Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134A204 + (ML20134A204)
- ML20134A205 + (ML20134A205)
- ML20134A208 + (ML20134A208)
- B11815, Forwards Response to NRC Request for Addl Info on SER Confirmatory Item 58 Re Emergency Diesel Generator Fuel Oil Storage & Transfer Sys + (ML20134A210)
- B11814, Forwards Revised Deviation Request from Branch Technical Position Cmeb 9.5-1 Re Auxiliary Bldg - Separation Criteria, Per SER Open Item 14.3 on Safe Shutdown Capability + (ML20134A211)
- ML20134A212 + (ML20134A212)
- ML20134A215 + (ML20134A215)
- ML20134A216 + (ML20134A216)
- ML20134A217 + (ML20134A217)
- ML20134A219 + (ML20134A219)
- ST-HL-AE-1487, Responds to Draft SER or FSAR Item Re Question 430.16N Concerning Breaker Coordination Drawings.Drawings Will Not Be Incorporated in FSAR + (ML20134A221)
- ML20134A222 + (ML20134A222)
- ST-HL-AE-1422, Forwards Response to Draft Ser/Fsar Items Re Section 3.11 Concerning Environ Design of Mechanical & Electrical Equipment.Encl marked-up FSAR Pages Will Be Incorporated in Future FSAR Amend + (ML20134A224)
- BSEP-85-1869, Suppls Response to Violations Noted in Insp Repts 50-324/85-19,50-325/85-19,50-324/85-22 & 50-325/85-22. Corrective Actions:Loose/Missing Bolts Investigated & Trouble Tickets Written + (ML20134A225)
- TXX-4527, Submits Results of Study to Verify Proper Coordination & Selective Tripping of Breakers & Fuses Required for Safe Shutdown Circuits & Power Supplies in Response to NRC Question 010.33.Summary of Findings Provided + (ML20134A226)
- ML20134A228 + (ML20134A228)
- ML20134A229 + (ML20134A229)
- ML20134A232 + (ML20134A232)
- ML20134A233 + (ML20134A233)
- ML20134A234 + (ML20134A234)
- ML20134A235 + (ML20134A235)
- ML20134A237 + (ML20134A237)
- U-600206, Forwards Results of Analysis of Unresolved Item 85016-07 Re Central File Storage Facility Developed During 850726 Exit Meeting.Detailed Schedule for Completion of Corrective Actions Will Be Forwarded by 850815 + (ML20134A238)
- ML20134A239 + (ML20134A239)
- IR 05000321/1985027 + (ML20134A240)
- ML20134A241 + (ML20134A241)
- ML20134A244 + (ML20134A244)
- ML20134A247 + (ML20134A247)
- ML20134A252 + (ML20134A252)
- ML20134A254 + (ML20134A254)
- ML20134A256 + (ML20134A256)
- ML20134A259 + (ML20134A259)
- ML20134A261 + (ML20134A261)
- ML20134A263 + (ML20134A263)
- ML20134A265 + (ML20134A265)
- ML20134A267 + (ML20134A267)
- ML20134A271 + (ML20134A271)
- ML20134A273 + (ML20134A273)
- B11805, Forwards Reviews of Integrated Safety Assessment Program Topics 1.43 Re Water hammer,1.44 Re Asymmetric Blowdown Loads on Reactor Sys & 1.48 Re Safety Factor for Penetration X-10A + (ML20134A275)
- BSEP-85-1844, Responds to Violations Noted in Insp Repts 50-324/85-27 & 50-325/85-27.Corrective Actions:Mechanical Maint Planner/ Analysts Instructed to Use All Available Refs to Assure Correct Spare Bolts Identified + (ML20134A278)
- AECM-85-0337, Responds to NRC Re Violations Noted in Insp Rept 50-416/85-27.Corrective Actions:Administrative Procedure 01-S-07-3, Calibr & Control of Measuring & Test Equipment, Will Be Revised by 851115 + (ML20134A279)
- 05000327/LER-1985-029-01, :on 850719,trip Occurred on lo-lo Steam Generator Level in Loop 3.Caused by Power Loss to Feedwater Pump When Attempting to Transfer Power from Electrical Board.Operators Made Aware of Problems + (ML20134A282)
- ML20134A283 + (ML20134A283)
- ML20134A284 + (ML20134A284)
- ML20134A285 + (ML20134A285)
- IR 05000244/1985020 + (ML20134A288)
- ML20134A289 + (ML20134A289)
- ML20134A292 + (ML20134A292)
- ML20134A294 + (ML20134A294)
- ML20134A295 + (ML20134A295)
- PNO-II-85-100, on 851024,480-volt Circuit Breaker or Associated Components for One Battery Room Exhaust Ventilation Fan Failed,Causing Trip of Another Breaker. Plant Gradually Shut Down + (ML20134A298)