Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133N132 + (ML20133N132)
- HBL-85-050, Forwards Rev 1 to Custodial Safstor Physical Security Plan. Rev Withheld (Ref 10CFR73.21) + (ML20133N133)
- IR 05000293/1985017 + (ML20133N134)
- ML20133N136 + (ML20133N136)
- 1CAN088502, Submits Changes Re Results of Calculations to Evaluate Impact of NUREG-0630 on LOCA Kw/Ft Units,In Response to Recent Questions About Use of New Flecset Heat Transfer Correlation as Compensating Model to Offset Kw/Ft Penalties + (ML20133N139)
- ML20133N140 + (ML20133N140)
- ML20133N141 + (ML20133N141)
- ML20133N142 + (ML20133N142)
- ML20133N144 + (ML20133N144)
- ML20133N146 + (ML20133N146)
- ML20133N148 + (ML20133N148)
- ML20133N149 + (ML20133N149)
- ML20133N150 + (ML20133N150)
- ML20133N153 + (ML20133N153)
- ML20133N154 + (ML20133N154)
- ML20133N155 + (ML20133N155)
- ST-HL-AE-1435, Forwards Responses to Draft SER & Draft FSAR Items Re Section 3.11N on Environ Design of Mechanical & Electrical Equipment.Info Will Be Incorporated in Future FSAR Amend + (ML20133N156)
- 05000361/LER-1996-011, :on 961216,air Operated Containment Isolation Valve Declared Inoperable.Caused by Two Separate Errors Could Have Caused Valve 2HVO513 to Have Insufficient Closing Force.Edison Will Reset & Retest Valve 2HV0513 + (ML20133N157)
- ML20133N158 + (ML20133N158)
- ML20133N159 + (ML20133N159)
- BECO-85-143, Forwards Fee for 850129 Application for Amend to License DPR-35 Re Equipment Qualification Extension + (ML20133N160)
- ML20133N163 + (ML20133N163)
- ML20133N165 + (ML20133N165)
- ML20133N166 + (ML20133N166)
- ML20133N167 + (ML20133N167)
- ML20133N168 + (ML20133N168)
- ML20133N169 + (ML20133N169)
- PNO-III-85-092, on 851023,reactor Failed to Trip Automatically Following High Flux Alarm.Cause Undetermined. Reactor Shut Down Pending Results of Investigation + (ML20133N170)
- ML20133N171 + (ML20133N171)
- ML20133N172 + (ML20133N172)
- ML20133N173 + (ML20133N173)
- ML20133N175 + (ML20133N175)
- ML20133N177 + (ML20133N177)
- ML20133N178 + (ML20133N178)
- ML20133N182 + (ML20133N182)
- ML20133N183 + (ML20133N183)
- ML20133N184 + (ML20133N184)
- 05000325/LER-1985-050, :on 850918,six Automatic Isolations of Control Bldg HVAC Sys Occurred.Caused by Spurious Sys Air Intake Chlorine Alarms.Functional Tests of Chlorine Detectors Performed & HVAC Sys Returned to Svc + (ML20133N185)
- ML20133N186 + (ML20133N186)
- ML20133N187 + (ML20133N187)
- ML20133N188 + (ML20133N188)
- ML20133N189 + (ML20133N189)
- ML20133N190 + (ML20133N190)
- ML20133N191 + (ML20133N191)
- ML20133N192 + (ML20133N192)
- ML20133N193 + (ML20133N193)
- ML20133N195 + (ML20133N195)
- 05000482/LER-1996-020, :on 961015,failure to Comply with TS Action Statement 3.6.1.7.a Occurred.Caused by Misalignment Between Organizational Culture & Regulatory Environ.Surveillance Procedure STS PE-015 Was Revised + (ML20133N196)
- ML20133N198 + (ML20133N198)
- IR 05000245/1985019 + (ML20133N199)
- LD-97-002, Part 21 Rept Re Piping Line Loss Between SG & MSIV Inlet When MSSVs Area Activated.Recommends That Utils Confirm Proper Adjustment of MSSV Blowdown Settings So as to Preclude Valve Chatter & Related Structural Concerns + (ML20133N201)