Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133C223 + (ML20133C223)
- ML20133C224 + (ML20133C224)
- LIC-96-0202, Informs of Extension to Complete Implementation of Mod MR-FC-94-017 No Later than End of 1998 Refueling Outage + (ML20133C226)
- ML20133C228 + (ML20133C228)
- 05000341/LER-1996-021, :on 961204,automatic Reactor Scram on high-high Scram Discharge Volume During Shutdown Occurred. Caused by Personnel Error.Night Order Was Issued + (ML20133C229)
- ML20133C230 + (ML20133C230)
- ML20133C231 + (ML20133C231)
- ML20133C232 + (ML20133C232)
- ML20133C233 + (ML20133C233)
- ML20133C235 + (ML20133C235)
- TXX-9653, Forwards Interim Change Request ISI-1R4-001,which Updates Rev 4 of CPSES Unit 1 ISI Program Plan + (ML20133C236)
- ML20133C238 + (ML20133C238)
- ML20133C240 + (ML20133C240)
- ML20133C241 + (ML20133C241)
- ML20133C242 + (ML20133C242)
- ML20133C243 + (ML20133C243)
- ML20133C244 + (ML20133C244)
- ML20133C246 + (ML20133C246)
- ML20133C247 + (ML20133C247)
- ML20133C248 + (ML20133C248)
- ML20133C249 + (ML20133C249)
- ML20133C250 + (ML20133C250)
- ML20133C252 + (ML20133C252)
- ML20133C254 + (ML20133C254)
- ML20133C255 + (ML20133C255)
- ML20133C256 + (ML20133C256)
- ML20133C257 + (ML20133C257)
- ML20133C258 + (ML20133C258)
- ML20133C260 + (ML20133C260)
- ML20133C261 + (ML20133C261)
- ML20133C262 + (ML20133C262)
- PNO-I-96-094A, on 970102,missing Ir-192 Radiography Source Located at Air-Algeria Terminal in Algiers,Algeria.Source Will Be Shipped Back to Amersham + (ML20133C263)
- ML20133C265 + (ML20133C265)
- ML20133C267 + (ML20133C267)
- ML20133C270 + (ML20133C270)
- ML20133C274 + (ML20133C274)
- 05000259/LER-1985-034, :on 850629,discovered That 850122 Charcoal Sample Not Shipped Offsite for Vendor Analysis.Sample Lost. Administrative Controls Prepared to Add More Assurance That All Samples Properly Handled + (ML20133C276)
- ML20133C277 + (ML20133C277)
- ML20133C285 + (ML20133C285)
- ML20133C289 + (ML20133C289)
- ML20133C290 + (ML20133C290)
- ML20133C291 + (ML20133C291)
- ML20133C293 + (ML20133C293)
- ML20133C294 + (ML20133C294)
- ML20133C295 + (ML20133C295)
- B11722, Confirms That Portions of CRD Mechanism Do Not Contain Any cold-worked Austenitic Stainless Steel,Including Portions Which Are Part of Rcpb.Requirements of 10CFR50,App a, Criterion 26 Met,Per SER Confirmatory Item 16 + (ML20133C296)
- B11714, Forwards Review of Integrated Safety Assessment Program, Topics 2.29, Feedwater Coolant Injection Assessment Study, 2.30, MSIV Closure Test Frequency & 2.31, LPCI Lube Oil Cooler Test Frequency, Per NRC 850731 Request + (ML20133C300)
- ML20133C302 + (ML20133C302)
- B11534, Forwards Six Requests for Deviations from Branch Technical Position BTP Cmeb 9.5-1 on Guidelines Re Fire Protection,Per Util 840216 Commitment & 840309 Cmeb Review Meeting.Agenda for Meeting & Supporting Documentation Also Encl + (ML20133C305)
- ML20133C306 + (ML20133C306)
- ML20133C307 + (ML20133C307)