1
r
.
pggionATD CRIGILG
Certified 378
'
OCT 2 3'1985
Docket No.
50-423
,
Northeast Nuclear Energy Company
ATTN:
Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject: Inspection No. 50-423/85-30
This refers to the Preoperational Security Program Review conducted by
Mr. William Madden of this office on June 17-21, 1985 at Millstone Unit 3,
Waterford, Connecticut, of activities authorized by NRC Construction Permit
No. CPPR-113 and to the discussions of our findings held by Mr. Madden with
Mr. W. Romberg and other members of your staff at the conclusion of the
inspection.
The review was conducted to assess progress on the development of the Unit 3
Physical Protection Program. Areas examined during this review are described
in the NRC Region I Inspection Report which is enclosed with this letter.
Within these areas, the review consisted of selective examination of proposed
plan and procedural commitments for meeting the requirements of 10 CFR 73.55
and 10 CFR 73.67.
It aisc incluaed discussions with key menbers of the site
security organization and project engineering staff responsible for the
procurement and installation of security systems, equipment and facilities.
Sections of the enclosed NRC Inspection Report have been determined to be
exempt from public disclosure in accordance with 10 CFR 73.21 (Safeguards
Information). Therefore, those sections will net be placed in the NRC Public
Document Room and will receive limited distribution. This letter and the
remainder of the report will be picced in the Pub!1c Document Room, in
accordance with 10 CFR 2.790(a).
No reply to this letter is required.
four cooperation with us in this matter
is appreciated.
Sincerely,
"0FidiEAl'SI'gned3pi
RichardR.Keimig
Thomas T. Martin, Director
Division of Radiation Safety
'and Safeguards
Enclosure: NRC Region I. Inspection Report Number 50-423/85-30(Contains
Safeguards Information (SGI) in Sections 3 and 6)
CFFICIAL RECORD COPY
IR MILL 3 85-30 - 0001.0.0
08/22/85
8511010408 851023
ADOCM 05000423
~
l
3
h
r; _ . -
-
,
.
.
Northeast' Nuclear Energy Company
2
OCT 2 3 1985
f
.cc w/ encl: (w/o Sections-3 and 6 which contain (SGI)
V. Papadopoli, Construction Quality Assurance Supervisor
E. R. Foster, Director of Generation Construction
E. J. Mroczka, Vice President, Nuclear Operations
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
W. D. Romberg, Station Superintendent
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector (w/ Safeguards Information)
LState of Connecticut
C. Gaskin, NMSS (w/ Safeguards Information)
bec w/ encl: (w/o Sections 3 and 6 which contain SGI)
Region I Docket Room (with concurrences)
Senior Operations Officer-(w/o encl)
DRP-Section Chief
G. Walton, SRI,. Beaver Valley Unit 2
.m
c_
!
RI:DRSS
RI: p
RI:
Madden /geb
Ke
g
J
'8/ /85
-)cmyf
/sll*-
.d
\\
-"*"~**
OFFICIAL RECORD COPY
IR MILL 3 85-30 - 0002.0.0
08/22/85
i