Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BVY-96-136, Advises That Results of Evaluation Will Be Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, within 120 Days + (ML20134F212)
- ML20134F214 + (ML20134F214)
- ML20134F215 + (ML20134F215)
- ML20134F216 + (ML20134F216)
- ML20134F217 + (ML20134F217)
- ML20134F218 + (ML20134F218)
- ML20134F219 + (ML20134F219)
- ML20134F220 + (ML20134F220)
- BVY-96-133, Informs NRC of Addl App R Compensatory Measures + (ML20134F221)
- TXX-4532, Interim Deficiency Rept SDAR-187 Re Deviation from FSAR Criteria in Steam Generator Design.Initially Reported on 850719.Evaluation Continuing & Completion Anticipated by 851122 + (ML20134F223)
- ML20134F226 + (ML20134F226)
- 05000249/LER-1984-005-03, :on 840716,during Unit Shutdown for Turbine Repair,Lpci Submarine Door Found Open.Caused by Personnel Error.Doors Secured W/Locking Bar to Prevent Handle Operation + (ML20134F230)
- U-602655, Responds to NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs + (ML20134F231)
- ML20134F233 + (ML20134F233)
- ML20134F235 + (ML20134F235)
- ML20134F236 + (ML20134F236)
- ML20134F238 + (ML20134F238)
- LIC-96-0164, Advises That Requested Info Will Be Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, within 120 Days + (ML20134F240)
- ML20134F241 + (ML20134F241)
- ML20134F242 + (ML20134F242)
- ML20134F243 + (ML20134F243)
- 05000327/LER-1985-030-01, :on 850721,ESF Actuations for Auxiliary Feedwater Pump Start Occurred Due to Loss of Both Main Feed Pumps & hi-hi Level in Generator Loop 4.Caused by Failed Condensate Dump Back Valve + (ML20134F244)
- ML20134F245 + (ML20134F245)
- ML20134F246 + (ML20134F246)
- ML20134F247 + (ML20134F247)
- ML20134F248 + (ML20134F248)
- NRC-97-0003, Responds to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions + (ML20134F249)
- ML20134F250 + (ML20134F250)
- ML20134F252 + (ML20134F252)
- ML20134F253 + (ML20134F253)
- ML20134F254 + (ML20134F254)
- ML20134F255 + (ML20134F255)
- ML20134F256 + (ML20134F256)
- ML20134F257 + (ML20134F257)
- ML20134F258 + (ML20134F258)
- RBG-43665, Provides Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions + (ML20134F259)
- ML20134F261 + (ML20134F261)
- ML20134F262 + (ML20134F262)
- ML20134F263 + (ML20134F263)
- PY-CEI-NRR-2106, Responds to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions + (ML20134F264)
- ML20134F265 + (ML20134F265)
- B16158, Provides 120-day Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions + (ML20134F266)
- ML20134F268 + (ML20134F268)
- 05000395/LER-1996-007, :on 960730,determined That Itt Barton Model 763 Pressure Transmitters Safety Hazard After Previous Failures. Caused by Loose Strain Gauge Lead.Devices Returned for Analytical Testing.Also Reportable Per Part 21 + (ML20134F269)
- B15976, Responds to RAI Re Licensed Operator Ffd.Personnel & Medical Info for Operator Encl.Encl Withheld Per 10CFR2.790 + (ML20134F270)
- ML20134F272 + (ML20134F272)
- BSEP-97-0024, Responds to RAI Re Rev to TS 3.0 & 4.0 Bases on Applicability & Surveillance Requirements,Per Guidance in GL 87-09 & NUREG-1433 + (ML20134F273)
- ML20134F274 + (ML20134F274)
- ML20134F275 + (ML20134F275)
- ML20134F280 + (ML20134F280)
- HL-5254, Advises That Modified Program & Testing Schedule Will Be Submitted to NRC Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves, within 180 Days + (ML20134F281)