/1996011 + (ML20134M768)
- LR-N970110, Monthly Operating Rept for Jan 1997 for Hope Creek Generation Station Unit 1 + (ML20134M770)
- ML20134M771 + (ML20134M771)
- ML20134M772 + (ML20134M772)
- ML20134M773 + (ML20134M773)
- ML20134M774 + (ML20134M774)
- ML20134M775 + (ML20134M775)
- ML20134M777 + (ML20134M777)
- ML20134M778 + (ML20134M778)
- RBG-21475, Responds to Open Item Noted in Insp Rept 50-458/85-50. Corrective Actions Deleted (Ref 10CFR2.790) + (ML20134M780)
- ML20134M781 + (ML20134M781)
- ML20134M782 + (ML20134M782)
- ML20134M783 + (ML20134M783)
- 05000498/LER-1997-002, :on 970115,safety Injection Sys Logic Circuitry Not Fully Tested by Surveillance Procedures.Caused by Unusual Logic Arrangement.Containment Sump Isolation Valves Have Been Tested + (ML20134M784)