Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000715/2009030 + (ML20133N108)
- ML20133N109 + (ML20133N109)
- ML20133N110 + (ML20133N110)
- ML20133N111 + (ML20133N111)
- ML20133N112 + (ML20133N112)
- ML20133N113 + (ML20133N113)
- ML20133N114 + (ML20133N114)
- IR 05000461/1985041 + (ML20133N115)
- IR 05000613/2007015 + (ML20133N116)
- ML20133N117 + (ML20133N117)
- ML20133N118 + (ML20133N118)
- IA-96-526, Notifies That Company Has Delinquent Debts W/Nrc.Total Indebtedness Due within 15 Calendar Days of Notification Ltr or Order Suspending License Will Be Prepared + (ML20133N118)
- IR 05000909/2010019 + (ML20133N120)
- ML20133N121 + (ML20133N121)
- 05000331/LER-1985-039, :on 850918,RCIC-to-vessel Inject Valve BN-20-2512 Failed to Open on Demand.Possibly Caused by Unnecessarily High Setting of Valve Torque Switch.Switch Placed at Lower Setting + (ML20133N122)
- 05000369/LER-1985-026-01, :on 850911,vendor-employed Minor Exposed in Excess of Quarterly Dose Limit of 125 Mrem.Caused by Individual Misrepresenting Age to Work in Radiation Control Area.Birth Dates Will Be Verified + (ML20133N123)
- ML20133N124 + (ML20133N124)
- IR 05000461/1985047 + (ML20133N126)
- ML20133N127 + (ML20133N127)
- B078509, Certifies That Amend 3 to Updated SARs for Arkansas Nuclear One Sent Under Separate Cover,Per 10CFR50.71 + (ML20133N128)
- ML20133N129 + (ML20133N129)
- ML20133N130 + (ML20133N130)
- ML20133N132 + (ML20133N132)
- HBL-85-050, Forwards Rev 1 to Custodial Safstor Physical Security Plan. Rev Withheld (Ref 10CFR73.21) + (ML20133N133)
- IR 05000293/1985017 + (ML20133N134)
- ML20133N136 + (ML20133N136)
- 1CAN088502, Submits Changes Re Results of Calculations to Evaluate Impact of NUREG-0630 on LOCA Kw/Ft Units,In Response to Recent Questions About Use of New Flecset Heat Transfer Correlation as Compensating Model to Offset Kw/Ft Penalties + (ML20133N139)
- ML20133N140 + (ML20133N140)
- ML20133N141 + (ML20133N141)
- ML20133N142 + (ML20133N142)
- ML20133N144 + (ML20133N144)
- ML20133N146 + (ML20133N146)
- ML20133N148 + (ML20133N148)
- ML20133N149 + (ML20133N149)
- ML20133N150 + (ML20133N150)
- ML20133N153 + (ML20133N153)
- ML20133N154 + (ML20133N154)
- ML20133N155 + (ML20133N155)
- ST-HL-AE-1435, Forwards Responses to Draft SER & Draft FSAR Items Re Section 3.11N on Environ Design of Mechanical & Electrical Equipment.Info Will Be Incorporated in Future FSAR Amend + (ML20133N156)
- 05000361/LER-1996-011, :on 961216,air Operated Containment Isolation Valve Declared Inoperable.Caused by Two Separate Errors Could Have Caused Valve 2HVO513 to Have Insufficient Closing Force.Edison Will Reset & Retest Valve 2HV0513 + (ML20133N157)
- ML20133N158 + (ML20133N158)
- ML20133N159 + (ML20133N159)
- BECO-85-143, Forwards Fee for 850129 Application for Amend to License DPR-35 Re Equipment Qualification Extension + (ML20133N160)
- ML20133N163 + (ML20133N163)
- ML20133N165 + (ML20133N165)
- ML20133N166 + (ML20133N166)
- ML20133N167 + (ML20133N167)
- ML20133N168 + (ML20133N168)
- ML20133N169 + (ML20133N169)
- PNO-III-85-092, on 851023,reactor Failed to Trip Automatically Following High Flux Alarm.Cause Undetermined. Reactor Shut Down Pending Results of Investigation + (ML20133N170)
- ML20133N171 + (ML20133N171)