ML20133F451

From kanterella
Jump to navigation Jump to search
Forwards Radiological Safety Insp Rept 50-293/85-22 on 850819-23.No Violations Noted.Addl Mgt Attention Warranted for Review of Radiological Controls Preparation & Planning for Upcoming Fuel Pool Work
ML20133F451
Person / Time
Site: Pilgrim
Issue date: 10/07/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20133F455 List:
References
CON-#487-5021 2.206, NUDOCS 8510110040
Download: ML20133F451 (2)


See also: IR 05000293/1985022

Text

  • e

4

OCT 7 1985

Docket No. 50-293 License No. DPR-35

Boston Edison Company M/C Nuclear

ATTN: Mr. William D. Harrington

Senior Vice President, Nuclear

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject:50-293/85-22

A routine, radiological safety inspection was conducted by Mr. R. L. Nimitz

of this office on August 19-23, 1985, at the Pilgrim Nuclear Power Station,

Plymouth, Massachusetts. The inspection findings were discussed with

Mr. A. L. Oxsen.

The inspection covered: status of previous findings, implementation of the

Radiological Improvement Program, unplanned releases, and radiological controls

for Fuel Pool work.

No violations were identified. The inspection findings indicate that the

Radiological Improvement Program is being satisfactorily implemented. The

findings also indicate that satisfactory corrective actions were taken for the

recent unplanned releases from the machine shop and sewage system. Review of

your radiological controls preparation and planning for upcoming fuel pool work

indicates that, at the time of this inspection, little preparation and planning

had been performed. Additional management attention to this matter appears

warranted.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Or! Ainfil :Ilmw1 mr t

Thomas T. liartin, Director

Division of Radiation Safety

and Safeguards

Enclosure: NRC Region ! Inspection Report No. 50-293/85-22

Ohk kDON

G

[

OFFICIAL RECORD COPY IR PILGRIM 85-22 - 0001.0.0 /

09/30/85 /

~.4

,.

.-

Boston Edison Company M/C Nuclear 2

cc w/ encl:

A. V. Morisi, Manager, Nuclear Management Services Department

'

C. J. Mathis, Station Manager

Joanne Shotwell, Assistant Attorney General

Paul Levy, Chairman, Department of Public Utilities

W. J. Nolan, Chairman, Plymouth Board of Selectmen

Plymouth Civil Defense Director

Senator Edward P. Kirby

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bec w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encl)

l Section Chief, DRP

'

W. Raymond, SRI, Vermont Yankee

T. Shediosky, SRI, Millstone 1&2

H. Eichenholz, SRI, Yankee

P. Leech, LPM, NRR

l

l

l

l

i

!

l

!

i

RI:DRSS RI

M

RI:DRSS

i

'

Nimitz/djh Pa Bellamy

<

! S/'785 h$/h5 l9/$85

gehl4h

0FFICIAL RECORD COPY IR PILGRIM 85-22 - 0001.1.0

09/30/85

-_