ML20133F426

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/85-44 & 50-457/85-43 on 850822-0905.No Violation Noted
ML20133F426
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/04/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20133F428 List:
References
NUDOCS 8510110029
Download: ML20133F426 (2)


See also: IR 05000456/1985044

Text

.

-%

OCT 4 1985

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special safety inspection conducted by Mr. R. Mendez

of this office on August 22 through September 5, 1985, of activities at

Braidwood Station, Units 1 and 2, authorized by NRC Construction Permits

No. CPPR-132 and No. CPPR-133 and to the dissussion of our findings with

Mr. L. Kline at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Cet $ 21 C'C=3 by T.~J.IN M '

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection Reports

No. 50-456/85044(DRS);

No. 50-457/85043(DRS)

See Attached List For Distribution

8510110029 B51004

PDR ADOCK 05000456

G PDR y

____- ____ - ____ _ __ - _ JS)

- --

.

.

Commonwealth Edison Company 2 OCT 4 1985

Distribution:

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

,

J. F. Gudac, Plant Manager

C. W. Schroeder, Licensing and

Compliance Superintendent

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

'

Phyllis Dunton, Attorney

General's Office, Environmental

l Control Division

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

.

E. Chan, ELD

l J. Stevens, NRR

I The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

l The Honorable Richard F. Cole, ASLB

,

i

l

t

i

l

l

l

l

,

$4

RIII RIII & I RIII $

$101 l p G/ A

W /& fW *

!

Mendez/jp Wo)liams 'Li lite Love ri n ae1

09 ti . . " *lls ypp i.,fffff

!