Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BECO-85-183, Responds to 850618,0725 & 0807 Requests for Addl Info Re Generic Ltr 84-09 Concerning 10CFR50.44(c)(3) Requirements & Suppls 850521 Commitments.Svc Air Connecting Valve tie-wrapped & Added to Procedure 8.C.13 on 850626 + (ML20133H588)
- ML20133H590 + (ML20133H590)
- ST-HL-AE-1398, Forwards marked-up FSAR Pages in Response to Draft SER Open Item 15.4-2 Re Dropped Rod Analysis.Response Will Be Incorporated in Future FSAR Amend + (ML20133H591)
- RBG-21-459, Forwards Revs to Physical Security Plan Re Receipt & Storage of Nuclear Fuel Bundles,Per 10CFR73.67,for Inclusion in 841115 Revised Application.Withheld (Ref 10CFR2.790(d)) + (ML20133H592)
- PNO-I-85-077, on 851008,radiographer Received Whole Body Dose of 15.5 Rem.Caused by Failure to Retract 100-Ci Ir-192 Source to Shielded Position in Exposure Device.Radiographer Removed from Radiation Work for Remainder of Quarter + (ML20133H593)
- 05000382/LER-1985-032, :on 850704,reactor Trip Occurred Due to Axial Shape Index Being Out of Range Allowed by Core Protection Calculator.Caused by Xenon Distribution.Plant Operators Given Temporary Guidance on Returning Power + (ML20133H594)
- ML20133H596 + (ML20133H596)
- ML20133H597 + (ML20133H597)
- ML20133H598 + (ML20133H598)
- ML20133H599 + (ML20133H599)
- ML20133H600 + (ML20133H600)
- AECM-85-0311, Responds to Violations Noted in Insp Rept 50-416/85-24. Corrective Actions:Training Given to Shift Health Physics Personnel & Disciplinary Action Taken Against Supervisor & Subordinate Health Physicists + (ML20133H601)
- ML20133H602 + (ML20133H602)
- 05000382/LER-1985-033, :on 850705,high Level Reactor Trip Setpoint Occurred During Attempt to Transfer Feedwater Pump Load from Main Feedwater Pump B to A.Caused by Impurities in Control Oil for Valve Positioner.Oil Replaced + (ML20133H604)
- ML20133H605 + (ML20133H605)
- ML20133H606 + (ML20133H606)
- ML20133H607 + (ML20133H607)
- ST-HL-AE-1416, Responds to Draft SER Confirmatory Item 0.0-4 Re Confirmatory Test Described in IE Bulletin 80-06.Revised Response to Question 032.43 Committing to Testing Required by Action 2 of Bulletin Encl + (ML20133H609)
- IR 05000416/1984054 + (ML20133H610)
- ST-HL-AE-1401, Forwards Response to Draft SER or FSAR Items,Including marked-up FSAR Pages to Be Incorporated in Future FSAR Amend.List of Draft SER & FSAR Open & Confirmatory Items & Open NRC Questions Provided + (ML20133H611)
- ML20133H612 + (ML20133H612)
- ML20133H613 + (ML20133H613)
- ML20133H614 + (ML20133H614)
- ML20133H617 + (ML20133H617)
- IA-85-354, Final Response to FOIA Requests for Documents Re Contacts Between Nrc/Doe & White House Officials Concerning Callaway, Diablo Canyon & Shearon Harris Plants.Forwards Listed Documents.Documents Also in PDR + (ML20133H617)
- ML20133H619 + (ML20133H619)
- NLS8500282, Submits Mods to Be Completed After 1986 Outage to Meet ATWS Rule Requirements in 10CFR50.62 & Generic Ltr 85-06 Re QA Guidance for nonsafety-related ATWS Equipment + (ML20133H620)
- ML20133H622 + (ML20133H622)
- ST-HL-AE-1393, Forwards Response to Draft SER or FSAR items.Marked-up FSAR Pages,Which Will Be Incorporated in Future FSAR Amend,Encl + (ML20133H623)
- ML20133H624 + (ML20133H624)
- 05000250/LER-1985-006, :Redundant Raw Water Tank II Installed,Which Holds 300,000 Gallons of Water Dedicated to Fire Suppression.New Raw Water Tank II Meets App R Iii.A Requirements Approved by NRC on 811109 + (ML20133H625)
- ST-HL-AE-1405, Forwards Response to Draft SER or FSAR Items Re ASHRAE, Including marked-up FSAR Pages to Be Incorporated in Future FSAR Amend.List of Draft SER & FSAR Open & Confirmatory Items & Open NRC Questions Provided + (ML20133H626)
- 1CAN068501, Monthly Operating Rept for May 1985 + (ML20133H627)
- ML20133H628 + (ML20133H628)
- ML20133H630 + (ML20133H630)
- 05000259/LER-1985-030, :on 850705,deficiency Found in Testing Requirements for Primary Containment Isolation Valves 1-55 & 1-56.Caused by Tech Specs Not Being Revised.Status of Valves Changed to Normally Open + (ML20133H632)
- ML20133H633 + (ML20133H633)
- ML20133H634 + (ML20133H634)
- ML20133H635 + (ML20133H635)
- DCL-85-321, Requests Registration as User of Model CNS 14-215 + (ML20133H636)
- ML20133H637 + (ML20133H637)
- ML20133H638 + (ML20133H638)
- ML20133H639 + (ML20133H639)
- 05000219/LER-1985-017, :on 850708,drywell Bulk Average Temps Exceeded. Cause Under Investigation But Appears to Be Associated W/Cooler Design Capacities.Addl Thermocouples at Lower Elevation in Drywell Utilized + (ML20133H640)
- ML20133H641 + (ML20133H641)
- IR 05000302/1985022 + (ML20133H642)
- ML20133H643 + (ML20133H643)
- 05000325/LER-1985-037, :on 850710,reactor Protection Sys Trip,Group 1 Isolation,Start of Standby Gas Treatment Sys & Isolation of Reactor Bldg Ventilation Sys Occurred.Caused by Increased Radiation Levels from Radiography + (ML20133H645)
- ML20133H646 + (ML20133H646)
- ML20133H647 + (ML20133H647)
- ML20133H649 + (ML20133H649)