Summarizes 850819 Mgt Meeting at Region II Ofc Re Readiness Review Modules 2, Operations Training & Qualification & 5, Operations Organization & Administration. Meeting Beneficial in Conducting Evaluation
ML20133Q190
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 09/10/1985
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
References
NUDOCS 8511010423
Download: ML20133Q190 (4)


Text

, . _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _

o * . D ,,&b e

SEP 101985 Georgia Power Company

/TTN: Mr. R. J. Kelly Executive Vice President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT:

MEETING

SUMMARY

- V0GTLE FACILITY, DOCKET NO. 50-424 This refers to the management meeting conducted at your request in the NRC Region II Office on August 19, 1985. This meeting was held to brief the NRC on the Vogtle Readiness Review Module No. 2 entitled " Operations Training and Qualification" and Module No. 5 " Operations Organization and Administration".

It is our opinion that this meeting was beneficial and has provided 'a comprehen-sive overview of the Vogtle Readiness Review Program and, specifically, the two operations modules presented. This in-depth presentation will better enable the NRC to conduct its evaluation of these modules.

In accordance with Section 2.790 of NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, we will be pleased to discuss them.

Sincerely, s

{d . f f$c J. Nelson Grace Regional Administrator

Enclosure:

Attendance List cc w/ enc 1: (Seepage 2) 0511010423 800910 PDR ADOCK 05 24 Yl 71 45

TQ ,

Georgia Power Company 2 fc'w/ enc 1:

- V R. E. Conway, Senior Vice President Nuclear Power J. O. Foster, Vice President and General Manager Vogtle Project W. H. Gregory, -III. General Manager, Vogtle Nuclear Construction

~ d. Bockhold,1Jr., Vogtle

. Plant Manager J . T. Gucwa, Chief Nuclear Engineer vffuble A. Thomas, Vice President-Licensing Vogtle

. - Project tid Groover, Quality Assurance Site Manager-c,4.,W. Hayes, QA Manager v4. T. Beckham, Vice. President

& General Manager - Operations 4 A. Bailey, Project Licensing Manager LSsorge F. Trowbridge, Erg. ,

'Shaw, Pittman, Potts and Trowbridge d fuce W. Churchill, Esq.

. Jhaw, Pittman, Potts and Trowbridge Trnest L. Blake, Jr., Esq.

Shaw, Pittman, Potts and Trowbridge u)dmes E. Joiner, Troutman, Sanders, Lockerman and Ashmore YamesG.Ledbetter, Commissioner Department of Human Resources (Cfiarles H. Badger, Office of Planning and Budget, Management Review Division-d ppish Kirkland III, Counsel Office of the Cons mer's Utility "

Council fouglas C. Teper, Georgier.:: Against Nuclear Energy daurie Fowler, Esq., Legal Environmental Assistance Foundation Wim Johnson, Executive Director Educational Campaign for a Prosperous Georgia 4 rton B. Margulies Esq., Chairman Aministrative Judge Atomic Safety

/ and Licensing Board Panel

  • Or. Oscar H. Paris, Administrative Judge Atomic' Safety and Licensing Board Panel

. dustave A. Linenberger, Jr., Administrative Judge, Atomic Safety and Licensing Board Panel bec w/encls: (Seepage 3)

r Georgia Power Company 3 SEP 101985

bec'w/ encl
/

E. Reis, ELD M. Sinkule, RII NRC Resident Inspector Document Control Desk State of Georgia l

l i

i l

! RII RII b RII I HRankin:cg MSinkule 5 p VLBrownlee RT C

AFGipson RWalker S

J0 hinski 08/28/85 08/9/85 0844/85 /$/85 08/44/85 8/ 5 7

l l

r SEP 101985 ENCLOSURE ATTENDANCE LIST Nuclear Regulatory Commission R. D. Walker, Director, Division of Reactor Projects (DRP)

A. F. Gibson, Acting Director, Division of Reactor Safety (DRS)

V. L. Brownlee, Chief, Reactor Projects Branch 2, DRP C. A. Julian, Acting Chief, Operations Branch, DRS M. V. Sinkule, Chief, Reactor Projects Section (RPS) 2D, DRP B. T. Debs, Acting Chief, Operational Program Section, DRS G. A. Belisle, Acting Chief, Quality Assurance Program Section, DRS R. M. Latta, Reactor Inspector, DRS W. H. Rankin, Acting Project Engineer, RPS 20, DRP E. W. Brach, Executive Coordinator - Regional Opr. rations, ED0 T. S. Michaels, Vogtle Readiness Review Project Manager, NRR J. F. Rogge, Senior Reeident Inspector, Vogtle J. J. Buzy, Engineer, NRR W. L. Belke, QA Engineer, IE Georgia Power Company D. O. Foster, Vice President ard Project General Manager W. C. Ramsey, Manager - Readiness Review (PR)

G. B. Bockhold, General Manager - Nuclear Operations H. P. Walker, RR Discipline Manager and Assistant Plant Manager S. A. Bradley, RR Team Leader i