ML20134M759

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-245/96-05, 50-336/96-05 & 50-423/96-05
ML20134M759
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 11/20/1996
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harpster T, Kenyon B
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 9611260033
Download: ML20134M759 (3)


See also: IR 05000245/1996005

Text

-

-

-

.

.

.

.-

.

..

s,.

.

4'

November 20, 1996

Mr. Bruce D. Kenyon

President and Chief Executive Officer

Northeast Nuclear Energy Company

c/o Terry Harpster

P. O. Box 128

)

. Waterford, Connecticut 06385-0128

SUBJECT:

MILLSTONE NUCLEAR POWER STATION, UNIT NO. 3, INSPECTION

REPORT NOS. 50-245/96-05; 50-336/96-05; 50-423/96-05

i

Dear Mr. Kenyon:

l

This letter refers to your September 16,1996 correspondence, in response to our August

15,1996 letter.

'

Thank you for informing us of the corrective and preventive actions documented in your

i

letter.- These actions will be examined during a future inspection of your licensed program.

Your cooperation with us is appreciated.

Sincerely,

ORIGINAL SIGNED BY:

Jacque P. Durr, Chief

Special Projects Office, RI

Docket Nos. 50 245; 50-336;50-423

cc:

T. C._Feigenbaum, Executive Vice President - Chief Nuclear Officer

J. McElwain, Unit 1 Recovery Officer

M. Bowling, Jr., Unit 2 Recovery Officer

J. Cowan, Unit 3 Recovery Officer

D. M. Goebel, Vice President, Nuclear Oversight

J. K. Thayer, Recovery Officer, Nuclear Engineering and Support

P. D. Hinnenkamp, Director, Unit Operations

H. F. Haynes, Director, Nuclear Training

P. M. Richardson, Nuclear Unit Director, Unit 2

M. H. Brothers, Nuclear Unit Director, Unit 3

J. F. Smith, Manager, Operator Training

F. C. Rothen, Vice President, Work Services

2,'

L. M. Cuoco, Esquire

i

2, G d. R. Egan, Esquire

'-

O28

\\

\\

9611260033 961120

PDR

ADOCK 05000245

G

PDR

e

-

.- .-

.

. . - . _ _ .

- . . . - - - . - . . . . . . .

. . - . - . . - . . . -

- - . . . . . . -

_ _ .

i

.

r

.

M.

~

i

..

.

]

Mr. Bruce D. Kenyon

2

j

- cc w/cv of Licensee's Resoonse Letter:

State of Connecticut SLO Designee

i

l.

V. Juliano, Waterford Library

,

{

S. B. Comley, We The People

-

J.' Buckingham, Department of Public Utility Control

1

,

!

4

I-

l

t

lt

t

i

i

.a

!

4

,

a

)

4

j

!

,

1

)

., .< .

l

.

Mr. Bruce D. Kenyon

3

Distribution w/cv of Licensee's Response Letter:

Region i Docket Room (with concurrences)

Nuclear Safety information Center (NSIC)

PUBLIC

NRC Resident inspector

M. Kalamon, SPO, RI

D. Screnci, PAO, RI

N. Sheehan, Field-PAO, RI

W. Dean, OEDO

P. McKee, Director, Deputy Director of Licensing, SPO, NRR

G. Imbro, Deputy Director of ICAVP Oversight, SPO, NRR

L. Plisco, Chief, SPO, NRR

l

V. Rooney, PM, SPO, NRR

D. Mcdonald, SPM, SPO, NRR

J. Anderson, PM, SPO, NRR

inspection Program Branch (IPAS)

<

l

1

DOCUMENT NAME: G:\\ BRANCH 6\\REPLYLTR\\96-05.RPY

To receive a copy of this document, indicate in the box: "C" = Copy without

attachment / enclosure

"E" = Copy with attachment / enclosure

"N" = No copy

OFFICE

Rl/SPO

Rl/SPO

/

/

NAME

Blumberg W

Durr FM-

DATE

11(M96 g

11#496

V

OFFICIAL RECORD COPY

T1m

_ _ . ~ - .~

..- .- -

--

- - - - - - - - - -

-

- - - -

-

.-

.

-

  • *

~

~

1

.,

.

.

.

..

L

i 7 s.ta.o ser c, s nio, cT 06037

>

'

- NdM

, .

- Utilities System

vonbe utaicie.s.rm. comp.oy

>

P.O. Box 270

,

H rtford, CT 061410270

(203) 665-5000

4

,

SEP161996

Docket No. 50-423

i

B15884

i

i

!

Re:10CFR2.201

!

'

,

U.S. Nuclear Regulatory Commission

)

i

Attention: Document Control Desk

Washington, D.C. 20555

e

J

Millstone Nuclear Power Station, Unit No. 3

4

h

. Reply to a Notice of Violation

insoection 50-245/96-05: 50-336/96-05: 50-423/96-05

.

In a letter dated August 15,1996,' the NRC transmitted the results of a safety

l

Inspection conducted at Millstone Station on May 7,1996 through June 26,1996. The

1

j

inspection concluded that certain of our activities appeared to be in violation of NRC

j

requirements. Specifically, Millstone Unit No 3 was cited for one violation for failure to

j

j

audit- Technical

Specification

(TS)

Section

6.8.4.e,

" Accident

Monitoring

j

instrumentation", within a five year period. This should have been performed during

Audit A223063, dated October 1994.

i

On behalf of Millstone Unit No. 3, Attachment 1 of this submittal provides Northeast

Nuclear Energy Company's (NNECO's) reply to the violation, pursuant to the provisions

of 10CFR2.201.

.l

J

j -

The following summarizes NNECO's commitments made within this letter:

.

4

4

B15884-01: Technical Specification section 6.8.4 ((a) through (e]) has been added to

j

the scope of the next scheduled Technical Specification Audit (A21073) to ensure that

j

this item is properly evaluated. The audit is scheduled to start on September 30,1996

i

and will be completed on October 31,1996.

i

3

B15884-02:

An evaluation of the audits of the Millstone Unit No. 3 Technical

Specifications since 1991 will be conducted to determine if all required sections have

been adequately audited. Audits will be performed of TS sections as required. This

review and follow-up corrective actions will be completed by October 31 for Millstone

l

'

Unit No. 3. A similar review of the audit program will be completed for Millstone Unit

Nos.1 and 2, and Connecticut Yankee. The reviews for Unit Nos.1 and 2 will be

a

5

I

NRC letter dated August 15,1996, "NRC Combined Inspection 50-245/96-05;

'

50-336/96-05; 50-423/96-05 and Notice of Violation," W. D. Lanning to T. C.

Feigenbaum,.

,_

WY2 i c lW'

t

- . --

- - - -

.- - .

. - - - .-

- - . _ .

..

-

-

.-

.-

i

-

-

.

.

.

.

U.S. Nuclaar Regulatory Commission

B15884\\Page 2

.

- completed prior to December 31, 1996.

The Connecticut Yankee review will be

completed prior to re-start from their current outage.

B15884-03: The process for the indeper. dent review of "The TS Audit Matrix" will be

revised to require a review of what "has been done" versus "what has been scheduled".

J

In the future, personnel will enter information into the tracking database after the audit

has been cumpleted and after the independent reviewer has checked "what has been

done". Procedure QAS 2.13 will be revised by October 31,1996.

j

- B15884-04: A root cause evaluation will be performed to address this violation, and

related deficiencies identified in the audit program. This root cause evaluation will be

completed by. October 31,1996.

Should you have any questions regarchig this, please contact Mr. William J. Temple at

(860)437-5904.

Very truly yours

NORTHEAST NUCLEAR ENERGY COMPANY

FOR: T. C. Felgenbaum

Executive Vice President and

Chief Nuclear Officer

BY:

(h

& E.Scae6

Vice President- Nuclear

l

cc:

H. J. Miller , Region 1 Administrator

V.L. Rooney, NRC Project Manager,' Millstone Unit No. 3

W. D. Lanning, Director Millstone Assessment Team

T. A. Eastick, Senior Resident inspector, Millstone Unit No.1

P. D. Swetland, Senior Resident inspector, Millstone Unit No. 2

A. C. Cerne, Senior Resident Inspector, Millstone Unit No. 3

'

W. J. Raymond, Senior Resident inspector, Connecticut Yankee

o

,

h

t

a

_

.

_

o

.

-

-

.

,,

,

,

--

-

,

.

Docket No. 50-423

B15884

Attachment 1

Millstone Nuclear Power Station, Unit No. 3

Reply to a Notice of Violation

Inspection 50-245/96-05; 50-336/96-05; 50-423/96-05

i

l

y

1

]

September 1996

j

c(

<

_ _ .

_ _ _

_

_ _ -.._ __ _ _

._ _ _ _.___ ._ . . _ _. _ . _ -

t

..

.-

_

-

-

.

,

,

.

U.S. Nuclear Regulatory Commission

'

B15884\\ Attachment 1\\Page 1

1

-

i

f

Restatement of Violation

i

Unit No. 3 Technical Specification (TS) 6.5.3.7, requires, in part, that Nuclear Safety

L

Assessment Board audits shall be performed at least once per 24 months in

[

accordance with Nuclear Group Procedures (NGP) snd shall encompass the

l

conformance of unit operation to provisions contained within the techaical

specifications and applicable license conditions. Procedure NGP 2.02, " Nuclear Safety

'

j

Assessment Board", requires that over a five year period, all items contained within TS

sections will be audited.

Contrary to the above, TS section 6.8.4.e, " Accident

.

Monitoring Instrumentation," was not audited within a five year period.

'

This is a Severity Level IV Violation (Supplement I)

!

![

Reason for the Violation

j

NNECO agrees with this violation which was identified by the NRC in that section

6.8.4.e of the Millstone Unit No. 3 TS was not audited during the past five years. In

j

addition, our investigation of the violation identified that none of the sections of 6.8.4.

l

((a) through (e]) were audited during the past five years.

!

The investigation determined that the following causes contributed to this violati-on:

c

l

1.

Ineffective Communication

The Audit Team Leader (ATL) did not clearly communicate that the Technical

3

Specialist was responsible for evaluating all sections of TS 6.8.4.

The

1

i

investigation determined that the ATL was properly trained and understood the

i

!

requirements of the audit process (QAS procedure 2.13, " Planning, Scheduling,

.

l'

Performance, Reporting, and Follow-up.of Assessment Services Audits"), but

)

!

failed to advise the Technical Specialist of his responsibility.

j

'i

2.

Inadeauste Review of the Audit Packaae/ inattention to Detail

The Audit Team Leader did not ensure completion of the audit checklist

.

!

performed by the Technical Specialist. The ATL is responsible for ensuring that

all portions of the checklist are completed and that justification is provided for

.

i

those portions of the checklist which were not evaluated. The checklist item for

TS 6.8.4 was not completed and no justification was provided for the lack of

objective evidence as required by the audit procedure. The investigation verified'

[(

,

l

that the ATL was knowledgeable of his responsibilities.

!

$

'

j

3.

Ineffective Audit Trackina Process

,

i

The TS Audit Tracking process is used to schedule required areas for TS audits.

1

TS sections required to be audited are entered in a tracking program with the

audit number and audit schedule start date prior to the actual start of the audit.

,

This information is not updated with actual audit information. The output from

.-

- . - .

.

_

.

.

.

--

-

i

.,

.

p;.,'

-

-

U.S. Nuclear Regulatory Commission

'

.;

..~

B15884\\ Attachment 1\\Page 2

the program, "The TS Audit Matrix," does not provide the actual start date of the -

audit or what was actually audited.

o

4.

Inadeauate Corrective Action From Unresolved item (URI 423/94-01-05.

Adeauacy of Technical Specification Audits - Unit No. 3)

To prevent recurrence of missing'TS sections required to be audited, NU

committed to having a technical reviewer independently review "The TS Audit

Matrix" to ensure TS sections are audited on the required frequency. This

. review verifies that all TS sections are being appropriately scheduled for audit.

However, as discussed above this process does not provide assurance that the

]

TS sections are actually audited. The investigation determined this corrective

action to be ineffective in preventing recurrence of the problem since it did not

properly address the causal factors associated with the violation (i.e., problems

with implementation of the TS Audit Matrix and personnel error)

Corrective Steps Taken and Results Achieved:

,

l

Technical Specification section 6.8.4 has been added to the schedule of the next

.

Technical Specification Audit (A21073) to ensure that .this item is properly

evaluated. The audit is scheduled to start on September 30, 1996 and will be

completed by October 31,1996.

The Audit Team Leader was counseled on the importance of effective

.

communication of audit assignments to the Technical Specialist during the

1

performance of an audit. In addition, the lessons learned from this event were

i

shared with the audit group regarding the audit procedure, management

expectations, their responsibilities and authority, and the importance of adhering to

procedural and regulatory commitments.

Corrective Steps That Will Be Taken to Avoid Further Violations:

An evaluation of the audits of the Millstone Unit No. 3 Technical Specifications

.

,

since 1991 will be conducted to determine if all required sections have been

adequately audited. Audits will be performed of TS sections as required. This

review and audit will be completed prior to the re-start of Millstone Unit No. 3. A

similar review of the audit program will be completed for Millstone Unit Nos.1 and 2

and Connecticut Yankee. The reviews for Units 1 and 2 will be completed prior to

'

December 31,1996. The Connecticut Yankee review will be completed prior to re-

start from their current outage.

The process for the independent review of "The TS Audit Matrix" will be revised to

require a review of what "has been done" versus "what has been scheduled." In the

future, personnel will enter information into the tracking database after the audit has

.--

-

-.

. ,

.

, ,

.

-

. .

-

U.S. Nucinar Regulatory Commission

.

B15884\\ Attachment 1\\Page 3

'

been completed and after the independent reviewer has checked "what has been

done". Procedure QAS 2.13 will be revised by October 31,1996.

Initiatives are underway to improve Millstone's corrective action program which will

.

result in improved root cause determinations and corrective actions to prevent

recurrence of the issue.

Of specific note, root cause evaluations are being

performed for notices of violation. A root cause evaluation was added to the

requirements for follow-up of this violation. The evaluation will address the violation

and related deficiencies identified in the audit program. This will be completed by

October 31,1996.

Northeast Utilities is performing an evaluation of the current method of performing

Technical Specification audits to determine the value of a performance based

auditing approach versus the current line item compliance based approach. It is

expected that this evaluation will be completed by December 31,1996.

'

}

Date When Full Compliance Will Be Achieved:

.

Millstone Unit No. 3 will be in full compliance by October 31,1996 after TS section

j

6.8.4 is audited during the next Technical Specification Audit.

h

4

i

Y

g

.

?