ML20134M772
| ML20134M772 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 11/19/1996 |
| From: | Caldwell J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jeffery Wood CENTERIOR ENERGY |
| Shared Package | |
| ML20134M775 | List: |
| References | |
| EA-96-303, NUDOCS 9611260036 | |
| Download: ML20134M772 (3) | |
See also: IR 05000346/1996005
Text
.
. . ~ . . _ _ .
.
_
_ _ _ _ _ . _ . _._. _ _ _.-._._ ..
_ . _ _ _ _ _ . _
.
li.
i
//
Nhh
~0
l
l
November 19, 1996
i
i
,
!
Mr. John K. Wood
Vice President - Nuclear
Davis-Besse Nuclear Power Station
i
Centerior Service Company
5501 North State Route 2
,
Oak Harbor, OH 43449
i
SUBJECT:
.NRC INTEGRATED INSPECTION REPORT 50-346/96005 (DRP); NOTICE OF
VIOLATION
,
Dear Mr. Wood:
.
On August 14,1996, the NRC completed an inspection at your Davis-Besse site. 'The
'
enclosed report presents the results of that inspection.
i
l
In general, we noted that plant activities continued to be performed in a controlled,.
j
professional manner, utilizing a safety conscious approach. However, two violations of
NRC requirements were identified concerning issues initially reviewed during previous
!
. inspections.
l
The first of these involved failure of personnel to understand and adhere to a procedure
l .
designed to prevent unauthorized heavy loads from being transported over the open
reactor with fuelin the vessel. Ultimately, that failure coupled with weak
communications, resulted in a 9-ton load actually being lifted over the open reactor vessel.
The second violation involved station personnel failing to perform a timely safety
evaluation for the draining and abandonment of the Primary Water Storage Tank prior to
that activity occurring.
These violations are cited in the enclosed Notice of Violation, and the circumstances
surrounding the violations are described in detailin the enclosed report. Please note that
j
you are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
I
200010
i
%
3
9611260036 961119
ADOCK 05000346
G
ppg
g
-.
-
._
,
.-
--
. _ . .
-.
.--
- _
-
.
-
l
.
J. K. Wood
-2-
We are also concerned with the fact that training provided for control room operators in
l
support of a recent technical specification change was ineffective. This change required
l
that the volumes and boron conentrations for both boric acid addition tanks be considered
l
in the aggreate to verify complicence with the technical specifications. When question
about an apparent discrepancy in the concentrations control room operators were unable
l
to verify compliance (a reactor engineer did subsequently verify compliance).
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
/s/ John A. Grobe
James L. Caldwell, Acting Director
Division of Reactor Projects
Docket No.: 50-346; 72-14
Enclosures:
Inspection Report 50-346/96005 (DRP)
- See previous concurrence
Document name R:\\ Davis \\Dav96005.DRP
To receive a copy of this document, indicate in the box "C" = Copy without attach /enct
"E" = Copy with attach /enci "N" = No copy
0FFICE
DRS
EIC
NAME
Tongue /sn &
Creed
M
Kozak
M
Burgess
iM
DATE
9/
/96
9/
/96
9/
/96
9/
/96
0FFICE
M
i
NAME
LariksburMb
Caldwelldk
DATE
//p/ /7/96
//#/ d/96 /
OFFICIAL RECORD COPY
..
_ _ _
_ _ _ _ _ _
_.
. . . .
_ _ . . , _
_
_ _ _ .
_ _ _
J. K. Wood
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room
(PDR).
Sincerely,
!
!
' James L. Caldwell, Acting Director
Division of Reactor Projects
Docket Nos.:
50-346
l
l
Enclosures:
Inspection Report 50-346/96005
cc w/ encl:
J. P. Stetz, Senior Vice President - Nuclear
J. H. Lash, Plant Manager
.
J. L. Freels, Manager
l
Regulatory Affairs
State Liaison Officer, State
of Ohio
Robert E. Owen, Ohio
l
Department of Health
C. A. Glazer, State of Ohio,
'
Public Utilities Commission
Docket File w/ encl
DRP w/ encl
PUBLIC IE-01 w/ encl
RIII PRR w/ enc 1
OC/LFDCB w/ enc 1
CAA1 w/enci (e-mail)
SRI Davis-Besse w/ encl
W. L. Axelson w/ enc 1
Project Manager, NRR w/ encl
A. B. Beach, w/ enc 1
B. L. Burgess, w/ encl
Document name R:\\ Davis \\Dav96005.DRP
To receive a copy of this document, indicate in the box "C" = copy without
i
!
attach /enci
"E" = copy with attach /enci
"N" = No copy
b
b
N
EIC
. /,
0FFICE
8.
DRS _ 2
NAME
Tongue /snN#
CreedY
Kozak h
Burg
l
i
DATE
9/fD/96
9/N/96
9/ O /96
9/d/96
0FFICE
DRP
NAME
Lanksbury
Caldwell/Grobe
<
DATE
9/
/96
9/
/96
'
0FFICIAL RECORD COPY
-