Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134H511 + (ML20134H511)
- ML20134H513 + (ML20134H513)
- ML20134H514 + (ML20134H514)
- ML20134H517 + (ML20134H517)
- ML20134H518 + (ML20134H518)
- ST-HL-AE-5506, Responds to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves + (ML20134H519)
- ML20134H521 + (ML20134H521)
- ML20134H522 + (ML20134H522)
- 05000424/LER-1997-001, :on 970109,thermal Overload Bypass Jumper Connection Rendered ECCS Valve Inoperable.Caused by Cognitive Personnel Error.Electricians Involved Counseled + (ML20134H523)
- ML20134H526 + (ML20134H526)
- ML20134H527 + (ML20134H527)
- ML20134H529 + (ML20134H529)
- ML20134H531 + (ML20134H531)
- U-600241, Forwards Response to 850712 Request for Addl Info to Resolve Followup Items Re Effects of Valve Flexibility in Dynamic Piping Analysis Resulting from Independent Design Review + (ML20134H532)
- ML20134H533 + (ML20134H533)
- B11671, Forwards Response to 850813 Request for Addl Info Re Encl marked-up Draft Tech Specs.Meeting to Resolve Disagreement Re Inclusion of Lists of Design Info or Equipment Requested + (ML20134H535)
- ML20134H536 + (ML20134H536)
- ML20134H537 + (ML20134H537)
- ML20134H538 + (ML20134H538)
- 05000266/LER-1997-001, :on 970108,safety Injection Delay Times Exceeded Design Basis Values.Caused by Degraded Voltage Conditions.Licensee Engineers Will Prepare FSAR Change Requests to Reflect LBLOCA Evaluation + (ML20134H539)
- ML20134H540 + (ML20134H540)
- 05000266/LER-1997-002, :on 970109,potential to Overpressurize Piping Between Containment Isolation Valves Occurred.Caused by Original Design Not Providing Overpressure Protection for Piping.Review Completed + (ML20134H541)
- ML20134H542 + (ML20134H542)
- ML20134H543 + (ML20134H543)
- ML20134H544 + (ML20134H544)
- ML20134H545 + (ML20134H545)
- 3F0297-01, Responds to Requesting Info Re Configuration Control Processes at Plant & Whether Configuration Conforms W/Design Bases + (ML20134H546)
- ML20134H547 + (ML20134H547)
- BVY-96-140, Advises to Remove J Thayer from List of Recipients of NRC Correspondence & to Add Re Mccullough.Addresses,Listed + (ML20134H550)
- ML20134H552 + (ML20134H552)
- ML20134H553 + (ML20134H553)
- ML20134H554 + (ML20134H554)
- ML20134H555 + (ML20134H555)
- ML20134H556 + (ML20134H556)
- ML20134H557 + (ML20134H557)
- ML20134H558 + (ML20134H558)
- ML20134H559 + (ML20134H559)
- ML20134H561 + (ML20134H561)
- HL-1537, Informs That Licensee Wishes to Withdraw Request to Revise Plant Units 1 & 2 TS Submitted by Ltr + (ML20134H563)
- ML20134H564 + (ML20134H564)
- ML20134H565 + (ML20134H565)
- ML20134H568 + (ML20134H568)
- ML20134H569 + (ML20134H569)
- ML20134H570 + (ML20134H570)
- ML20134H573 + (ML20134H573)
- 05000309/LER-1996-031, :on 961009,plant Trip During Reactor Protection Sys Surveillance Occurred.Cause Has Not Been Determined.Ac Logic Matrix Components Were Undergoing Testing at Time of Trip Were Replaced + (ML20134H574)
- ML20134H576 + (ML20134H576)
- ML20134H577 + (ML20134H577)
- ML20134H579 + (ML20134H579)
- ML20134H580 + (ML20134H580)
- ML20134H581 + (ML20134H581)