MONTHYEARML20210H6271999-07-29029 July 1999 Summary of 990622 Meeting with EOI Re NRC Briefing by RBS on Issues Associated with Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees Provided ML20205D4831999-03-25025 March 1999 Summary of 990222 Public Hearing with Util Re Gathering Addl Info Related to Two Petitions Filed Pursuant to 10CFR2.206 by Ucs Re Operation of River Bend Station & Perry Nuclear Power Plant.List of Attendees & Transcript of Hearing Encl ML20198G5501998-12-18018 December 1998 Summary of 981201-02 Workshop with Entergy Operations,Inc in Taft,La Re Licensing Processes,Licensing Submittals & Other Topics That May Affect Licensing Processes & Submittals. Copy of Slides Presented During Workshop Encl ML20155H3931998-11-0202 November 1998 Summary of 981007 Meeting with Util Re Review Status of Standard Quality Assurance Manual for All Util Sites.List of Meeting Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20151X0011998-09-10010 September 1998 Summary of 980827 Meeting W/Util to Discuss Status of Review of Std QA Manual.List of Attendees Encl ML20236M0501998-07-0808 July 1998 Summary of 980702 Meeting W/Entergy Operations,Inc to Discuss Review Status of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20217K3461998-04-24024 April 1998 Summary of 980401 Meeting W/Entergy Operations,Inc Re Licensing Issues & Regulatory Performance Efficiencies.List of Attendees & Agenda for Meeting Encl ML20217K5141998-04-24024 April 1998 Summary of 980416 Meeting W/Entergy Corp Re Standardization of site-specific Security Plans.List of Meeting Attendees & Agenda for Meeting Encl ML20217F4811998-03-26026 March 1998 Summary of 980319 Meeting W/Licensee to Discuss Status of Development of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20203B5741998-02-11011 February 1998 Summary of 980122 Meeting W/Entergy in Rockville,Maryland Re Licensing Issues & Standardization of Licensing Documents. List of Meeting Attendees & Meeting Agenda Encl ML20212G8521997-10-29029 October 1997 Summary of 971022 Meeting W/Entergy Svcs,Inc Re Development & Implementation of Common or Std QAP for All Sites.List of Meeting Attendees & Viewgraphs Encl ML20148F0391997-05-30030 May 1997 Summary of 970521 Meeting W/Entergy Operations,Inc Re Proposed Removal of MSL Lcs,Removal of Pvlc Sys & Increase of MSIV Leakage Requirements in TS ML20140C1681997-03-28028 March 1997 Summary of 970313 Meeting W/Entergy Operations,Inc to Discuss Proposed ECCS Suction Strainer Mod.List of Attendees & ECCS Suction Strainer Mod Encl ML20149M3611996-12-11011 December 1996 Summary of 96111 Meeting W/Licensee in Rockville,Md to Discuss Comments Developed in Response to NRC Advance Notice of Proposed Rulemaking on Financial Assurance Requirements for Decommissioning Nuclear Reactors.List of Attendees Encl ML20134M6611996-11-21021 November 1996 Summary of 961114 Meeting W/Listed Licensees in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSARs for Four Nuclear Reactor Sites.List of Attendees & Licensee Handout Encl ML20056C5251993-06-18018 June 1993 Summary of 930513 Meeting W/Util Re Changes to Security & Response Plans.Meeting Agenda & List of Attendees Encl ML20059C7421993-03-0202 March 1993 Summary of 392nd ACRS Meeting on 921209-11 in Bethesda,Md Re SBO Rule,Ts Improvement Program,Advanced BWR Design,River Bend Nuclear Plant Reliability Monitoring Program & Generic Issue 120,online Testability of Protection Sys ML20055G8611990-07-18018 July 1990 Summary of 900712 Meeting W/Util Re Reload Design Methods. List of Attendees Encl ML20055F0941990-07-10010 July 1990 Summary of 900620 Meeting W/Util Re Proposed License Amends, Including Removal of Snubber Requirements from Tech Specs for Relocation Into Inservice Insp Program & Util Responses to Generic Ltrs 88-01 & 87-09 ML20246B6901989-08-0101 August 1989 Summary of 890727 Meeting W/Util in Arlington,Tx Re Plant Security Enhancement Program & Personnel Changes ML20205A7431988-10-12012 October 1988 Summary of 880928 Meeting W/Util Re 880825 Reactor Trip & Followup Actions by Licensee.Viewgraphs Encl ML20153G6331988-08-30030 August 1988 Summary of Operating Reactor Events Meeting 88-35 on 880830, Including Summary of Reactor Scrams for Wk Ending 880828. Significant Event Identified for Input to NRC Performenance Indicator Program ML20151Z7921988-08-25025 August 1988 Summary of 880817 Meeting W/Util in Rockville,Md Re Util 5-yr Business Plan to Improve Safety & to Reduce Operating Costs at Plant.List of Attendees & Handouts Encl ML20151Z4211988-08-25025 August 1988 Summary of 880818 Meeting W/Util in Rockville,Md Re License Amend Application to Permit Performance of Leak Rate Tests of Containment Isolation Valves in Parallel W/Refueling Operations ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20151R8701988-08-0505 August 1988 Summary of 880726 Meeting W/Util in Arlington,Tx Re 5-yr Business Plan.Handouts Encl ML20154J4061988-05-17017 May 1988 Summary of 880414 Meeting W/Representatives & Contractors of Licensee in Rockville,Md Re 870605 Amend Application for Util.Highlights of Discussion Listed.Nrc Indicated That Request for Addl Info Would Be Prepared If Needed ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20147C8041988-01-0606 January 1988 Summary of 871215 & 16 Meetings W/Util in St Francisville,La Re Questions & Comments Resulting from Review of Inservice Testing Program.Inel Trip Rept,List of Attendees & Questions & Comments Encl ML20147C8201987-12-28028 December 1987 Trip Rept of 871215-16 Site Visit to Discuss Pump & Valve Inservice Testing Program ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20235M9151987-07-19019 July 1987 Summary of 870615 Meeting W/Util in Bethesda,Md Re Revs to Util Emergency Operating Procedures & to Satisfy Sser Requirement.Attendee List Encl ML20214A2151987-05-13013 May 1987 Summary of 870508 Meeting W/Util & GE Re Licensee Plans for Fuel Reload.List of Attendees & Meeting Viewgraphs Encl ML20215L3281987-05-0505 May 1987 Summary of Operating Reactors Events Meeting 87-11 on 870420.List of Attendees,Viewgraphs & Input to NRC Performance Indicator Program Encl ML20212Q9681987-04-21021 April 1987 Summary of 870217 Meeting W/Util to Discuss Issues Re Containment Vending,Reg Guide 1.97,TDI Diesels,Util Plans for First Refueling Outage,Engineering Expertise on Shift, UHS Monitor & OL Amends ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20207E2811986-07-16016 July 1986 Summary of Operating Reactors Events Meeting 86-24 on 860714 Re Events Occurring Since 860707 Meeting ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20206G6571986-06-10010 June 1986 Summary of 860529 Meeting W/Util Re Licensing Priorities & Matters Associated W/Forthcoming Transition of Util from Startup Test to Commercial Operation.Attendees List & Viewgraphs Encl ML20211G9361986-06-0606 June 1986 Summary of Operating Reactor Events Meeting 86-18 on 860602 Re Events Occurring Since 860519 Meeting.Attendee List, Events,Significant Elements of Events & Completion Dates for Assignments Encl ML20210R8471986-05-13013 May 1986 Summary of Operating Reactors Events Meeting 86-16 on 860512 Re Events Occurring Since Last Meeting.List of Attendees & Related Info Encl ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20197F7721986-05-0808 May 1986 Summary of Operating Reactors Events Meeting 86-15 on 860505.List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20203M9431986-04-25025 April 1986 Summary of Operating Reactors Events Meeting 86-13 on 860421 Re Events Occurring Since 860414 Meeting.Attendance List, Viewgraphs & Supporting Documentation Encl ML20141G2901986-04-0707 April 1986 Summary of 860313 Meeting W/Mark III Containment Hydrogen Control Owners Group in Bethesda,Md Re Heat Loss Analysis. List of Attendees,Handout & Viewgraphs Encl ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl 1999-07-29
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20210H6271999-07-29029 July 1999 Summary of 990622 Meeting with EOI Re NRC Briefing by RBS on Issues Associated with Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees Provided ML20205D4831999-03-25025 March 1999 Summary of 990222 Public Hearing with Util Re Gathering Addl Info Related to Two Petitions Filed Pursuant to 10CFR2.206 by Ucs Re Operation of River Bend Station & Perry Nuclear Power Plant.List of Attendees & Transcript of Hearing Encl ML20198G5501998-12-18018 December 1998 Summary of 981201-02 Workshop with Entergy Operations,Inc in Taft,La Re Licensing Processes,Licensing Submittals & Other Topics That May Affect Licensing Processes & Submittals. Copy of Slides Presented During Workshop Encl ML20155H3931998-11-0202 November 1998 Summary of 981007 Meeting with Util Re Review Status of Standard Quality Assurance Manual for All Util Sites.List of Meeting Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20151X0011998-09-10010 September 1998 Summary of 980827 Meeting W/Util to Discuss Status of Review of Std QA Manual.List of Attendees Encl ML20236M0501998-07-0808 July 1998 Summary of 980702 Meeting W/Entergy Operations,Inc to Discuss Review Status of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20217K3461998-04-24024 April 1998 Summary of 980401 Meeting W/Entergy Operations,Inc Re Licensing Issues & Regulatory Performance Efficiencies.List of Attendees & Agenda for Meeting Encl ML20217K5141998-04-24024 April 1998 Summary of 980416 Meeting W/Entergy Corp Re Standardization of site-specific Security Plans.List of Meeting Attendees & Agenda for Meeting Encl ML20217F4811998-03-26026 March 1998 Summary of 980319 Meeting W/Licensee to Discuss Status of Development of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20203B5741998-02-11011 February 1998 Summary of 980122 Meeting W/Entergy in Rockville,Maryland Re Licensing Issues & Standardization of Licensing Documents. List of Meeting Attendees & Meeting Agenda Encl ML20212G8521997-10-29029 October 1997 Summary of 971022 Meeting W/Entergy Svcs,Inc Re Development & Implementation of Common or Std QAP for All Sites.List of Meeting Attendees & Viewgraphs Encl ML20148F0391997-05-30030 May 1997 Summary of 970521 Meeting W/Entergy Operations,Inc Re Proposed Removal of MSL Lcs,Removal of Pvlc Sys & Increase of MSIV Leakage Requirements in TS ML20140C1681997-03-28028 March 1997 Summary of 970313 Meeting W/Entergy Operations,Inc to Discuss Proposed ECCS Suction Strainer Mod.List of Attendees & ECCS Suction Strainer Mod Encl ML20149M3611996-12-11011 December 1996 Summary of 96111 Meeting W/Licensee in Rockville,Md to Discuss Comments Developed in Response to NRC Advance Notice of Proposed Rulemaking on Financial Assurance Requirements for Decommissioning Nuclear Reactors.List of Attendees Encl ML20134M6611996-11-21021 November 1996 Summary of 961114 Meeting W/Listed Licensees in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSARs for Four Nuclear Reactor Sites.List of Attendees & Licensee Handout Encl ML20056C5251993-06-18018 June 1993 Summary of 930513 Meeting W/Util Re Changes to Security & Response Plans.Meeting Agenda & List of Attendees Encl ML20059C7421993-03-0202 March 1993 Summary of 392nd ACRS Meeting on 921209-11 in Bethesda,Md Re SBO Rule,Ts Improvement Program,Advanced BWR Design,River Bend Nuclear Plant Reliability Monitoring Program & Generic Issue 120,online Testability of Protection Sys ML20055G8611990-07-18018 July 1990 Summary of 900712 Meeting W/Util Re Reload Design Methods. List of Attendees Encl ML20055F0941990-07-10010 July 1990 Summary of 900620 Meeting W/Util Re Proposed License Amends, Including Removal of Snubber Requirements from Tech Specs for Relocation Into Inservice Insp Program & Util Responses to Generic Ltrs 88-01 & 87-09 ML20246B6901989-08-0101 August 1989 Summary of 890727 Meeting W/Util in Arlington,Tx Re Plant Security Enhancement Program & Personnel Changes ML20205A7431988-10-12012 October 1988 Summary of 880928 Meeting W/Util Re 880825 Reactor Trip & Followup Actions by Licensee.Viewgraphs Encl ML20153G6331988-08-30030 August 1988 Summary of Operating Reactor Events Meeting 88-35 on 880830, Including Summary of Reactor Scrams for Wk Ending 880828. Significant Event Identified for Input to NRC Performenance Indicator Program ML20151Z7921988-08-25025 August 1988 Summary of 880817 Meeting W/Util in Rockville,Md Re Util 5-yr Business Plan to Improve Safety & to Reduce Operating Costs at Plant.List of Attendees & Handouts Encl ML20151Z4211988-08-25025 August 1988 Summary of 880818 Meeting W/Util in Rockville,Md Re License Amend Application to Permit Performance of Leak Rate Tests of Containment Isolation Valves in Parallel W/Refueling Operations ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20151R8701988-08-0505 August 1988 Summary of 880726 Meeting W/Util in Arlington,Tx Re 5-yr Business Plan.Handouts Encl ML20154J4061988-05-17017 May 1988 Summary of 880414 Meeting W/Representatives & Contractors of Licensee in Rockville,Md Re 870605 Amend Application for Util.Highlights of Discussion Listed.Nrc Indicated That Request for Addl Info Would Be Prepared If Needed ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20147C8041988-01-0606 January 1988 Summary of 871215 & 16 Meetings W/Util in St Francisville,La Re Questions & Comments Resulting from Review of Inservice Testing Program.Inel Trip Rept,List of Attendees & Questions & Comments Encl ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20235M9151987-07-19019 July 1987 Summary of 870615 Meeting W/Util in Bethesda,Md Re Revs to Util Emergency Operating Procedures & to Satisfy Sser Requirement.Attendee List Encl ML20214A2151987-05-13013 May 1987 Summary of 870508 Meeting W/Util & GE Re Licensee Plans for Fuel Reload.List of Attendees & Meeting Viewgraphs Encl ML20215L3281987-05-0505 May 1987 Summary of Operating Reactors Events Meeting 87-11 on 870420.List of Attendees,Viewgraphs & Input to NRC Performance Indicator Program Encl ML20212Q9681987-04-21021 April 1987 Summary of 870217 Meeting W/Util to Discuss Issues Re Containment Vending,Reg Guide 1.97,TDI Diesels,Util Plans for First Refueling Outage,Engineering Expertise on Shift, UHS Monitor & OL Amends ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20207E2811986-07-16016 July 1986 Summary of Operating Reactors Events Meeting 86-24 on 860714 Re Events Occurring Since 860707 Meeting ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20206G6571986-06-10010 June 1986 Summary of 860529 Meeting W/Util Re Licensing Priorities & Matters Associated W/Forthcoming Transition of Util from Startup Test to Commercial Operation.Attendees List & Viewgraphs Encl ML20211G9361986-06-0606 June 1986 Summary of Operating Reactor Events Meeting 86-18 on 860602 Re Events Occurring Since 860519 Meeting.Attendee List, Events,Significant Elements of Events & Completion Dates for Assignments Encl ML20210R8471986-05-13013 May 1986 Summary of Operating Reactors Events Meeting 86-16 on 860512 Re Events Occurring Since Last Meeting.List of Attendees & Related Info Encl ML20197F7721986-05-0808 May 1986 Summary of Operating Reactors Events Meeting 86-15 on 860505.List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20203M9431986-04-25025 April 1986 Summary of Operating Reactors Events Meeting 86-13 on 860421 Re Events Occurring Since 860414 Meeting.Attendance List, Viewgraphs & Supporting Documentation Encl ML20141G2901986-04-0707 April 1986 Summary of 860313 Meeting W/Mark III Containment Hydrogen Control Owners Group in Bethesda,Md Re Heat Loss Analysis. List of Attendees,Handout & Viewgraphs Encl ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl 1999-07-29
[Table view] |
Text
, .. _
/-?MS - 235%
fae/Ap$ on
. /o M E DATE ISSUED: 9/19/85 fffLf[ff ACRS MEETING HINUTE ON THE RIVER BEND SUBCOMMITTEE SEPTEMBER 11, 1985 WASHINGTON, DC
Purpose:
The ACRS Subcommittee on River Bend met on September 11, 1985 at 1717 H Street, N.W., Washington, DC. The purpose of this meeting was to continue the review of the request of Gulf States Utilities Company (GSU) for a license to operate the River Bend Station, Unit 1. The ACRS had last reported on this subject on July 17, 1984. The GSU request was referred to the ACRS for consideration at the conclusion of the Subcommittee meeting. A letter approving full power operation for River Bend Unit 1 was written at the September 12-14, 1985 ACRS meeting. On September 11, the Subcomittee heard presentations from the NRC Staff (NRR and Region IV) and the Applicant (Gulf States Utilities). The meeting begin at 3:45 pm and was adjourned at approximately 10:00 pm and was held entirely in open session. The principle attendees were as follows:
D. Okrent, Subcommittee Chairman J. C. Mark, Member J. Ebersole, Member C. Wylie, Member R. Savio, ACRS Staff J. Shepherd, ACRS Consultant W. Butler, NRC Staff S. Stern, NRC Staff W. Houston, NRC Staff J. Jaudon, Region IV Staff G. Mazetis, NRR Staff A. Notafrancesco, NRR Staff F. Eltawila, NRR Staff J. Rosenthal, NRR Staff F. Rosa, NRR Staff K. Parczewski, NRR Staff l
C. Berlinger, NRR Staff J. Ridgely, NRR Staff I
W. Reed, GSU J. Booker, GSU J. Deddins, GSU fi. Morris, GSU E. Zoch, GSU UE5IcliATED ORIGIIIAL D. Reynerson, GSU M. Sankovick, GSU Certified Ir/
gp7 8511010421 850919 2 PDR
i l
i River Bend Meeting Minutes September 11, 1985 Highlights:
- 1. The NRC Project Manager on River Bend sumarized the status of the River Bend review. A low power license was issued on August 29, 1985 and the NRC Staff is currently working toward the resolution of the issues relating to the issuance of a full power license.
The Applicant, by his current schedule, estimates that the plant will be ready to exceed 5% power by October 11, 1985 and will have completed all tests and will begin comercial operation by February 1, 1986. The NRC Staff indicated that the principle review issues were the certification of the TDI diesel generators, matters re' lated to the qualification of certain components of the RPS, and the resolution of the hydrogen control issues.
- 2. The issuance of the low power license had been delayed pending the completion of a NRC investigation into drug use by GSU River Bend employees. Certain GSU employees were alleged to have been in-volved in the use of drugs. GSU, at the request of the NRC, re-viewed the work performed by 12 individuals, including 6 field Quality Control Inspectors, and did not find any reason to be concerned as to the quality of the work performed by these indi-viduals. NRR believes that they have enough information to con-clude that the safe operation of the plant has not been affected.
- 3. Region IV reported on the plant readiness for full power operation.
SALP ratings have been high and no generically weak areas have been discovered. GSU management has been found to te responsive in resolving potential problem areas. Staffing is essentially com-plete and Region IV has concluded that the operating staff is experienced in the operation of BWR plants.
i ', .
c River Bend Meeting Minutes September 11, 1985
- 4. The General Electric emergency procedures on containment venting during beyond design basis accidents are described in the General Electric topical report NED0-24934. Plant specific implementation of these emergency procedures are being reviewed by the NRC for individual plants. The presently proposed procedure for River Bend
- specifics an initial venting through a 3" filtered line at a
- containment pressure of 20 psig (design pressure for the contain-
).
ment is 15 psig) with venting through the 36" purge line if the containment pressure reaches 45 psig. Venting through the purge line is likely to result in the rupture of the purge line ducting l
i in the auxiliary building and the subjecting of auxiliary building equipment to a wet steam environment. The Subcommittee raised questions as to the ability of auxiliary building equipment to
- survive this environment. It was noted the some of this equipment was needed to protect the core. GSU will examine this issue i further.
1
- 5. The Hydrogen Control Rule for BWR-Mark III and ice condenser plants was made effective on February 25, 1985. GSU has submitted thic schedule for meeting the requirements of the rule (See Attachment A) and has paced their schedule to the progress of the BWR Hydrogen Control Owners Group (HCOG) experimental work. A hydrogen control system (igniters) has been installed and a preliminary analysis for containment integrity and equipment survivability has been provided. The NRC Staff has evaluated this submittal in the draft SSER No. 4. The NRC Staff has concluded that the preliminary analysis demonstrates that the pressure capacity of the containment is not exceeded during a hydrogen burn and that the survivability of some equipment items has not yet been demonstrated. Information from the HCOG 1/4 scale test will be used in the resolution of this issue. The Subcommittee noted that the CLASIX-3 was used in the analysis and that hydrogen burn experiments have produced different burn mechanisms than what is modeled in the CLASIX-3 methodology.
It was also noted that the River Bend analysis considered a narrow
__ - - . _ . __t _
_ . ~ , _ _ _ _ - . _ . , _ _ _ _ _ . . , .,_,____;..____.______...
o
. River Bend Meeting Minutes September 11, 1985 range of accident scenarios and did not consider a range of model parameters which covered the uncertainty in the interpretation of the experimental results.
- 6. The severe accident performance of the River Bend containment was discussed. It was noted that containment behavior would be evalu-ated within the Severe Accidents Policy process. The River Bend 4
containment differs in significant ways from the Grand Gulf and GESSAR-II containments. This would need to be carefully evaluated within this process.
- 7. GSU has performed a limited PRA in which the Grand Gulf PRA was used. The differences between the River Bend and Grand Gulf plants were evaluated and the Grand Gulf fault tree modified accordingly.
The River Bend PRA has not yet been submitted to the NRC. The seismic margins for some typical DHR equipnient and AC and DC equipment power supplies were reviewed as per the ACRS recomendation. Margins above the SSE were found to be substantial for the equipment reviewed. Some of the results are displayed on pages 1 and 2 of Attachment B.
- 8. The feasibility of developing systems which have a UPPS-type function on the River Bend plant was discussed. The plant has the capability of taking a backup core water supply from the fire mains and, with some modifications, to use mobile water sources such as fire trucks. It was noted that the fire main water supply was engine driven. The SRVs and purge valves do not have the capability for being operated only by compressed air supplies and are dependent on electrical power. GSU is further considering system modifications.
{ NOTE:
Additional meeting details can be obtained from a transcript l of this meeting available in the NRC Public Document Room,
- 1717 H Street, N.W., Washingto1, D.C., or can be purchased from Ann Riley & Associates, Ltd., 1625 I Street, NW, Suite 1
921, Washington, DC 20006,(202)293-3950,
a--
h 9
0 4
1 1
1 if ATTACHMENT A
, - - , - g --. - - - --, . -