._..__m Entirgy Optr:tions,Inc.
i"CCC" PO. Box 756 s
Port Gibson, MS 39150 Tel 601437 6408 Fax 601437 2795 Joseph J. Hagan Vice President Operanons Grand Gott Naclear Station i
October 29, 1996 i
U.S. Nuclear Regulatory Commission Mail Station P1-37 l
Washington, D.C.
20555 Attention:
Document Control Desk
Subject:
Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29 Required 30 Day Response To NRC Generic Letter 96-06 l
GNRO-9 6/ 00122 Gentlemen:
NRC Generic Letter 96-06 requires each addressee to j
submit a written response on or before October 30, 1996 indicating (1) whether or not the requested actions will be completed, (2) whether or not the requested information will be submitted and (3) whether or not the requested information will be submitted within the requested time period.
The purpose of this letter is to inform you that Grand Gulf Nuclear Station will determine if containment air cooler cooling water systems are susceptible to either waterhammer or two-phase flow conditions during postulated accident conditions; and if piping systems that penetrate the containment are susceptible to thermal expansion of fluid so that overpressurization of piping could occur.
If any systems are found to be susceptible h
to any of these conditions, Grand Gulf Nuclear Station j (3')
f will assess the operability of affected systems and take 9611050005 961029 PDR ADOCK 05000416:
P PDR
a f.
October 29, 1996 GNRO-96/ 00122 l
Page 2 of 4 l
i corrective action as appropriate in accordance with the requirements stated in 10 CFR Part 50 Appendix B and as required by the plant Technical Specifications.
In addition, on or before January 28, 1997, Grand Gulf l
Nuclear Station will submit a written summary report stating actions taken in response to the requested actions, conclusions that were reached relative to l
susceptibility of waterhammer and two-phase flow in the containment air cooler cooling water system and l
overpressurization of piping that penetrates containment, j
the basis for continued operability of affected systems j
and components as applicable, and corrective actions that j
were implemented or are planned to be implemented.
If systems are found to be susceptible to the conditions l
described in GL 96-06, Grand Gulf Nuclear Station will l
identify the affected systems and describe the specific l
circumstances involved.
1 l
Please feel free to contact Wayne Russell at (601) 437-2717 should you have any questions or require additional in forr.ation.
Yours truly, l
JJH/ WAR /amb attachment Affirmation cc:
(See Next Page) l-
l.
l October 29, 1996 GNRO-96/00122 Page 3 of 4 l
l l
cc:
Ms. S. C. Black (w/a) (NRC/NRR)
Mr. A. Heymer (w/a) l Mr. R. B. McGehee (w/a) l Mr. N.
S.
Reynolds (w/a)
Mr.
J.
E. Tedrow (w/a)
Mr. H. L. Thomas (w/o)
Mr. J. W. Yelverton (t1/a)
Mr.
L.
J. Callan (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 l
Arlington, TX 76011 Mr.
T.
B.
Gwynn l
Director, Division of Reactor Safety U.S. Nuclear Regulatory Commission l
Region IV l
611 Ryan Plaza Drive, Suite 400 l
Arlington, TX 76011 Mr.
J. N. Donohew, Project Manager (w/2) i Office of Nuclear Reactor Regulation j
U.S. Nuclear Regulatory Commission l-Mail Stop 13H3 Washington, D.C.
20555 L
Mr.
A.
C. Thadani Associate Director for Technical Assessment Office of Nuclear Reactor Regulation U.S.
Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C.
20555 4
l I
l
- ~
1i.
BEFORE THE
" UNITED STATES NUCLEAR REGULATORY COMMISSION LICENSE NO. NPF-29 I
' DOCKET NO. 50-416 4
IN.THE MATTER OF MISSISSIPPI POWER & LIGHT COMPANY and SYSTEM ENERGY RESOURCES, INC.
and SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION and l
ENTERGY OPERATIONS, INC.
+
l AFFIRMATION l
I I
I l
I, J.
J. Hagan, being duly sworn, state that I am Vice l
President, Operations GGNS of Entergy Operations, Inc.; that on behalf of Entergy Operations, Inc., System Energy j
Resources, Inc., and South Mississippi Electric Power l
Association I am authorized by Entergy Operations, Inc. to
(
sign and file with the Nuclear Regulatory Commission, this response to Generic Letter No. 96-06; that I signed this
(
response as Vice President, Operations GGNS of Entergy
' Operations, Inc.; and that the statements made and the matters set forth therein are true and correct to the best of
)
my knowledge, information and belief.
he J.}Hagan J.
STATE OF MISSISSIPPI i
i COUNTY OF WARREN SUBSCRIBED AND SWORN TO before me, a Notary Public, in and fo3 the County and State above named, this Ok@
day of WM%
1996.
.. _ - ~.
l (SEAL) l 2
Moha s
Notary Pubiic I
My commission expires: