Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133N015 + (ML20133N015)
- ML20133N016 + (ML20133N016)
- IR 05000293/1985014 + (ML20133N018)
- ML20133N019 + (ML20133N019)
- ML20133N020 + (ML20133N020)
- ML20133N021 + (ML20133N021)
- ML20133N022 + (ML20133N022)
- ML20133N023 + (ML20133N023)
- ML20133N025 + (ML20133N025)
- ML20133N028 + (ML20133N028)
- ML20133N029 + (ML20133N029)
- IR 05000812/2009023 + (ML20133N030)
- IR 05000461/1985045 + (ML20133N034)
- ML20133N035 + (ML20133N035)
- ML20133N037 + (ML20133N037)
- U-600214, Forwards Rev 3 to Record Verification Program Plan,Clinton Power Station. Listed Changes Include Mgt Responsibility for Functions of Baldwin Assoc Review Group & Discontinuance of QA Surveillance Program + (ML20133N038)
- ML20133N039 + (ML20133N039)
- IR 05000341/1985041 + (ML20133N040)
- ML20133N041 + (ML20133N041)
- ML20133N042 + (ML20133N042)
- ML20133N043 + (ML20133N043)
- IR 05000354/1985042 + (ML20133N045)
- ML20133N046 + (ML20133N046)
- ML20133N047 + (ML20133N047)
- ML20133N048 + (ML20133N048)
- ML20133N050 + (ML20133N050)
- ML20133N051 + (ML20133N051)
- ML20133N052 + (ML20133N052)
- B11732, Forwards Startup Test Rept,Cycle 7. Criticality Achieved on 850630 & 100% Power Reached on 850711 Following end-of-Cycle 6 Refueling Outage + (ML20133N054)
- ML20133N055 + (ML20133N055)
- JPN-97-002, Provides Correction to 961223 Response to RAI Re Analyses at Power Uprate Conditions + (ML20133N056)
- ML20133N057 + (ML20133N057)
- ML20133N058 + (ML20133N058)
- ML20133N059 + (ML20133N059)
- ML20133N060 + (ML20133N060)
- ML20133N064 + (ML20133N064)
- ML20133N065 + (ML20133N065)
- ML20133N066 + (ML20133N066)
- ML20133N067 + (ML20133N067)
- ML20133N068 + (ML20133N068)
- U-600295, Forwards Response to 850913 Request for Addl Info Re NRC Concurrence to Terminate Overinsp Program for Electrical Hangers,Hvac Duct & Duct Supports & Cable Tray,Conduit & Cable Terminations + (ML20133N069)
- ML20133N070 + (ML20133N070)
- ML20133N071 + (ML20133N071)
- ML20133N074 + (ML20133N074)
- ML20133N075 + (ML20133N075)
- ML20133N076 + (ML20133N076)
- ML20133N077 + (ML20133N077)
- ML20133N079 + (ML20133N079)
- PY-CEI-NRR-0308, Clarifies Position Re Testing & Insp to Be Performed Following 100 H Preoperational Testing of Tdi Diesel Generators.Turbocharger W/Highest Recorded Exhaust Temp During Longest Continuous Full Load Run Will Be Inspected + (ML20133N084)
- ML20133N085 + (ML20133N085)
- ML20133N086 + (ML20133N086)