Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133Q144 + (ML20133Q144)
- ML20133Q145 + (ML20133Q145)
- ML20133Q146 + (ML20133Q146)
- ML20133Q147 + (ML20133Q147)
- ML20133Q148 + (ML20133Q148)
- ML20133Q150 + (ML20133Q150)
- ML20133Q152 + (ML20133Q152)
- IA-85-223, Responds to FOIA Request for Successful Proposal & Contract Re Request for Proposal RS-ORM-84-397, OIP Requirements Study. App a Document Encl.Document & Contract Also Available in PDR + (ML20133Q152)
- ML20133Q153 + (ML20133Q153)
- ML20133Q154 + (ML20133Q154)
- ML20133Q155 + (ML20133Q155)
- ML20133Q156 + (ML20133Q156)
- ML20133Q158 + (ML20133Q158)
- ML20133Q159 + (ML20133Q159)
- ML20133Q160 + (ML20133Q160)
- ML20133Q161 + (ML20133Q161)
- ML20133Q162 + (ML20133Q162)
- ML20133Q164 + (ML20133Q164)
- ML20133Q165 + (ML20133Q165)
- IR 05000423/1985030 + (ML20133Q166)
- ML20133Q167 + (ML20133Q167)
- 05000416/LER-1985-028, :on 850717,diesel Generator Tripped.Plant Shutdown Initiated.Caused by Failed Generator Bearing. Bearing Replaced.Generator Returned to Svc Prior to Required Shutdown + (ML20133Q168)
- ML20133Q169 + (ML20133Q169)
- ML20133Q170 + (ML20133Q170)
- ML20133Q171 + (ML20133Q171)
- ML20133Q172 + (ML20133Q172)
- IR 05000424/1985033 + (ML20133Q173)
- ML20133Q174 + (ML20133Q174)
- ML20133Q175 + (ML20133Q175)
- ML20133Q176 + (ML20133Q176)
- ML20133Q177 + (ML20133Q177)
- ML20133Q178 + (ML20133Q178)
- ML20133Q179 + (ML20133Q179)
- ML20133Q180 + (ML20133Q180)
- ML20133Q182 + (ML20133Q182)
- PNO-III-85-067A, on 850809,licensee Will Resume Low Power Testing.Region III Approved Util Corrective Action Program Submitted on 850807,in Response to 850702 Premature Criticality.Plant Still Restricted to 5% Power + (ML20133Q183)
- ML20133Q184 + (ML20133Q184)
- ML20133Q185 + (ML20133Q185)
- IA-84-430, Further Response to FOIA Request for Documents Re Charleston Earthquake of 1886 & Seismic Design for Vogtle. Documents 1 & 2 Available in Pdr.Document 3 Encl + (ML20133Q185)
- ML20133Q186 + (ML20133Q186)
- 05000528/LER-1985-045, :on 850703,insp & Tests of ASME Code Class Component Not Reviewed within 96 H.Caused by Failure to Keep Engineers Appraised of Testing.Engineers Now Placed on Distribution List for Test Schedules + (ML20133Q187)
- ML20133Q188 + (ML20133Q188)
- ML20133Q189 + (ML20133Q189)
- ML20133Q190 + (ML20133Q190)
- ML20133Q191 + (ML20133Q191)
- ML20133Q192 + (ML20133Q192)
- ML20133Q193 + (ML20133Q193)
- 05000341/LER-1985-035, :on 850709,reactor Scram Occurred Due to Actual Reactor Water Level 3 Condition.Caused by Operator Not Recognizing Water Level Decrease & Failing to Respond to Alarm.Shift Supervisors Counseled + (ML20133Q194)
- ML20133Q195 + (ML20133Q195)
- ML20133Q196 + (ML20133Q196)
- RBG-21-389, Submits Schedule for Compliance W/Hydrogen Control Owners Group Hydrogen Control Plan (Ref 10CFR50.44(c)(3)(vii)).List of Equipment Required to Survive Hydrogen Burn & Preliminary Equipment Survivability Analysis to Be Submitted by 850701 + (ML20133Q197)