Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- U-600164, Advises That Util Responses to NUREG-0737,TMI Action Plan Item III.D.1.1 Re Leakage Reduction Program Described in Fsar,App D.Surveillance Tests on Identified Piping Sys Will Be Completed After Fuel Load & Results Submitted by 860430 + (ML20133F411)
- ML20133F412 + (ML20133F412)
- IR 05000412/1985018 + (ML20133F413)
- ML20133F414 + (ML20133F414)
- ML20133F415 + (ML20133F415)
- ML20133F416 + (ML20133F416)
- B11736, Forwards Addl Responses to Questions Raised Re Proof & Review Tech Specs.Marked-up Tech Specs Encl + (ML20133F419)
- ML20133F421 + (ML20133F421)
- ML20133F422 + (ML20133F422)
- ML20133F423 + (ML20133F423)
- ML20133F424 + (ML20133F424)
- ML20133F426 + (ML20133F426)
- RBG-21798, Discusses Util Commitment to Provide Valve Indication in Main Control Room When Power Removed from RHR Shutdown Cooling Mode Valve 1E12*MOVF008 During Operation.Power Removed Via Keylocked Switch at Motor Control Ctr + (ML20133F427)
- ML20133F428 + (ML20133F428)
- ML20133F429 + (ML20133F429)
- ML20133F430 + (ML20133F430)
- ML20133F431 + (ML20133F431)
- ML20133F432 + (ML20133F432)
- ML20133F433 + (ML20133F433)
- ML20133F434 + (ML20133F434)
- ML20133F435 + (ML20133F435)
- ML20133F436 + (ML20133F436)
- ML20133F437 + (ML20133F437)
- ML20133F439 + (ML20133F439)
- ML20133F440 + (ML20133F440)
- ML20133F441 + (ML20133F441)
- ML20133F442 + (ML20133F442)
- B11717, Forwards Evaluations of Integrated Safety Assessment Program,Topic 2.14,Evaluation & Implementation of NUREG-0577 & Topic 2.15, Torque Switch Evaluation for Motor-Operated Valves, for Review + (ML20133F443)
- ML20133F444 + (ML20133F444)
- ML20133F445 + (ML20133F445)
- IR 05000456/1985044 + (ML20133F446)
- ML20133F447 + (ML20133F447)
- ML20133F448 + (ML20133F448)
- ML20133F450 + (ML20133F450)
- ML20133F451 + (ML20133F451)
- IR 05000395/1985013 + (ML20133F452)
- ML20133F453 + (ML20133F453)
- ML20133F454 + (ML20133F454)
- ML20133F455 + (ML20133F455)
- ML20133F456 + (ML20133F456)
- ML20133F457 + (ML20133F457)
- ML20133F458 + (ML20133F458)
- U-600292, Forwards Evacuation Time Estimates for Clinton Power Station Plume Exposure Pathway Emergency Planning Zone, Per Rev 1 to NUREG-0654/FEMA-REP-1, Criteria for Preparation & Evaluation of Radiological Emergency Response Plans.. + (ML20133F459)
- IR 05000298/1996029 + (ML20133F460)
- ML20133F461 + (ML20133F461)
- 05000277/LER-1985-009-02, :on 850629,full Scram & Groups I,Ii & III Isolation Occurred W/Unit in Cold Shutdown.Caused by False Low Level Signal During Backfilling.Signal Reset & Use of Portable Backfilling Device Suspended + (ML20133F462)
- IR 05000293/1985022 + (ML20133F463)
- ML20133F465 + (ML20133F465)
- ML20133F467 + (ML20133F467)
- ML20133F468 + (ML20133F468)
- ML20133F470 + (ML20133F470)