ML20133P750

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/85-20. Documentation Re Component Cooling Water Safety Valve PSV-3323A Repairs Requested
ML20133P750
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 10/28/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Withers B
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20133P753 List:
References
NUDOCS 8511010170
Download: ML20133P750 (1)


See also: IR 05000344/1985020

Text

1

sB

4

OCT 2 81985

,

Docket No.

50-344

. Portland General Electric Company

121 S. W. Salmon Street

Portland, OR 97204

Attention:

Mr. Bart D. Withers

Vice President, Nuclear

Gentlemen:

Thank you for your letter dated September 26, 1985, informing us of the steps

you have taken to correct the items which we brought to your attention in our

letter dated August 27, 1985.

On the subject of Component Cooling Water (CCW)

Safety Valve PSV-3323A testing, we request that you provide documentation on

what repair actions were accomplished on valve PSV-3323B, what was found and

evaluation notes to support the statement in your letter, that there was no

reason to suspect a common mode failure. Your corrective actions will be

verified during a future inspection.

Your cooperation with us is ap reciated.

Sincerely,

Origind signed by

D. F. Kirsds

D. F. Kirsch, Acting Director

Division of Reactor Safety and

Projects

cc:

W. Dixon, DOE

bec:

RSB/ Document Control Desk (RIDS)-

Mr. J. Martin

Mr. B. Faulkenberry

G. Cook

Resident Inspector

RV(

/

~

c

DPer tra:dh

CClark

RDo

TYoung

AChaffee

DKirs i

10/l

/85

10////85

10) /85 10//)/85

10/v7/85

10g/85

\\

gassek

c-/

O