Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133P735 + (ML20133P735)
- ML20133P736 + (ML20133P736)
- ML20133P738 + (ML20133P738)
- ML20133P739 + (ML20133P739)
- 05000528/LER-1985-044, :on 850613 & 20,while Radiation Monitor RU-143 Inoperable,Limiting Condition for Operation for Sample Analysis of Plant Vent Monitor Exceeded.Briefing Session Held + (ML20133P740)
- ML20133P741 + (ML20133P741)
- 05000311/LER-1985-011, :on 850707,reactor Tripped from 35% Power During Startup Operations.Caused by Personnel Error. Individual Counseled & 8 H Training Session Conducted for All Licensed Operators + (ML20133P742)
- GO2-97-009, Forwards Rev 34 to WNP-2 Physical Security Plan.Encl Withheld + (ML20133P744)
- ML20133P746 + (ML20133P746)
- ML20133P747 + (ML20133P747)
- ML20133P750 + (ML20133P750)
- ML20133P753 + (ML20133P753)
- ML20133P754 + (ML20133P754)
- ML20133P755 + (ML20133P755)
- ML20133P756 + (ML20133P756)
- ML20133P757 + (ML20133P757)
- ML20133P759 + (ML20133P759)
- ML20133P760 + (ML20133P760)
- NG-97-0059, Monthly Operating Rept for Dec 1996 for Duane Arnold Energy Center + (ML20133P761)
- ML20133P762 + (ML20133P762)
- ML20133P763 + (ML20133P763)
- ML20133P764 + (ML20133P764)
- ML20133P765 + (ML20133P765)
- ML20133P766 + (ML20133P766)
- ML20133P767 + (ML20133P767)
- ML20133P769 + (ML20133P769)
- 05000333/LER-1996-015-01, :on 961218,determined Bypass Flow Path Around Offgas Isolation Valve.Caused by Design Deficiency.Installed Check Valve in Common Drain Line to Prevent Reverse Flow from Steam Jet Air Ejector Discharge + (ML20133P770)
- ML20133P771 + (ML20133P771)
- ST-HL-AE-1450, Forwards Response to Draft SER or FSAR Items.Attachment Includes marked-up FSAR Page Re Pipe Rupture Loads Used in Containment Design Which Will Be Incorporated in Future FSAR Amends + (ML20133P772)
- ML20133P773 + (ML20133P773)
- ST-HL-AE-1436, Forwards Response to Draft SER Item 3.6-1 Re Criteria Used for Selecting Postulated Break Locations Types in ASME Class 1,2 & 3 piping.Mark-up FSAR Pages Will Be Incorporated in Future FSAR Amend + (ML20133P774)
- ML20133P777 + (ML20133P777)
- ML20133P778 + (ML20133P778)
- ML20133P781 + (ML20133P781)
- ML20133P782 + (ML20133P782)
- ML20133P783 + (ML20133P783)
- ML20133P784 + (ML20133P784)
- ML20133P785 + (ML20133P785)
- ML20133P786 + (ML20133P786)
- ML20133P787 + (ML20133P787)
- RC-96-0206, Forwards 15th Yr Physical Surveillance Rept of Facility Containment Bldg,Per NRC Request + (ML20133P789)
- ML20133P790 + (ML20133P790)
- ML20133P791 + (ML20133P791)
- B11777, Forwards Response to Request for Addl Info Re 850724 Application to Revise Tech Specs on Spent Fuel Storage Capacity + (ML20133P792)
- ML20133P795 + (ML20133P795)
- ST-HL-AE-1446, Forwards Response to Listed Draft SER or FSAR Items Re Filter Housing Drain Sys for Steam Generator Tube Rupture. Mark-up FSAR Pages Will Be Incorporated in Future FSAR Amend + (ML20133P798)
- 05000416/LER-1985-026, :on 850621,flanges Used to Perform Airlock Overall Leakage Barrel Tests Not Local Leak Rate Tested. Caused by Incorrect Conclusions of 1983 Review.Flanges Tested & Added to Surveillance Procedures + (ML20133P799)
- ML20133P800 + (ML20133P800)
- 05000413/LER-1996-012, :on 961211,auxiliary Feedwater Sys Found Outside Design Basis Occurred.Caused by Initial Design Oversight.Minor Mods Were Completed to Add Check Valves to Each Unit + (ML20133P801)
- ML20133P802 + (ML20133P802)
- ML20133P804 + (ML20133P804)